Loading...
R-2020-0326 - 11/12/2020RESOLUTION NO. R-2020-0326 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with CP&Y, Inc. for the Northeast Downtown Improvements Project, and WHEREAS, CP&Y, Inc. has submitted Supplemental Contract No. 2 to the Contract to modify the provisions for the scope of services and to increase the compensation, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 2 with CP&Y, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 2 to the Contract with CP&Y, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 5 51, Texas Government Code, as amended. RESOLVED this 12th day of November, 2020. CRAICYM���CyAN, Mayor City of Ro ,��Rock, Texas ATTEST: stpfilLj SARA L. WHITE, City Clerk 0112.20202-1 00458818 EXHIBIT „A» STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: CP Y., INC. ( " Engineer") ADDRESS: 13809 Research Blvd., Suite 300, Austin. TX 78750 PROJECT:, Northeast Downtown Improvements This Supplemental Contract No. 2 to Contract for Engineering Services i*s made by and between the City of Round Rock, Texas, hereinafter called the "City" and CP Y, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 12th day of September, 2019 for the Northeast Downtown Improvements Project in the amount of $960.,600-544o5� and WHEREAS, the City and Engineer executed Supplemental Contract No,, 1 on April 24, 2020 to amend the scope of services and to increase the compensation by $22,482.00 to a total of $983,082.544o9 and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $137 950.00 to a total of $1,121,032.54; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineerig Services and Exhibit B, E in�g Services shall be amended as set forth I*n the attached Addendum to Exhibit B. Exhibit C Work Schedule shall be amended as set forth I*n the attached Addendum to Exhibit C. II. Article 4., Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $137,950.00 the maximum amount payable under the Contract for a total of $1,121,032.54, as shown by the attached Addendum to Exhibit D. Supplemental Contract 0199.1949; 00458160 Rev.06/16 84275 1 IN WITNESS WHEREOF, the City and* the Engineer have executed this Supplemental Contract 1"n duplicate. Supplemental Contract 0199.1949; 00458160 Isignature pages follow) Rev.06/16 84275 2 Y, INC. llate S upplen. aental. Contract Rev,,06/16 0 199,1949, 004,58100 842 "t -) "' 7 CITY OF ROUND ROCK By: Craig Morgan, Mayor dF Date Supplemental Contract 0199.1949; 00458160 APPROVED AS TO FORM, Stephan L. Sheets, City Attorney Rev,06/16 84275 4 ADDENDUM TO EXHIBIT B Engineering Services In addition to the scope outlined in the Northeast Downtown Revitalization Project contract, dated September 12, 2019 and Supplemental No. 1, dated April 24, 2020, the engineer shall provide receptacles at the top and bottom of each light pole requiring an updated lighting plan for the project limits, easement documentation for each utility company (7 total), utility coordination oversight including an additional utility coordination meeting, schedule extension related to Library project coordination and reworking design to accommodate requests, and adjustments to light pole locations around Library site following completion of bid set. It was determined that receptacles for the light poles were not included in the original contract. Also, the City requested easement documents be prepared for each franchise utility company. Due to Library project coordination near the end of Design, the schedule was extended to accommodate change requests, which ultimately required another utility coordination meeting to ensure the utility companies signed off on the final design. Adjustments were requested to the water and wastewater line connections, drainage tie ins, grading, and lighting designs. Additional effort for Supplemental No. 2 for the Northeast Downtown Improvements Project includes: • Lighting Design o Addition of two receptacles per light pole along the entire project limits, as follows: ■ Austin Avenue between Mays Street and Sheppard Street ■ Liberty Avenue between Mays Street and Sheppard Street ■ Lampasas between Austin Avenue and Liberty Street ■ Sheppard Street between Liberty Street and Austin Avenue • Easement Documentation o Prepare detailed schematics and summary table per utility company (7 total). o Prepare metes and bounds descriptions per utility company (7 total). • Library Project Coordination o Two -month schedule extension associated with Library project coordination near the end ofDesign. o Accommodated adjustments to design of water and wastewater line connections, drainage tie-ins, and grading. o Utility coordination oversight and participation in final utility coordination meeting following design changes to ensure the utility companies signed off on the final design. o Relocate light poles around Library site following completion of bid set and re -verify conflicts with water, wastewater, drainage and dry utilities. The -tasks and products are more fully described in the following TASK OUTLINE. TASK OUTLINE III. ADDITIONAL SERVICES F. Additional effort for Supplemental No. 2: 1. LIGHTING DESIGN (a) Add two receptacles per light pole along the entire project limits and update lighting plan including additional service drops as coordinated with the Owner. 2. EASEMENT DOCUMENTATION (a) Prepare detailed schematics and summary table of conduits per segment for each utility company (7 total) according to example provided by Owner. (b) Prepare metes and bounds descriptions per utility company (7 total). 3. LIBRARY COORDINATION (a) Two -month schedule extension associated with Library project coordination near the end of Design including meetings with Library team, City, and internal team. Also accounting for coordination meetings with the Library team that were not covered in the original contract. (b) Project management activities for schedule extension including invoicing, reporting, meeting minutes, and monitoring of submconsultant work. 10/2/2020 1 of 2 (c) Accommodation of design change requests impacting water, wastewater, drainage, roadway, and utility disciplines. (d) Utility coordination oversight and participation in final utility coordination meeting following design changes to ensure the utility companies signed off on the final design. (e) Relocation of light poles around Library site following completion of bid set. Effort includes reworking lighting model, updating lighting design, adding light poles. Impacts to water, wastewater, drainage, roadway, and dry utilities will need to be re -verified. Coordination will be required with Contractor to incorporate this change at the beginning of Construction. 10/2/2020 2 of 2 ADDENDUM TO EXHIBIT C Task Notice to Proceed Lighting Adjustments Construction Phase Services Exhibit C 10/2/2020 Work Schedule Duration N/A 28 365 Completion Date Oct 23, 2020 Nov 20, 2020 Nov 20, 2021 I of I ADDENDUM TO EXHIBIT D Fee Schedule Northeast Downtown Revitalization Project Ci of ILY Roun,,:',,"':*:,,.,.:.:,,,:,::. .... .. .............. ...... d Rock ... ...... ............ ..................... Task Description Total Cost BASIC SERWES NA SUBTOTAL BASIC SERVICE $ - DIRECT EXPEL[ SUBTOTAL DIRECT EXPENSE - BASIC SERVICES SUBTOTAL $ - SPE`CZAL SERVICES SUBTOTAL SPECIAL SERVICES $ - ADDITIONAL SERVICES Lighting Design - Receptacles CP&Y $ 27,450.00 Easement Documentation CP&Y $ 17, 850.00 Library Project Coordination CP&Y $ 92,650.00 SUBTOTAL ADDITIONAL SERVICES $ 137,950.00 GRAND TOTA 137,950.00 4.0 EXHIBIT D NEDT Revitalization SUMMARY Page 1 of 2 ADDENDUM TO EXHIBIT D Fee Schedule Northeast Downtown Revitalization Project City of Round mock Fee Schedule/Budget for CP&Y, Inc. Tank Description Project Manager Deputy PM Senior Project Engineer i Engineer I Design Engineer E.I.T. CARD Operator ManagingAdmin Land Surveyor 1 Clerical Total Labor Houma Total Direct Labor Costs $190.00 $180.00 $185.00 $175.00 $125.00 $110.00 $110.00 $160.00 $75 00 Ill. ADDITIONAL SERVICES III Additional Services F1 Lighting Design - Receptacles 5 20 100 40 165 $ 27,450.00 F2 Easement Documentation 5 10 50 60 125 $ 17,850.00 F3 Library Project Coordination a Meetings w/Library (5), City (2), Internal (2) 15 30 30 15 45 15 150 $ 23,700.00 b Invoicing/Reporting/PM Coordination 5 20 5 30 $ 4,925.00 c Design Changes 5 20 40 40 40 20 40 205 $ 30.550.00 d Utility Coordination 5 25 5 5 5 45 $ 7.875.00 e Relocation of Light Poles 10 40 40 40 401 170 $ 25,600.00 it. ADDITIONAL SERVICES - S JBTQTAL HOURS SUB -TOTALS 401 135 215 1001 1301 851 1201 601 5 890 $ 137,950.00 SUBTOTAL $7,600.001 $ 24,300.00 1 $ 39,775.00 1 $ 17,500.00 1 $ 16,250.001 $9,350.001 $ 13,200.00 1 $ 9,600.00 1 $ 375.00 $ 137,950.00 4.0 EXHIBIT D NEDT Revitalization Additional Services Page 2 of 2