Loading...
CM-2020-219 - 8/28/2020Pagel of 3 NoContract Quantity Adjustment/Change Order woIX rev, 01/16 Department: Transportation Department Project Name: 2019 SMP Project A - Residential Type-F Overlay Date: 8/13/20 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Alpha Paving Industries LLC PO Box 6565 Round Rock, TX 78683 512-677-9001 Company Name Address Phone No. Justification SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Amount % Change $4,086,900.00 -$68,563.91 -$68,563.91 $4,018,336.09 0% $50,468.20 1% $50,468.20 1% $4,068,804.29 -$18,095.71 120 15 135 Prepared By: Manny Trinidad, PM - Alpha Paving Industries LLC 8/13/20 Signatur Printed Name, Title, Company Date Approvals Contractor: %� Manny Trinidad, PM - Alpha Paving Industries LLC 8/13/20 Signaturiv Printed Name, Title, Company Date City Project Manager. / C e _ vi� ein =� �ss+� L 3• ZJ Sjgnature o.�t v. Printed Name, Uk Date Mayor/City Manager Signature ' Printed Name, Title Date (' /—�CJ�V'—C—Dq �� Page 2 of 3 Contract Quantity Adjustment/Change Order ROUND ROac rev, 01/16 Project Name: 2019 SMP Project A - Residential Type-F Overlay Quan. Adj./Change Order No.: Change Order Data Item # Item Description Unit Unit Price Amount Contract Time Adjustment iwmmww 11 Gutter Remove an Replace Concrete Valley SF 5 -$700.00 -$3,500.00 0 11 Remove and Replace Concrete Valley Gutter SF 962 $56.10 $53,968.20 15 TOTALS: 50,468.20 15 Page 3 of 3 Contract Quantity Adjustment/Change Order rev, 01/16 Project Name: 2019 SMP Project A - Residential Type-F Overlay Quan. Adj./Change Order No. Ouantity Adiustment Data Bid Item # Item Description Unit Q - Unit Price Amount Contract Time Adjustment 1 Type F HMAC 1.0" TON 645.00 96.00 -$61,920.00 0 Lawman's Ct SY 770.00 Wilderness Path SY 6,210.00 Double File Trail SY 5,396.00 Gulf Way (Removed) SY (8,053.50) SMP -D (Removed) SY (19,955,00) 3 Ede Millin 6' Wide SY (5,110.70) $1.30 -$6,643.91 0 Lawman's Ct SY 123.90 Wilderness Path SY 2,757.20 Double File Trail SY 2,177.80 Gulf Way (Removed) SY (2,417.60) SMP -D (Removed) SY (7,752,00) TOTALS: - 68 563.91 0 - City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Alpha Paving Industries, LLC for the 2019 Street Maintenance Program (SMP) Project A - Residential Type F Overlay. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 8/28/2020 Dept Director: Gary Hudder, Transportation Director Cost: $18,095.71 Indexes: General Self -Financed Construction Attachments: QA-CO #1_part exec Department: Transportation Department Text of Legislative File CM-2020-219 This Quantity Adjustment/Change Order (QA/CO) consists of the subtraction of asphalt repair, concrete curb/gutter and sidewalk, for approximately six (6) streets that were included in the overlay quantities but did not have repair quantities in our original calculations. These streets are being completed in a separate SMP later this year. This QA/CO is also adding concrete valley gutter that has severely deteriorated since our composition of quantities. This work is being added because these streets actually encompass a vast number of concrete failures and issues for one of the areas we are working on and greatly need the repair work. This QA/CO would provide the repair of the true issue underlying the visible problems and allow us the proper foundation to apply an overlay to correct the entire roadway system. The previous contract price was $4,086,900.00 along with this QA/CO of-$18,095.71 will make the new contract price $4,068,804.29. Cost.-$18,095.71 Source of Funds: General Self -Financed Construction City of Round Rock Page 1 Printed on 8/27/2020