R-2020-0254 - 9/10/2020RESOLUTION NO. R-2020-0254 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Prota Construction, Inc. & Prota Inc. J.V. for the Pressure Reducing Valves 2, 4, 9 and BCRUA Valve & Line Extension Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Prota Construction, Inc. & Prota Inc. J.V. for the Pressure Reducing Valves 2, 4, 9 and BCRUA Valve & Line Extension Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 5 51, Texas Government Code, as amended. RESOLVED this loth day of September, 2020. CRAIG RG ,Mayor City of Round ock, Texas ATTEST: , ftvv * SARA L. WHITE, City Clerk 01 12.20202, 00453920 rEXHIBIT I "A"t Page I o f 3 Contract Quantity Adjustment/ Change Order rev, 01116 Department: Utilities & Environmental Services Project Narne. PRV #2f #4j #9 & BCRUA and Line Extension Date: 6/30/20 City Project Change Order/Quantity ID Number SEPMP AdjUstment No. Vendor PROTA Constniction 1,Ir PROTA Ific., IN. P.O. Box 342195 Austin, TX 78734 Company Name Address Phone No, Justification Several Change Order Proposals SUMMARY Original Contract Price: Previous Quantity Adjustment's): This Quartity Adjustment - Total Quartity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s).- "his Change Order - 'Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustmentks) Plus Change Order(s)]: Prepared By- ....... ... 270 Days 0 Days 54 Days 324 Days ................ f6r. M" Printed Name,, Ttle,, Company Date Approvals Printed Name, Title, Company T Jt,7k2qL,, . Primes Name, i itie Mayor/City Manager Signature Printed Name, Title Date Page 1. of 3 Contract Quantity AdjustmentJChange Order a am" slam V �. M40 no 01116 Project Names, PRV #2, #4, #9 & BCRUA and Line Extension Quan, Adie/Change Order No.: I Change Order Data COt1t1'aCt TIm e Pq M Adiumul-lent * Item Description -------------- ---- --------- UnitItem---------- ------------------- Unit Price Amount (Working Days) % 1% .................. ... ... ........ % -------- -------------- --------- - ---- ---- ------------::J MpOne at PRV #2 6 %Juto Va ve =GOP I Im�tanatlai LS $2,77p.00 $2,770.00 0 COP #2 OI Pipeline Installation at PRV ji2 LS 1- - ------- $l,256.00 $1,256.00 I--------- -- 0 mom Change due to shift PRV #2 from OCV to COP #3 Cla-Val, Including BFV w/ Actuator LS $7,859.00 0 0$000 16' MI Gate Valve Installation at BCRUA - ------------- ------- -- --------- ---- -------------------------- ---- -- - ---- - --------- COP #4 Site -------- -- - --- -- --------- LS 1------------- $18,571.00 $18,571.00 30 Furnishing 30' MJ Gate Val veat BCRUACOP #5 Site LS 1 ------- $14,626.4Q $14,62b.00 0 Furnishing VRestrained 30'--- COP #6 Pipe — -- ---------------- LS 1 $0.00 $0.00 0 COP #7 4" DI Pipeline Relocation ---- ---the LS - - -------------------------- $2,430.00 $2,430.00 0 Repair Existing Spool Settoin in ----- COP #8 Concrete Wall ----------- LS 1---------- ------- ------ -- $2,701.00 $2,701.00 U New Layout for PRVs to e installed it --- ----------------- -------------- COP #9 BCRUA Site - ---- -1 $3,760.OQ -- ---------$3,7b0.U0 0 Build Deadman (Additive) & Connection ---COP #10 of Pipelines at PRV *9 (Deductive) LS $3,fi42.00 $3,64200 4 Installation of16"---x12" Mi Reducer at P_ #11 COLS PRV #9- ----- -------- - ----- --------- --- -- $917.00 $917*00 0 COP #12 North 81 Standpipe Works LS$0000 ------------- 0.00 0 ------ Build Deadmen at the New 18" Gate Valve installed at PRV #9 and the Existing 16" Butterfly Valve at the North COP # of the proposed PRV Concrete Vault LS $8,026.00 $81026-o00 5 COP#14 18" MI Gate Valve Installation Credit LS 1 -$12,3l0.00 — ----- ------------ - -$12,31D.00 -- 0 V Additional Fittings or nsta anon o 18 --------------- MJ Gate Valve due to the existing COP #15 pipeline is 20". ------ -------------------- - ------ -- LS77--_ - -------- $7,844.00 �7�$99v00 S Connection of Pipeline at the North and ---------- --- - ---- - -------- - -- COP #ib the South sides of PRV #9 -------- $11,059A0 $11,054A0 5 Additional Conduits and Wiring at CRUA _LS Mftl COP #17 Site ----------------LS--- - ---i $1,658.00 $1,658.00 0 --------------- ------ — ----- - ---------------- -- ------------ ---------- $0.00 - ------------- - -- -------------- ----------------- $0.00 - ------------------ %q No -up I I �__ I -M ---- - ----- ----------- ------- ------------- ---------------------- .................... .. ........... .. .. ---------------- --------- ... .............. ldh W. $0.00 . -Xv.. ------ . ........... . . ........... .......... $6 .......... - %* ...... . 49 Page 3 of 3 Contract Quantity Adjustment/Change Order 01/16 Project Name,: PRV #2, #4, #9 & BCRUA and Line Extension Quan. Adj./Change Order No.: 1 uantity Adjustment Data Contract Ti"me Bld Itemaftription ....... . .. .................. CWW= 8 U-n-Ift Qtyl -------- Unit Price Amount Mae- Adjumutlent .............. . .. .. ................ ��34 ...... .... . . .. ....... Extra Hand Excavation ..... ... -Nldwd� CY so ------- 40$110000 .......... .. .... ..... .............. . "$5,500000 ................ . ........................ 0 ---- 35 .........,Extra Machine Ex vation ce ------ aw$65000 wa$3,1250-soo 0 ��36 Extra Placement of Backfill Material ------ --- -CY so 30 Remove and Dispose Sidewalk SY 56*55 --------------- $42000 $2137S910 2 ��31 4" Sidewalk Y 64 - ------------ $6100 --------------- - -- $31968900 3 - - ------ $0,000 - - ----- MM ------- ------ $0200 ---- --------- --------------- - $09 no -$0*001 - -- -------- - --- -------- $0000 - -- ------------ ------- - ------ ------ -- - -- ------- $0000 --------- - ------ $0000 ------------- ---------------- ----- -- $0*00 -------- - - - -------------- ------ --------- - - $0600 ------ $0600 50 ----------- - --------- -------------- -------------- ----------- ----------- --- - ------------- -- ---------- ---------------- - $0400 ----------- -- - ----------- --- ------------------ - $0000 ---------- - --------- $0200 - - ---------------- ---- -- ----------- $0900 ---------- -- --- - ------------ $0 no -------------- $0000 ------- -- -------------- Min ---------------------------------- ------------- ---------- ---------- $0000 ---- ----- ------- ------------------------- ------- - ----- ----- ------------ -MUM-Ne- -------- ----- ---------------- ---- ---------------- 00 $04 - --------------------------- ----- - ----- --- ... ............. -------------- ------ ------- ------- .. ........ - ------- - ----- $0200 vti -- .... .......... Lti ------------ ---- ---- --------------------- M$50656990 .. .... X* ----------..........