R-2020-0321 - 11/12/2020
RESOLUTION NO. R-2020-0321 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Rodriguez Transportation Group, Inc. for the Gattis School Road (Segment 3) Project, and WHEREAS, Rodriguez Transportation Group, Inc. has submitted Supplemental Contract No. 3 to the Contract to modify the provisions for the scope of services and to increase the compensation, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 3 with Rodriguez Transportation Group, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 3 to the Contract with Rodriguez Transportation Group, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of November, 2020. CRAI MO AN, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.20202; 00458803 EXHIBIT "A" STATE OFT XAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO, 3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: RODRIGUEZ TRANSPORTATION GROUP., INC. ("Engineer") ADDRESS: 11211 Tavior Drawer Lane., Suite 1001, Austin, TX 78759 PROJECT: Gatti*s School Road (Segment 3) This Supplemental Contract No. 3 to Contract for Engineering Services i*s made by and between the City of Round Rock, Texas, hereinafter called the "City" and Rodriguez Transportation Group, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 22nd day of March, 2018 for the Gatti*s School Road (Segment 3) Proj'oecti'on the amount of $1,013,037.45,o9 and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on February 14, 2019 to amend the scope of services and to increase the compensation by $117 447.94 to a total of $19130,485.39; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on August 22, 2019 to amend the scope of services and to increase the compensation by $89 780.42 to a total of $1,220,265.81; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $52,865.48 to a total of $1273 131.295141 NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract i 0 s amended as follows: I. Article 21, Engineering Services and Exhibit B. EnizineerinServices shall be amended as set forthi`n the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. II. Article 4., Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $52,865.48 the lump sum amount payable under the Contract for a total of $1,273,131.29, as shown by the attached Addendum to Exhibit D. Supplemental Contract 0 199.1770; 45 7520 Rev.06/16 84275 1 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract I*n duplicate. [signature pages follow] Supplemental Contract 0199.1770; 457520 Rev.06/16 84275 RODRIGUEZ TRANSPORTATION GROUP, INC. By0 : 10/20/2020 Date Supplemental Contract 0 199.1770; 457520 Rev.06/16 84275 3 CITY OF ROUND ROCK By0 : Craig Morgan, Mayor Date Supplemental Contract 0199.1770; 457520 APPROVED AS TO FORM: Stephan L. Sheets, City Attorney Rev.06/16 84275 4 ADDENDUM TO EXHIBIT B Engineering Services The additional Scope of Work to be performed by the Engineer under this Supplemental Contract is described as follows: � Prepare and update ROW Schematic to help track ROW acquisition process. • Address questions related to parcels where ROW I*s to be acquired and make minor adjustments to the proposed ROW as requested by the City. � Develop exhl*bl*ts and participate in special commissioner hearings for potential condemnation cases. 1 • Additional Roadway Design Services for to update design resulting from revisions to the proposed ROW limits. FC 130 — Right -of -Way Data/Utilities A. Right of Way 1. The Engineer shall prepare a ROW Schematic Exhibit and update as needed. Purpose of the exhibit I*s to illustrate the proposed ROW limits for the project. 2. The Engineer shall prepare exhibits in response to request for information during the ROW acquisition process. Minor adjustments to the proposed ROW limits may be needed to assist with the ROW acquisition process. This effort will be required for up to 15 parcels (i.e.: 4, 6, 7, 8, 9, 10, 12, 21, 23, 24, 27, 28 31). 3. The Engineer shall prepare exhibits and participate in special commissioner hearings for potential condemnation cases. This effort will be required for up to 7 parcels (i.e. 49 69 79 109 219 25 and 28) FC 140 — Project Management and Administration A. The Engineer shall continue to manage the project by preparing invoices, maintaining the project files and work schedule, and continuing to coordinate with City Staff and their representatives for the extended duration of the project (ex. 12 additional months). FC 160 — Roadway Design A. Roadway Plans 1. The Engineer shall update the design and various plan sheets as needed to reflect the above-mentioned revisions to the proposed ROW limits. FC 163 - Miscellaneous A. Utility Coordination 1. The Engineer shall continue to coordinate required relocations with each utility company and continue to attend utility coordination meetings (12 additional meetings) as requested to facilitate utility conflict identification and resolution. Addendum to Exhibit C - Work Schedule ID Task Task Name ;Duration c tart 'Finish c Aug pep 8 8• Dec 23 '18: Jan 27, 1 Mar 3 19 7 19 :May 12 '19: Jun 16� 19 : Jul 21 19 25 19 29 19 Nov 3 19 Dec 8 1 Jan 12, 20 Feb 1 20 Mar 22, „'18:Mar18,'18:Apr22,'18:May27, 18: 1u!1, 18 S,'18' 9,'18:Oct14,'1 :Nov1B�'1 ' p: ,' Apr ,• y ,' :Aug ,• ,• ,' ,' �,' r 26 20 31 20: 1ul 20: Oct 1 Za :Nov '20: Dec 2 20: Jan 1, 21 Mar 7, 21 11 21 '2,p:Ap ,' ;May 5, 20 •Aug9, 20:Sep1 8, 22 7, iApr :May16, 21iJun 20, 2 .................. 1 :Mode ....................................................................... � ... .............................................•......._.. Initial Submittal (Geometric Schematic) i� days ............................... .. .. .... ... ............i..3 .Sun 4/1/18 Fri 8/17/18 :. 1 1 4 1 1 1 1 4 7 .1�....2.....11.....2. ..1. 1. 1 .�. � ..2�...1,i...,21.. Z.s'.2t ..11. ...... .2..... .9. .24. 4. ..... •,• .l .z6 l 6 1R..2�. 9..,2. .5.. ,Z3. � .Zi....1.2....6...2�...I.....?�2....�. Initid Submittal (6eAneetric 6d nitk) ;.... _; .�t.:.k. .21.:..k..�. .5....,�4....4...19. 3....t,S. .�.. .8. .Z....l......Z. .1.. ... .1�..11 .lk....2.....11.. ... �4. .�....6...3.. ..�...�9... - Y "• '" "•. 2 Notice to Proceed 1 day Sun 4/1/18 Sun 4/1/18 ............. ....... . � -, .... .............. ..... ... ... ; ...................... ...... ... • ......... W.C. Data Collection Field & e Reconnaissance 15 days ;.. .... .. :Mon 4/2/18 Fri 4/20/18 ....... ..... .. .. ... .. ... ... .... ... ... ... ... ............. .. ... ... ... ...% ........... ....... .. ... ... ... ... ... ... ......... ... ._. ... ... ... ... .. .......... ... ... ... ... ... ................ ... .. .. .. ... .. .. .. ... ... ... ... .. ......... ..... .. ... ... ... .. _ _ Data- ct pa 8t Find Recoma�nce � . ......... 4 sso' •Y• Right of Ent Coordination 8 Entry 15 days :.... Mon 4/9/18 Fri 4/27/18 • .... .:. .. .. ..... .. ........................ . .. .. .• ... •.. .. ... .. ... .. .. ... ... ... .. ..... .... ... .. .. .... .. .. ... iit of Entry tion i9. �Y � .♦ ............ ... ... ... .... .... .. ... ... .1 ... .. ... .. .. .. ..... .. ... ... ... ... .... ..... .. ... ... _... ... ... ... ... ..... . ........ 5 $8 Desi n Conce t Conference w DSF g P l / ) 3 da days .... Thu 4 26 18 Mon 4 30 18 / / / / .... ..... .. ....... . • y ................................ ... ... ... ... ...................... ... ... ... ... ... ......... ... ... ... ... ... ................ ... ... ... ..... ......................... n Coe'ce �t Con Conference wr : i ••P� p feren (/ �) ... ... .._ ... ... ..... .. _...._... ... ... .. ... ... ............... ... ... ... .. ................ ... ... ... ... ... ... ...... 6Controln .o- Initiate Pro' Project 5 days Mon 4/23/18 Fri 4/27/18 ............. ................. ... ... ... ... .......... ... ... ... .... ............... ... ... ... ... ..................... ti.. f. ;.. {.. date: nRrol Co ... ... ... ... ............... ... ... ... .................... ... ................. • . 7'<• H & H Studies 27 days Thu 5/3/18 Fri 6/8/18 H &H Studies 8 Environment Data Collection ....................................................................:.... 15 days ,Tue 5/1/18 Mon 5/21/18 ... ...... ..................................................... b+on en! Co I�ctw�i -Ein► nt Da" 9� Geotechnical Investigation 45 days Tue 5/1/18 Mon 7/2/18 ' technkallnvest tion 10 > Survey Surve (Design Surveys) 25 days Y ;. Mon 4 30 18 Fri 6 8 / / /1/1 ...... ......... .............. ... ... ... ... ... ............... ... ;. . %.. ;.. .. y�+el► (�i9. � ) .. ... ... ........ ;... ...r .. .. _ .. ... ... ...... ........... 11 .... t 2 e •.� �• Preliminary e imina Roadway Geometry/Design /Desi n Cross Sections rY Y r1l g PreliminaryStorm Drain 0 ai Design g 15 days Y 20 days Y :. -Mon 6 4 18 Fri 6 22 18 / / / / :. .. 'Mon 6/11/18 Fri 7/6/18 . _......... • :.�. ..... ... ..... ... ... ... ._. adw Geo n Cross Sections � � n�try/Des� ......... .. ..... ..... ..... ... ... ... ................ •nelitn toxin :- Dira Deb' �► .�� ... ... ... ... ................ ........ .. ... ... ................. ... ............... ............ ... .......... ....... ....... 13 soa .o- Preliminar Utili Conflict Determination y ty 5 da s Y .... Mon 7/9/18 Fri 7/13/18 ..... .. :. ........ .. . .. Prelnriina u t8 coiiti: at � �► i'h►. � Deterniin �n . .............. .............. ... - ........ 14 DevelopSequence of Construction Layout q y 10 days ... Mon 6/25/18 Fri 7/6/18 : r {.. ............... ... ... ... ... ... .... uence Cansteuctioti � o � �a � �P � Y ... ... ... ... ... ............... %f ' .................................................. . 15 8M' •,- Prelimina Geometric Schematic rY 10 da s Y .:... .Mon 7 9 18 Fri / / 7/20/18 ... ................ ..... ... .. ............................. �nf inaetric SCheatetk ri► �� . 16 .............. �• Initital Submittal C (QAQ) 5 days Mon 7/23/18 Fri 7/27/18 '- � ' nitital Subonlool (� 1 - ; 17 •�. I i nit al u S bmittal 0 da s Fri 8 3 18 Fri 8 3 18 .... . ,. .. .. ... ...... ......... ... ........ ................. .. ...... ........ ............ ...... ...... ............... ... .... :: :. "Knit I S '!i itta . a� ... ..... ............... ....................... .. ................ ... ... ......... 18 City of Round Rock Review Period 10 days Mon 8/6/18 Fri 8/17/18 .0 of Rciu ' City n� Roidc t�rimr Perad 1. .... 19 �• 30% Submittal (Geometric Schema ROW limits (/ ) 71 days Y .... Mon 8 20 18 Mon i / / 1/26/18: ................. :. ............... ........ ... ... ................ • 309b Subni C eo t ric S�ema •-.......... L• iin rttol ( � k/RQ its) :. :.... ........... ... ... ............... ... ... ... ... ... ... ...... ..... 20 ; Property Owners Meeting #1 P rtY g 5 days Y Mon 9 3 18 Fri 9 7 18 / / / /Y ... :. . ............. ... ... ... ........ ,,..p ro • •O�wnets Nieet � 01- '^9 . 21 7pp .� R i Review/Address ew Address Review Comments 10 days Mon 8 20 18 Fri 3 8 Add Rev �Com � is �/ rose tew ineil ......... 22 ear, •� Environmental Document/Technical hni I R t/Tec ca Reports 20 days Fri 9/14/18 Fri 10/12/18 .. ........ :...._ ... ...........: .. ..... ... ... :. .. 's ; •iiiroamental•Documen •echnical R;e � ports .o- Update Geometric Schematic/Design XS 10 days Mon 9/17/18 Fri 9/28/18 plate Geometric Scheniater�lDeAgn XS ......... ..... 24 .� .............. ........ Update Sequence nce Con e of Construction Layout ........................................... 5 days ... :Fri 10 5 18 Thu 10 it 18 ...... ... ... ... ..._...... ........... .. ... .. .. .. .................. ... ... ........ ... ... ... ... ............... ............ ,• ,•-�- f uence o -iofi Ira P �l G��n+c# Y� . ... ... ............... ... ... ... ....................... ... .. ................. ... 25`. Update Storm Drain Design p g 10 days y ri F 9/28/18 Thu 10/11/18 :�Pdeto Storm Drain Des' .......................................................................................................................................................................... 26 88�' Update Drainage a Report P g Po 5 days Y ........................................ Fri 10 12 18 Thu 10 18 18 / / / / ............... ....................................................................... ... ... ... ......... .. ............... .. .. ... ... .............. ti -<..{.. e Drama 9e t< �� Report ... ... ... ... ................ ;.... .. ... ... ................ .. .. ........................................... 27 Update Geotech Report 5 days Mon 9/24/18 Fri 9/28/18 �. ' ... .---------•---- ----� GeotechP ; ; ; 2 8 s .�. Update Utility Conflicts P h/ 5 days Ys ;. ... Fri 10 12 18 Thu 10 18 18 / / / / ... ............... ... ... ... ... ... ................ ... ... ...................... :. .;. •U • ih- i-Cotifi• •P�� RY � .;... . .................. , ........ 29 K _ Pre Final Geometric Schematic 5 days .. Fri 10/12/18 Thu 10/18 18 ... ..................... .. ... .. .. .... .. .. ..-. .. ... ... ... ... .... ... ....... .�..... .... ... ............. .. ........ .... ... .....t ... .. ... ... .. ........ ..._._ -ina1Geometric Sc limas ... ... ... .... .... .... ... .. _ .. .. ... ... .. .. .. ... ... 30 � Public Meetin #1#_,Ptsb1k 8 5 days Tue 10/23/18 Mon 10/29/189 f.... . ............ ... ... .................... ... ... f. i -g Meeting 1• ... ... ... ......... .. .. f. .... .. .. ... .... ... ;. ... ... . ........•.. 31 a 30% Submittal (QAQC) 5 days Tue 10 30 18 Mon it 5 18 ., .. ... .... ...... ... ... ... . ....... ............. ... ... ...-... 0% Submittal (QW . ... ......... �.� . . 32 s ►{, 30% Submittal 0 days Mon 11/12/18 Mon 11/12/18 ' '11/� 31►% Svb�nitta! ............ 33 889' � ...................................................................................... City of Round Rock Review Period ty .... 10 days y ................ :.... Tue 1 13 18 Mon i/ / ii/26/i8 ......................................... .. ... ................... ...... .................... ...................... ... ... ... ........... ............................................................ .P. v w :C of tsonnd� ie esriod- , bi► �odc � .. ... .. ............. ... .......r............................ ... ...... _ 34 � 60% Submittal PS&E 6S days 11s Tue 11 27 18 Mon 25 19 / / 2/ / 6�% Submittal ( ) ........... 35 Owners Meeting #2 If Applicable) Property g ( pp ) 5 days y Tue 12/4/18 Mon 12/10/18 ... ... ....................... ...... ....... ........... ................ -fro qrs Meet" b��• 2 ICa. P�'�I► � (if ) .............................................. .............. ......... . 36 ssp'� Review/Address Review Comments 5 days Y Tue 11 27 18 Mon 12 3 18 / / // iew/Address Review :Comments 37 _ ... Final Re Reports (Env., Drn Geo.) Po 8. 5 days Ys final f" Goo-) Tue 11 27 18 Mon 1 3 18 (•.9. ) / / 2/ / 38 a Utility Coordination Meetings 30 days Tue 12/4/18 Mon 1/14/19 Util Coordination Meetings ............... ... ... . .................... ............... .... 39 sex •<• Final nal Geometric Schematic 5 days Y ...% Tue 12 18 18 Mon 12 24 18 / / / / ... .... ................ ... ............... ••f n'ie� inn! Schematic Geo ric t'• -- - r. ... ... ................ ... ... ................ ... . 40 Begin Detailed i Beg 60%6 eta ed Design (Plan Sheets) 45 days :Tue 12/4/18 Mon 2/4/19 : _ .. ........ .. ... 60% DetaEed n 'n Stiee>bs • egln �i9 (P14 ) 41 Public Meeting #2 (If Applicable) 5 days Tue 12/25/18 Mon 12/31/18 Publ Meetitsg d2 (if Applicable ......... 42' � ............................ ........... .-. -.. .... . .................. 60 %6 Submittal QAQC ( ) 5 days ys ............................ ................ Tue 5 9 M 2/ /1 on 2/il/19 ._. ... ... ......... ... ... ................................... '" 9b bn�itbd -•� �+ {QAQC) '60% ................................ ........ . 43 sa��, 60% Submittal 0 days Mon 2/11/19 Mon 2/11/19 ! Submittal 2/. ......_....... 44 w• ................................................................................................................................................:.... idaysound C of Round Rock Review Period City2/ 10 Tue 12 19 Mon 2 25 19 / / / ............. ............................... .. ... .. --- ._...... .. ... .... ... ........ ... ... ... .. ... ................ .. ... ... .. ... ................ -C of R •P Roc eriod , �► Rev .. ... ... --- ... .............. ... .. ... ... ............... - -- .;..... .;................. ... ... ... ....................... 45 w.� 90% Submittal (PS&E) 221 days Tue 1/1/19 Tue 11/5/19 : 90% Submittal (P$& ' 46 .}. .r A.W G im I es Supplemental Survey and SUE SWA�tl pp y ( ) 30 days ;.... .Tue 1/1/19 Mon 2/11/19 .. ....... •••_.... ... .............. ... ... �. :,. . ... .............•. 1W O�imes- • Su�v atio - • E WAu1 Supplemental ey Sl� (S ) -- --... .. .. .... ...... .. ..... ... ... ... ... . . ; , .... Y!: •• 47 7w� .K. Supplement Work Authorization No. 2 SWA#2 pp � ) 0 days -Mon 7/29/19 Mon 7/29/19 : ................. ... ... :... .. ... ... .. ......... ... •7 t•lAlo � Audi isat n N • �.� 2 W • #2 I�29 •8upalentien Mc oar io o �S A ) - ... .. .............. • �eme .• ... .... ... ... .... .... .... .. .. ...... .... .�.... .. ... ... ...... .......... ... ... ... .... .. .. ....... .... ..... ... .. .... ... .. . � 48 �• Windy Park rk Supplemental m n d a Su e e Survey E WA#2 to S and SUE S 30 days :Mon 7 29 19 Fri 9 6 19 � #t •1Al i�c tttaf:Surlr bndSUE SWA 2 ................. . 49 .� R vi w r e e /Add ess Review Comments 5 days Tue 2/26/19 Mon 3/4/19 .............. .. f........ ,.. ... .. eview A ddress Reviser: Co tnent: ; / m � . 50 sa1a, Continue 90% Detailed Design (Plan Sheets) 50 days Wed 7/31/19 Tue 10/8/19 ----------------------•--=----- -•-----•••-��-••--=-•--•1 �Cantlriue 90% Do6ded Desigo (Plan Sheets) ......._. 51 ...................................................................................................................................... �- Utility Coordination Meetings tY g 75 days Y .. ..... .. :Mon 5 20 19 Fri 8 30 19 / / / / ;: .. .................. ... ... .. ...•..................._... ...._ ....... .. ... -- --. .............. n•M �in' .t. : bietio -s � � set Ib . • � '� ... ... .. ... ................ ... ... .. ... ... ............. ... .. .......................................... 52 ", Su rtin Documents Estimate GN, Construction PPo g ( 15 da s Y :Wed 9 18 19 Tue 10 8 19 / / / / : : potting Documents (Estimate; GIN. Construction module) Schedule) :... ; 53 bbicy 90gb Submittal QC (QA ) 10 days Y Wed 10 9 19 Tue 10 22 19 / / / / ....... ........ ....... .... ... ... ... .............. 0 Subm -9 96 btel (QAQLi ... ... ... . ................ ... ... ......................... ......... .. ............... .. ................ 54 ......- -... s .................................................................................................................................................... 909�o Submittal Odays .... ,. Tue 10/22/19 Tue 10/22/19 . . .. ...... ...................... ... ................. ... ... ... ... ....................... ... ... ........ ... .. - .............. ... ... ................ ;. %#2- �9Q'96 Su itt*!- ... ... ... ... ... ............... ... ... ... ... ........ .. ... .................... ... _.. .. ... ............................. ... ... -R• • • ' •C � -oc • �Reov ' ... ... ... ............... ... ... ... ...................... ... ... ... ............... ... • 55 • Cit of Round Rock Review Period 10 da s Wed 10 23 19 Tue 11 5 19 ......... . of • o nd • k ieaAr n R Per iod ....;..... .. ... ......_......... .. ... ............... .. ........._..... ... .. ... ...... 56Y Pre -Final Submittal (PS&E) 22 days? Man 10/S/20 Tue 11/S/20 :..... . �� Prue -Final: Submittal (PSBiE) ...----- ::.. 57..�; ......... air .� P r -Fi I Pre -Final Subrnitta C (QAQ) 10 days? ys Mon 10 20 Fri /S/ 10/16/20 ..... ... ..................... ... ... ... ......... ................ ... ... ........ ...................... ... ... ... ........ ......... ... ... .. .. ........... ... ... ... ... ... ................ ... ... ... .... ... ............... ... ... ... ............... ... ... ... ..... •'e-Fine! brri• • �•.: �: P Su ittq! .(. . Q�j 58 s Pre -Final Submittal 2 days Mon 10/19/20 Tue 10/20/20 Pre -Final SubinkW ......... 5 9 ssa City of Round R fie P y o nd Rock Review Period 10 days ys .. ... .... W 0 ed 10/21/2 Tue il/3/20 ........ ........ .....••--....... •• -• .. ... ... ... ... ... ................ .a. ... v: of .R � nd � •Kiev Period �-®'•.,►cr:�•�ttY aEu Rotic ..... 60 Final Submittal PS&E (PS&E) 41 days YS .. Wed 12 16 20 Wed 10 21 / / 2/ / .. ............. ... ... .. ..... .. ....... ...... .............. ... ...... . ........... ....... ... ... ..... .............. ............ ... .. ............... ....... ... .... :.............. .... .. ... .. . Final Submittal (PS&O 61 e �► Re Review/Address Review Comments 5 days ys Wed 12/16/20 Tue 12/22/20 ... ........- ... ... ......... ... ................. ... ... :.... :. ;.•-• ... .... ..... .. .... .. ... ............ :r. ;.. •'• �R n� • eiiiew- �/lddress� Rev�w �Co •menu �'ssr- / . ......... 62 .�• Finalize a ue Detailed Design (Plan Sheets) 10 days Wed 1/13/21 Tue 1/26/21 ...... .. .. . ... .. .. .... ....................... .... .. ... ... .... .......... .... .... ... .......... ... ... .. ........ .. ... ... ... ... ... ............... ..-- --- .L..... .... ... ... ... .... ........... .... .._ .. ... ....... .. ... .. �ie Detaied• Des Plan � heels �--�•• ��� 0 ( S ) . .......... 63 88� s Finalize Supporting a ze Suppo g Documents (Estimate, GN, 5 days :.... .... Wed 1/20/21 Tue 1/26/21 ........._...... ... ... ... ... ........................... ................... ............. .. ... ... ...................... ... ... ... .. .......... ... ... ... .... ................ ... ... .._ ... ... .......----.... ... ... ... ... ................ ....;.... .. ... ... ............... ... ... .. ........ . ... . .... i . !:,s iie Su umen tie PPmK Doic (Estimate. Construction Schedule) ".o- Final Submittal (QAQC) 5 days Thu 2/4/21 Wed 2/10/21 -:Final Submittal MA QCj ; ........ 65 Final Submittal 0 days� Wed 2/10/21 Wed 2/10/21 ... .. .. .................... .. f ... .... ... ... ... _ .f.. ... ... ......... Final Subtn � '� itta� �� . • Rodriguez Transportlon Group, Inc. Task &n nnary C ibca! xf -e': � � r} .: ; : }: f Gattis School Road (Segment 3) Date: Tue 9/29/20 Page 1 Addendum to Exhibit D Fee Schedule RODRIGU TRANSPORTATION GROUP, Inc. City of Round Rock Estimate of Engineering Services Budget Gattis School Road (Segment 3) TASK RODRIGUEZ TRANSPORTATION GROUP, INC. CORSAIR CONSULTING LLC COXIMcLAIN ENV. CONSULTING INC. HDR ENGINEERING INC. INLAND GEODETICS LLC K FRIESE & ASSOCIATES INC. NANCY LEDBE'RER 8 ASSOCIATES INC. TOTAL COST FC 110 Route and Design Studies; Geotechnical Investigation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 FC 120 Environmental Documentation $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 FC 130 ROW Data/Utilities $28,967.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $281967.96 FC 140 Project Management and Administration $5,099.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $51099.04 FC 150 Field Surveying and Photogramrretry $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 FC 160 Roadway Design $7,750.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $71750.56 FC 161 Drainage $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 FC 162 Signing, Pavement Markings, Signals and Illumination $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 FC 163 Miscellaneous $11,047.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $111047.92 Subtotal -Labor $ 529865.48 $ - $ - _ - $ - $ - $ - $ 529865.48 Subtotal - Other Direct Expenses (Cardno) $0.00 $ - $ - $ - $ - $ - $ - $0.00 GRAND TOTAL $ 52,865.48 $ - $ - $ - $ $ - $ - $ 529$65.48