CM-2020-245 - 9/11/2020Pagel of 3 Y' R�~OUNO ROCK rev, 01/16 Department: Project Name: Contract Quantity Adjustment/Change Order Utilities & Environmental Services Plant Control System Replacement Project City Project ID Number EPIMP Date: 9/2/20 Change Order/Quantity Adjustment No. 1 Vendor Prime Controls, L.C. 1725 Lakepointe Dr. Lewisville, Texas 75057 972-221-4849 Company Name Address Phone No. Justification This project is a portion of the Brushy Creek Regional Wastewater System (BCRWWS) 10 Million Gallon per Day (MGD) East Wastewater Treatment Plant (WWTP) Expansion project The plant controls for the existing facilities at the plant before the expansion work takes place are getting replaced under this contract. Nearly all of the existing plant controls were reaching their design life, so the timing for replacing them was good and Is being done just ahead of the actual plant expansion work. This work Is titled Phase A of the Plant Control System Replacement project and this work was awarded and Is currently being performed by Prime Controls, L.C. Phase 8 of this work will be performed by Prime Controls, L.C. as a subcontractor under Thalle Construction Company as a part of the overall 10 MGD East WWTP Expansion project. This Is change order number 1 in the amount of $15,739.61 to make electrical conduit and wiring changes along with modifications to one of the Programable Logic Controllers (PLC) to accommodate 10 sensors not shown on the original plans. These sensors will read the temperature, and pressure of the seal water to the Return Activated Sludge (RAS) and Waste Activated Sludge (WAS) pumps. The sensors then relay this Information back to the operating software, aka SCADAsystem where the operators can monitor the information. SUMMARY Amount % Change Original Contract Price: $1,310,420.00 Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval 210 0 0 210 $0.00 $0.00 $1,310,420.00 $15,739.61 $15,739.61 $1, 326,159.61 $15,739.61 0% Prepared By: /s/ David Freireilph, PE David Freireich, PE, Chief Utility Engineer, CORR 9/5/20 Signature �_ Printed Name, Title, Company - ---- Date Approvals Contractor: /s/ Alfo arz Alfonso Garza, Project Manager, Prime Controls, L.C. 9/2/20 Signat Printed Name, Title, Company Date City Project Manager: /s/ David Freir David Freireich, PE, Chief Utility Engineer, CORR 9/5/20 Signature VVP inted Name, Title Date Mayor/City Manager � Page 2 of 3 Contract Quantity Adjustment/Change Order ROUND ROCK TEXA$ rev, 01/16 Project Name: Plant Control System Replacement Project Quan. Adj./Change Order No Change Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 add conduit and electrical for WAS/RAS 1 1 $15,739.61 $15,739.61 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Prime Controls for the BCRWWS - East Plant Control System Replacement Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/11/2020 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $15,739.61 Indexes: Regional Wastewater Projects Attachments: CO No. 1—Partially executed Department: Utilities and Environmental Services Text of Legislative File CM-2020-245 The Plant Control System Replacement project is a portion of the overall Brushy Creek Regional Wastewater System (BCRWWS) 10 million gallon per day (MGD) East Wastewater Treatment Plant (WWTP) Expansion project. The plant controls for the existing facilities at the plant, before the expansion work takes place, are getting replaced under this contract. Nearly all of the existing plant controls were reaching their design life, so the timing for replacing them was good and is being done just ahead of the actual plant expansion work.This work is titled Phase A of the Plant Control System Replacement project and this work was awarded and is currently being performed by Prime Controls, L.C. Phase B of this work will be performed by Prime Controls, L.C. as a subcontractor under Thalle Construction Company as a part of the overall 10 MGD East WWTP Expansion project. This Change Order No. 1 in the amount of $15,739.61 is for electrical conduit and wiring changes along with modifications to one of the Programable Logic Controllers (PLC) to accommodate 10 sensors not shown on the original plans. These sensors will read the temperature and pressure of the seal water to the Return Activated Sludge (RAS) and Waste Activated Sludge (WAS) pumps. The sensors then relay this information back to the operating software, aka SCADA system where the operators can monitor the information. Round Rock's participation in this cost is 12%, which is $1,888.75. The partner Cities will be responsible for the remainder. Cost: $15,739.61 Source of Funds: Regional Wastewater Projects City of Round Rock Page 1 of 1