R-2020-0275 - 10/8/2020RESOLUTION NO. R-2020-0275 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Partners Remodeling, Restoration and Waterproofing for the Clay Madsen Recreation Center Restroom Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Partners Remodeling, Restoration and Waterproofing for the Clay Madsen Recreation Center Restroom Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of October, 2020. CRAIGORGNlayor City of Round k, Texas ATTEST: RJUN SARA L. WHITE, City Clerk 0112.20202; 00455944 EXHIBIT "A" Contract Quantity Adjustment/Change Order RWI410 ROM 0 1 6 Department: 23000 ------------ - ------ -- - --- --- SM& Project Pacrc I of 3 0 Flame: --- ------ ---------- Clay Madsen Recreation Center Restroom Project Date: 9/1Q/20 - - ------ -- --- --- W_ Electrical service provided during the construction of the new fields was designed to accommodate the future power needs of a prefab restroom., However, PARD ended UD purchasing a differentprefab restroom tNan th a designedaV010 for, h W require a transformer to support., Irrigation for this area was originally included 'in the scope of another project, but had to be removed becauseth &WAfttrn il n Vaqt tc S I W h d -WW t tto meetbeen Installed. Minor changes in the field necessitated the addition of cast iron boots over clean outs and adai i al sidewalk ADA requirements. Contractor 'issued credit for not having to trench as much as anticipated_for electrical conduit SUMMARY - --------- _' Amount Original Contract Price,* Previous Quantity Adjustrnent(s}; This Quantity Adjustment.* Total Quantity Adjuskment{s): Total Contract Price with Quantity Adjustment{s): Previous Change Order(s): This Change Order*. Total Change Order(s) To Date., Adjusted Contract Price [Original Contract Price Plus Quantity Adju ent(s) Plus Change Order(s)]: Difference betweenoriginal and Adjusted Contract Prices: Original ContractTime,0 Time Adjustment by previous Quan. Adj.%Change Order: Time Adjustrnent by this Quan. Adj./Change Order. New Contract Time,6 so Prepared By. Signature Contractor: City Project Manager: Specialist, CORK RachelMorris. Park Development 4400006HOM------------- Printed Name, Title, Company Frintea Name., title, Company rl If IL CU INC11 I IC, I lue O/o Change $0.00 0% $9,475.00 $9,475.00 ------ $51,991.75 $9,475.00 45 days.,.__ 8800@@800006080� none 45 days Date Date Mayor/City Manager -- - ------- - Signature Printed Name, Title -------------- W Date 22°!0 22% Page 2 of 3 Contract Quantity Adjustment/Change Order rev,. 01.16 Project Name,: Clay Madsen Recreation Center Restroom Project Quan, Adi,,/Change Order No.: 1 Change Order Data Contract Time Item # ---------- - ........... ..... .... . ............ .......... . ........ . ........... ............. DescriptianI ------------ Item .......... . ...... X.: ............. X.X ......... . .. ....... ...... ... ..... .... ........ Unit .. Qty. .......... Unit PriceAe»ount xoe X......... ......... . X.- . . ........ .............. Adjustmen# Da s ........ ...... I Purchase &install new transformer LS $4,200*00$4,200.00 - ---- -------- ------ 0 2-- install irrigation around new res-t-room — ---------- 1-- $4,200.Q0 $4,200.00 0 Install 4 additional cast iron boot over ------ --------- 3 cleanouts LS 1 $1,000.00 — ------------- $1,000.00 0 --------- ------- 4 Install additional sidewalk to meet AQA ---------- Ls- 1- $825.OD $825.OQ fl Credit for not trenching entire electrical -------- -- 5 I -------- - --------- ---------------------------------------- ---------- -------------- ----------- conduit - - - ----------- ---------- ---------- Lb --------------- -------------- --------- - --- ------ -- - ----- - - ------- ---- ------------ --- - ------ -- --------- #*$750.00 -------- ------ ---- - --------- ------------ - ------------- - --------------------- ------------- ---------------------------- ------ - ------------------------------ -$750*0U4^ -------------------- - ------ ----- - - ------------ --- - ----- - --- ---------- ---0 ------- - ------------------------------ --------------- ------- -------- -------------------------------------------------- ------------- ----------------------------- --------------------- ---- --- ------ - - ------ - ---------- - ------------ - - -------- -------- -------- - ------------------------ ------ ------------ ------------- ---- --------- ----------- ---- --------------------------- -------- ------- - --- - ------------- - --------------- -------------- - - - ------ ---------------- ------------ - ---------------- ---------------- - ---------- ---------- ----------- --------------- ------------- MANION- ----------- X- mama a TOTAUR --- ------------------ ------------- .. ..... . .. ........ .. Am --------- - 1p 4iU ----M no ----------------- ---------------- --------------- - --- - ---------------- - ---- ........... X- X x U -------------- A Aim Mx t -f F&I 0146 -f Contract Quantity Adjustment/Change Order Project Name: Clay Madsen Recreation Center Restraym Project Quan. Adj./Change Order No,,*, I Page 3 of 3