CM-2020-242 - 9/11/2020Pagel of 3 Contract Quantity Adjustment/Change Order rev, 01116 Department: Utilities and Environmental Services Project Name: Oak Bluff and Greenfield Drainage Improvements Date: 8/31/20 City Project Change Order/Quantity ID Number OKBLF Adjustment No. 2 Vendor MA Smith Contracting Co., Inc. 15308 Ginger Street, Austin TX 78728 512-990-7640 Company Name Address Phone No. Justification temove 36" pipe, 3 area inlets, force main adjustment, and associated trench safety; QA/CO No. 1 previously provided for return and re -stocking )f the pipe and inlets. Increase concrete riprap and channel excavation necessary to install concrete -lined channel in lieu of aforementioned pipe ind Inlets. Unit price shown in QA/CO No. 1 for installation of casing for Jonah water line was incorrectly entered; this QA/CO No. 2 will add �94.68 to the unit price of $1,700.67 shown in QA/CO No. 1 to adjust the unit price to the price of $1,795.35 quoted by the Contractor. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: Contractor: City Project Manager: Signature ' Mayor/City -� • U Amount % Change $1,770,012.25 $1,250.00' -$15,012.00 -$13,762.00,. $1,756,250.25 $25,013.26 1.42% $94.68 0.01% $25,107.94 1.43% —1 $1,781,358.19-_ $11,345.94 240 0 0 240 Submitted for Ap Danny Halden, P.E., City Engineer, City of Round Rock 8/31/20 Printed Name, Title, Company Date ,A— rovals pp topher R. Lopez MA Smith Contracting Co., Inc. 08/31 /2020 Printed Name, Title, Company Date P.E., City Engineer, City of Round Rock a"' — inted Name, Title Page 2 of 3 Contract Quantity Adjustment/Change Order —tioRo« , rev, 01 16 Project Name: Oak Bluff and Greenfield Drainage Improvements Quan. Adj./Change Order No. Change Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 33 6-inch DI casing for Jonah water line* N/A 1 $94.68 $94.68 0 $0.00 $0.00 $0.00 *Adjustment for incorrect unit price $0.00 listed in QA/CO No. 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 ROI,NCIROCK-Contract Quantity Adjustment/Change Order rev, 01Y 16 Project Name: Oak Bluff and Greenfield Drainage Improvements Quan. Adj./Change Order No.: Quantity Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment AA-4 Pipe, Class III RCP, 36" Dia. L.F. -506 $127.00 -$64,262.00 0 AA-5 PAZD-FG Area Inlet, 4' x 4' EA. -3 $4,500.00 -$13,500.00 0 AA-6 Adjust 6" Wastewater Force Main L.S. -1 $25,000.00 -$25,000.00 0 AA-7 Trench and Excay. Safety Systems L.F. -500 $1.00 -$500.00 0 AA-8 Concrete Rlprap, 5 inch S.Y. 975 $70.00 $68,250.00 0 5 Channel Excavation C.Y. 800 $25.00 $20,000.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - 15 012.00 0 City of Round Rock 1 ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with MA Smith Contracting Co., Inc. for the Oak Bluff and Greenfield Drainage Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/11/2020 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: Indexes: Attachments: OakBluff QA CO No.2 Department: Utilities and Environmental Services Text of Legislative File CM-2020-242 Quantity Adjustment/Change Order No. 2 (QA/CO No. 2) is for the following: 1. QA/CO No. 1 previously provided for the installation of a 6-inch conduit for a water line that had not been identified by Jonah Special Utility District and had been damaged upon construction. QA/CO No. 2 corrects the unit price by $94.68 to accurately match the Contractor's quote for this item. 2. Electric/phone lines that had not been identified by Oncor/AT&T preclude installation of a designed 36-inch storm pipe with inlets behind the residential lots along the south side of Evergreen Drive. QA/CO No. 2 provides for decreases of the previously contemplated entire quantity of 36-inch storm pipe and three of the quantity of inlets. (The cost for return and re -stocking of the pipe and inlets was added previously by QA/CO No. 1.) 3. QA/CO No. 2 increases quantities for excavation and concrete riprap to provide a concrete -lined channel in lieu of the pipe and inlets mentioned in No. 2 above; and eliminates the wastewater force main adjustment and trench safety that would have been necessary in conjunction with the pipe construction. Note that QA/CO No. 2 overall provides for a reduction in the Contract; staff recommends approval. Cost: (-$14.917.32) City of Round Rock Page 1 of 1