CM-2020-264 - 9/2/2020Page 1 of 2 rev, 01/16 Department: Project Name: City Project ID Number Vendor Justification Contract Quantity Adjustment/Change Order Utilities & Environmental Services Plant Control System Replacement Project - Phase A Date: 9.24.20 Change Order/Quantity EPIMP Adjustment No. Prime Controls, L.C. 1725 Lakepointe Dr. Lewisville, TX 75057 972-221-4849 Company Name Address Phone No. This project Is a portion of the Brushy Creek Regional Wastewater System (BCRW WS) 10 MIillon Gallon per Day (MGD) East Wastewater Treatment Plant (W WrP) Expansion project The plant controls for the existing facilities at the plant before the expansion work takes place are getting replaced under this contract. Nearly all of the existing plant controls were reaching their design ttfe, so the timing for replacing them was good and Is being done Just ahead of the actual plant expansion work. This work Is titled Phase A of the Plant Control System Replacement project and this work was awarded and Is currently being performed by Prime Controls, LC. Phase B of this work will be performed by Prime Controls, L.C. as a subcontractor under Thalle Construction Company as a part of the overall 10 MGD East W WTP Expansion project This Is change order number 2 In the amount of $33,079.24 to make electrical conduit and wiring changes along with an additional controler and mouting bracket for 5 solenoids ind pressure switches not shown on the original plans. These switches will turn off the motors should the pressure of the seal water to the Return Activated Sludge (RAS) and Waste Activated Sludge (WAS pumps drop too low. SUMMARY Amount % Change Original Contract Price: $1,310,420.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $1,310,420.00 Previous Change Order(s): $15,739.61 1% This Change Order: $33,079.24 3% Total Change Order(s) To Date: $48,818.85 4% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $1,359,238.85 Difference between Original and Adjusted Contract Prices: $48,818.85 Original Contract Time: 210 Time Adjustment by previous Quan. Adj./Change Order: 0 Time Adjustment by this Quan. Adj./Change Order: 14 New Contract Time: 224 — Submitted for Approval Prepared By: David Freireich, PE Chief Utility Engineer, City of Round Rock 9.24.20 Signature Printed Name, Title, Company Date Approvals Contractor: ~�— Alfonso Garza, Project Manager, Prime Controls, L.C. 9.24.20 r Printed Name, Title, Company Date City Project Mang David Freireich, PE Chief Utility Engineer, City of Round Rock 9.24.20 Siature ��,, Printed Name, Title Date Citv Manager f lf�_L�1i1/. 1j"llyiolkldh/. L-4.r 2-6 Page 2 of 2 Project Name: Plant Control System Replacement Project - Phase A Quan. Adj./Change Order No.: Chanae Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da 1 add solenoid/shut off switches and control panel for WAS/RAS 1 1 $33,079.24 $33,079.24 14 $0.00 - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTA ��3,079.24114 Page 1 of 1 Project Name: Plant Control System Replacement Project - Phase A Quan. Adj./Change Order No. Quantity Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS:0.00 0 PRIME �WONMOLS 1725 LAKEPOINTE DRIVE '1 LEWISVILLE, TX 75057 PHONE 972-2214849 fl FAX 972-4204842 Change Order Request Date: September 14, 2020 To: City of Round Rock Texas 3400 Sunrise Road Round Rock, Texas 78665 Attn: David Freireich Project Name: BCRWWTP East Plant Control System Upgrade Subject: RAS/WAS Pump station 1 power conduit and controls retrofit Change Order Request No.: 2060018-003 Source: Engineering David, Prime Controls is pleased to offer the following proposal to provide additional services at BCR WWTP as described hereinafter. Scope of Work 1. New control station (H-O-A) for each pump control total of 5 2. New conduit installation for solenoid valve and pressure switch seal water 5 installs 3. New conduit for motor power with transition to flex conduit 5 installs 4. Stainles steel unistrust back to back support for cable 5 installs 5. Installation labor Sub -Total Cost Breakdown Materials Labor Subcontractor Crew $ 12,987.35 $ 6,983.88 $ 13,068.00 Total $33,039.24 Clarifications 1. Prior to commencement of work, Prime Controls requests an executed copy of this change order request. We expect this change will be accepted in a timely manner. Prime Controls is not liable for schedule delays associated with this change in the scope of work. 2. Our Proposal is valid for 15 days from the date of this letter. Pricing is subject to change based on approval date. Schedule Number of additional calendar days requested for this change proposal from the date of notice to proceed. 14 Proposal Approval Approved By: Date: Should you have a questions regarding this change order request please feel free to contact us. Sincerely y,./`�— Prime Co r ,iP Alfo rg larxa, Ch.E, PMP Prdrect Manager PRIME � COI OLS 7&Y71 Jor Ifurhrc lbirr Pflu;errifle. TX -86 0 Tall Free 84ri--9Y-.SL'AD I Cclfr (512) 5>(1-5892 PRIME �CoATBoLS 1725 Lakepointe Drive, Lewisville TX 75057 (972) 221-4849 Phone (972)420-4842 Fax Chanae Reauest Proposal Itemized Breakdown Date Submitted: .................................................................. ....... 9114/2020 Project Name:............................................................................... BCRW WTP East Plant Control System Upgrade Contract or Subcontract Number......................................................... PC Change Request Proposal Number...................................................2060018-003 Source of Change Engineering Material Unit Price Ext Prlce Stainless steel unistrut 1-5/8 x 1-5/8 200 1 $ 25.60 $ 5,120.50 Stainless steel unistrut base plate 5 $ 182.21 $ 911.05 2 " aluminum conduit 150 $ 12.17 $ 1,825.43 1" aluminum conduit 150 $ 6.02 $ 903.74 1" LB aluminum conduit fitting 10 $ 16.03 $ 160.27 2" LB aluminum conduit fitting 5 $ 41.76 $ 208.81 H-O-A control station 304 SS 5 $ 170.24 $ 851.20 2" Flex Conduit 35 $ 24.11 $ 843.95 2" Flex Conduit connector for motor 10 $ 39.63 $ 396.34 2" Conduit clamp support 304SS 20 $ 16.43 $ 328.51 1" Conduit clamp support 304SS 20 $ 7.85 $ 156.94 1" Flex Conduit connector 20 $ 10.11 $ 202.16 1" Conduit Tee branch to solenoid and pressure switch 5 $ 27.27 $ 136.33 1" Flex Conduit 30 $ 22.92 $ 687.48 Freight $ 254.65 Tax Rate Subtotal Material : $ $ 12,987.35 Labor (Rates include Payroll Taxes & Insurance Costsl CITY IHrs1 Bxt Price Project Manager 8 $ 881.84 Superintendent 20 $ 1,771.56 Electrical JIW 40 $ 2,519.55 Electrical Helper 40 $ 1,810.93 Subtotal Labor $ 6,983.88 Subcontractor Charges ga nit Pri xt Pri Electrical Subcontractor Crew 40 $ 297.00 $ 11,880.00 Subtotal Subcontractor: $ 11,880.00 PRIME �WONMOLS 1725 LAKEPOINTE DRIVE -1 LEWISVILLE, TX 75057 PHONE 972-221AS49 n FAX 972-420A842 Change Order Request Date: September 14, 2020 To: City of Round Rock Texas 3400 Sunrise Road Round Rock, Texas 78665 Attn: David Freireich Project Name: BCRW WTP East Plant Control System Upgrade Subject: RAS/WAS Pump station 1 power conduit and controls retrofit Change Order Request No.: 2060018-003 Source: Engineering David, Prime Controls is pleased to offer the following proposal to provide additional services at BCR W WTP as described hereinafter. Scope of Work 1. New control station (H-O-A) for each pump control total of 5 2. New conduit installation for solenoid valve and pressure switch seal water 5 installs 3. New conduit for motor power with transition to flex conduit S installs 4. Stainles steel unistrust back to back support for cable 5 installs S. Installation labor Sub -Total Cost Breakdown Materials Labor Subcontractor Crew $ 12,987.35 $ 6,983.88 $ 13,068.00 Total $33,039.24 Clarifications 1. Prior to commencement of work, Prime Controls requests an executed copy of this change order request. We expect this change will be accepted in a timely manner. Prime Controls is not liable for schedule delays associated with this change in the scope of work. 2. Our Proposal is valid for 15 days from the date of this letter. Pricing is subject to change based on approval date. Schedule Number of additional calendar days requested for this change proposal from the date of notice to proceed. 14 Proposal Approval Approved By: Date: Should you have a questions regarding this change order request please feel free to contact us. Sincerely, <PMP Prime Co r tP I rza, Ch.E, Project Manager PRIME ..=COMOLS 768 1 Jnr Harhee brim Pf1u;;arriile. TX '.S660 7 ofi lb ee 86449.SG{D 4 C'elh (512) 556-5891 PRIME ZZ�lll!111211=111CoNTRoLS 1725 Lakepointe Drive, Lewisville TX 75057 (972)221-4849 Phone (972)420.4842 Fax Change ReguestPr000sal Itemized Breakdown Date Submitted: ................................................................................. 9/1412020 Project Name: ............. BCRWWTP East Plant Control System Upgrade Contract or Subcontract Number......................................................... PC Change Request Proposal Number: .................................................. 2060018-003 Source of Change Engineering Material 9TY 910 Pri Ed Price Stainless steel unistrut 1-5/8 x 1-5/8 200 1 $ 25.60 $ 5,120.50 Stainless steel unistrut base plate 5 $ 182.21 $ 911.05 2 " aluminum conduit 150 $ 12.17 $ 1,825.43 1" aluminum conduit 150 $ 6.02 $ 903.74 1" LB aluminum conduit fitting 10 $ 16.03 $ 160.27 2" LB aluminum conduit fitting 5 $ 41.76 $ 208.81 H-O-A control station 304 SS 5 $ 170.24 $ 851.20 2" Flex Conduit 35 $ 24.11 $ 843.95 2" Flex Conduit connector for motor 10 $ 39.63 $ 396.34 2" Conduit clamp support 304SS 20 $ 16.43 $ 328.51 1" Conduit clamp support 304SS 20 $ 7.85 $ 156.94 1" Flex Conduit connector 20 $ 10.11 $ 202.16 1" Conduit Tee branch to solenoid and pressure switch 5 $ 27.27 $ 136.33 1" Flex Conduit 30 $ 22.92 $ 687.48 Freight $ 254.65 Tax Rate Subtotal Materlal : $ $ 12,987.35 Labor (Rates include Payroll Taxes 8 Insurance Costsl TQ Y (Hrsl Ext Price Project Manager 8 1 $ 881.84 Superintendent 20 $ 1,771.56 Electrical JIW 40 $ 2,519.55 Electrical Helper 40 $ 1,810.93 Subtotal Labor $ 6,983.88 CITY Unit Price x Price ?ROUND City of Round Rock ? ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Prime Controls for the BCRWWS - East Plant Control System Replacement Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/2/2020 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $33,079.24 Indexes: Regional Wastewater Projects Attachments: Proposal, QA No. 2 Department: Utilities and Environmental Services Text of Legislative File CM-2020-264 The Plant Control System Replacement project is a portion of the overall Brushy Creek Regional Wastewater System (BCRWWS) 10 million gallons per day (MGD) East Wastewater Treatment Plant (WWTP) Expansion project. Nearly all of the current plant controls are reaching their design life. Before the expansion project began, Phase A of the Plant Control System Replacement project was awarded and is currently being performed by Prime Controls, L.C. Phase B of this work will be performed by Prime Controls, L.C., as a subcontractor under Thalle Construction Company, as a part of the overall 10 MGD East WWTP Expansion project. The Department is requesting a change order for the labor and materials for a new control station. This includes mounting equipment, electrical conduit, and wiring to accommodate five solenoid valves and pressure switches not shown in the original plans. This Change Order No. 2 for $33,039.24 will bring the total contract to $1,359,198.85. Round Rock's participation in the cost is 12%, $3,964.71 for this change order, which brings Round Rock total to $163,103.86 of the overall contract. The partner Cities of Austin (24.7%), Cedar Park (21.0%), and Leander (42.3%) will be responsible for the remainder. Cost: $33,039.24 Source of Funds: Regional Wastewater Projects City of Round Rock Page 1 of 2