R-2020-0275 - 10/8/2020RESOLUTION NO. R-2020-0275
WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with
Partners Remodeling, Restoration and Waterproofing for the Clay Madsen Recreation Center
Restroom Project, and
WHEREAS, the Council has determined that it is necessary to make adjustments/changes to
the quantity of work to be performed or materials, equipment, or supplies to be provided, and
WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said
Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity
Adjustment/Change Order No. 1 to the Contract with Partners Remodeling, Restoration and
Waterproofing for the Clay Madsen Recreation Center Restroom Project, a copy of said quantity
adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 8th day of October, 2020.
CRAIGORGNlayor
City of Round k, Texas
ATTEST:
RJUN
SARA L. WHITE, City Clerk
0112.20202; 00455944
EXHIBIT
"A"
Contract Quantity Adjustment/Change Order
RWI410 ROM
0 1 6
Department: 23000
------------ - ------ -- - --- ---
SM&
Project
Pacrc I of 3
0
Flame:
--- ------ ---------- Clay Madsen Recreation Center Restroom Project Date: 9/1Q/20
- - ------ -- --- --- W_
Electrical service provided during the construction of the new fields was designed to accommodate the future power needs of a prefab
restroom., However, PARD ended UD purchasing a differentprefab restroom tNan th a designedaV010 for, h W require a transformer to
support., Irrigation for this area was originally included 'in the scope of another project, but had to be removed becauseth &WAfttrn il n Vaqt tc S I W h d -WW t tto meetbeen Installed. Minor changes in the field necessitated the addition of cast iron boots over clean outs and adai i al sidewalk ADA
requirements. Contractor 'issued credit for not having to trench as much as anticipated_for
electrical conduit
SUMMARY - --------- _' Amount
Original Contract Price,*
Previous Quantity Adjustrnent(s};
This Quantity Adjustment.*
Total Quantity Adjuskment{s):
Total Contract Price with Quantity Adjustment{s):
Previous Change Order(s):
This Change Order*.
Total Change Order(s) To Date.,
Adjusted Contract Price [Original Contract Price Plus
Quantity Adju ent(s) Plus Change Order(s)]:
Difference betweenoriginal and Adjusted Contract Prices:
Original ContractTime,0
Time Adjustment by previous Quan. Adj.%Change Order:
Time Adjustrnent by this Quan. Adj./Change Order.
New Contract Time,6
so
Prepared By.
Signature
Contractor:
City Project
Manager:
Specialist,
CORK
RachelMorris. Park Development
4400006HOM-------------
Printed Name,
Title, Company
Frintea Name., title, Company
rl If IL CU INC11 I IC, I lue
O/o Change
$0.00 0%
$9,475.00
$9,475.00
------ $51,991.75
$9,475.00
45 days.,.__ 8800@@800006080�
none
45 days
Date
Date
Mayor/City
Manager
-- - ------- -
Signature Printed Name, Title -------------- W Date
22°!0
22%
Page 2 of 3
Contract Quantity Adjustment/Change Order
rev,. 01.16
Project Name,: Clay Madsen Recreation Center Restroom Project
Quan, Adi,,/Change Order No.: 1
Change Order Data
Contract
Time
Item # ----------
-
........... ..... ....
. ............ .......... . ........
. ...........
.............
DescriptianI
------------ Item
.......... . ......
X.: .............
X.X ......... .
.. .......
...... ... ..... ....
........
Unit
..
Qty.
..........
Unit PriceAe»ount
xoe
X.........
......... . X.-
. . ........ ..............
Adjustmen#
Da s
........ ......
I
Purchase &install new transformer
LS
$4,200*00$4,200.00
- ---- -------- ------
0
2--
install irrigation around new res-t-room
— ---------- 1--
$4,200.Q0
$4,200.00
0
Install 4 additional cast iron boot over
------
---------
3
cleanouts
LS
1
$1,000.00
— ------------- $1,000.00
0
--------- ------- 4
Install additional sidewalk to meet AQA ----------
Ls-
1-
$825.OD
$825.OQ
fl
Credit for not trenching entire electrical
-------- --
5
I --------
- ---------
----------------------------------------
----------
--------------
-----------
conduit
- - -
-----------
----------
----------
Lb
--------------- --------------
--------- -
---
------ --
- -----
- - ------- ----
------------ ---
- ------
-- ---------
#*$750.00
-------- ------
---- - ---------
------------
- -------------
- --------------------- -------------
---------------------------- ------
- ------------------------------
-$750*0U4^
-------------------- - ------ -----
- - ------------
--- - ----- -
---
---------- ---0
------- - ------------------------------
--------------- -------
--------
--------------------------------------------------
-------------
-----------------------------
---------------------
---- --- ------ - - ------ -
----------
- ------------
- - -------- --------
--------
- ------------------------ ------
------------
------------- ----
---------
-----------
----
--------------------------- --------
------- - --- - -------------
-
--------------- -------------- - -
- ------
----------------
------------
- ---------------- ----------------
- ---------- ---------- -----------
---------------
-------------
MANION-
-----------
X-
mama
a
TOTAUR
--- ------------------
-------------
.. ..... . ..
........ ..
Am --------- -
1p 4iU
----M no
-----------------
----------------
--------------- - --- - ---------------- - ----
........... X- X
x
U
--------------
A Aim
Mx t -f
F&I 0146
-f
Contract Quantity Adjustment/Change Order
Project Name: Clay Madsen Recreation Center Restraym Project
Quan. Adj./Change Order No,,*, I
Page 3 of 3