Contract - Brown & Gay Engineers, Inc. - 12/3/2020STATE OF TEXAS §
COUNTY OF WILLIAMSON §
SUPPLEMENTAL CONTRACT NO. 5
TO CONTRACT FOR ENGINEERING SERVICES
FIRM: BROWN & GAY ENGINEERS, INC. ("Engineer")
ADDRESS: 101 West Louis Henna Boulevard, Suite 400, Austin, TX 78728
PROJECT: Gattis School Road Segment 6
This Supplemental Contract No. 5 to Contract for Engineering Services is made by and between
the City of Round Rock, Texas, hereinafter called the "City" and Brown & Gay Engineers, Inc.,
hereinafter called the "Engineer".
WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract", on the 11 th day of February, 2016 for the Gattis School Road Segment 6
Project in the amount of $482,439.90; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 1 to the Contract on
May 10, 2018 by Resolution No. R-2018-5420 modifying the scope of services and increasing
the compensation by $401.872.25 for a total of $884,312.15; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 2 to the Contract on
October 1, 2018 to modify the provisions for the scope of services and to increase the
compensation by $8,540.00 for a total of $892,852.15; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 3 to the Contract on
September 12, 2019 to modify the provisions for the scope of services and to increase the
compensation by $177,053.00 to a total of $1,069,905.15; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 4 to the Contract on
January 23, 2020 to modify the provisions for the scope of services and to increase the
compensation by by $119,914.00 to a total of $1,189,819.15; and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for the
scope of services and to increase the compensation by $216,816.50 to a total of $1,406,635.65;
NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract
is amended as follows:
Supplemental Contract Rev.06/16
0199.1602, 00459304 84275
'~ /�
t� 1
I.
Article 2, Enaineering Seryices and Exhibit,B, shall be amended as set
forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set
forth 1"n the attached Addendum to Exhibit C.
II.
Article 4. Compensation and Exhibit D., Fee Schedule shall be amended by increasing by
$216,816.50 the lump sum amount payable under the Contract for a total of $1,406,635.65, as
shown by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental
Contract 1'0 n duplicate.
Supplemental Contract
0199.1602; 00459304
[signature pages follow]
ki
Rev.06/16
84275
BROWN GAY ENGINEERS, INC.
•
• a
November 11, 2020
Date
Supplemental Contract
0199.1602; 00459304
3
Rev.06/16
84275
CITY OF ROUND ROCK APPR ED AS TO ORM:
By:
Craig Mo gan, pyor Stephan .Sheets, City Attorney
12-2'z��o
Date
Supplemental Contract Rev.06/16
0199.1602;00459304 84275
ADDENDUM TO EXHIBIT B
Engineering Services
The work to be performed by the ENGINEER under this contract consists of providing
engineering services required for the development of construction plans for the widening and
reconstruction of Gatti*s School Road from Red Bud Lane to Via Sonoma Trail and along Red
Bud Lane approximately 500' south of Gattis School Road. The project consists of
Is
reconstructing approximately 0.65 miles of the existing 4-lane roadway section to a 6-lane
divided facility and adding a right turn lane on Red Bud Lane. This project involves surveying,
engineering analyses, and associated details necessary to produce PS&E to a 100% design,
including bidding & award services, and construction phase support.
The ENGINEER shall perform all work and prepare all deliverables in accordance with the latest
version of the City of Round Rock criteria.
The ENGINEER shall perform quality control and quality assurance (QA/QC) on all deliverables
associated with this project.
The ENGINEER shall provide traffic control in accordance with the Texas Manual on Uniform
Traffic Control Devices (TMUTCD) when performing onsite activities associated with this
contract.
PROJECT MANAGEMENT (Function Code 145)
1. Meetings
A. Attend and document Progress Meetings with the City of Round Rock (2) and with
TxDOT (10). Assume twelve (12) meetings shall be required.
2. General Contract Administration
A. Develop monthly invoices and progress reports.,
B. Subconsultant coordination.
C. Design coordination with the City of Round Rock.
D. Stakeholder/Utility Company coordination.
3. Local Government Project Procedures Checklist
A. Prepare the checklist
B. Coordinate with City of Round Rock on information as needed
Sheet 1 of 6
FIELD SURVEYING (Funct40
ion Code 150) (Inland Geodeti*cs)
1. General
A. Surveys provided will be in accordance with the "Texas State Board of Land
Surveying" and the applicable City of Round Rock regulations.
B. Survey field notes will be submitted if requested by the City of Round Rock.
C. The City of Round Rock will obtain right -of -entry agreements with property owners
for the required field surveys (short of litigation).
D. Survey control (vertical and horizontal) captured and established during the initial
phase will be utilized
E. Verify and compare prev41
iously located utility data with current ground conditions.
The Surveyor will contact the One -Call System i*n advance of performing field
surveys to attempt data collection includes ties to location of marked utilities (if
needed). This task does not always allow for timing of markings with the survey
activities. Reasonable attempts to coordinate with utility owners will be made to
achieve efficiency in data collection. Historically, results i*n this task have been
marginal and there may cause to seek additional compensation for repeated trips to
the project site to complete this effort.
2. Topographic Surveys for Engineering Design and Hydraulic Analysis
A. Survey files with previously obtained pro41
ject data will be compared to and merged
with survey files generated through this proposal. In areas of uncertainty and/or
limited topographic information, additional data will be collected as directed by the
project engineer.
B. Data collection will consist of spot elevations for improvements, edge of roadway,
10
driveways, visible or marked utilities, drainage features, centerline of roadway, and
grade breaks.
C. Profiles of intersecting driveways within the project limits will extend a sufficient
distance beyond the existing right of way to ensure adequate data i*s available to
10 19
determine tie-ins with proposed vertical alignment changes. Seven (7) driveway
locations have been identified requiring additional field data for adequate grading and
tie-in.
D. Field data for three (3) intersection locations have been identified requiring additional
field data for adequate grading and tie-in.
E. Survey shots will be assigned a unique point number which provides a positive
identification of the point. Each point will be assigned a feature number or feature
name using the TxDOT's standard feature table. An ASCII points file and a hard
Sheet 2 of 6
copy print out will be provided. Each line of the output data shall contain in this
order: the point number, northing, Basting, elevation, and the descriptive feature code.
F. Surveyed data will be provided in a Microstati*on dgn (V8) compatible two
dimensional base map format. The survey shot point attributes will appear on
separate levels.
G. A Digital Terrain Model (DTM) will be provided i*n a Mi*crostation.dgn (V8)
GEOPAK compatible three-dimensional format.
H. Prepare individual parcel plats and descriptions to be used by the City of Round Rock
for required right of way acquisition and easement process.
ROADWAY DESIGN CONTROLS (Funct10
ion Code 160)
1. 100% Design Development
Perform the following items for the project
A. Geometric Design — Revise the horizontal alignment; vertical profile; pavement
cross slopes; front slope, back slope, and ditch configuration that meet acceptable
design criteria and remain within the limits of the proposed ROW.
B. Limits of Proposed ROW — Analyze the cross sections associated with the desirable
design criteria to determine the limits of ROW necessary to accommodate the
resultant configuration. Develop an exhibit providing the ROW footprint with the
desirable configuration. Incorporate final ROW footprint into design base files and
reflect on all plan submittals.
C. Design Cross Sections — Develop roadway cross sections associated with the
proposed horizontal alignment and vertical profile in accordance with acceptable
design criteria
D. Typical Sections — Prepare existing and proposed typical sections.
E. Plan Prorile Drawings (1"=100') — Drawings to include critical basemap
information, control and benchmark data, proposed roadway improvements including
horizontal and vertical roadway geometry, pavement edge geometry, drainage,
grading and miscellaneous improvements.
F. Alignment Data Sheets -Prepare horizontal and vertical alignment data sheets with
the Geopak baseline descriptions.
G. Earthwork Quantities —Prepare final cut/fill and general earthwork calculations to
support design elements and roadway construction efforts.
DRAINAGE (Function Code 161)
100% PS&E:
A. Incorporate all design surveys into computer aided drafting and develop topographies
and surfaces. This data shall be utilized to develop drainage areas, hydrology and
Sheet 3 of 6
hydraulics. This shall include topographic working drawings to prepare the final
drainage design.
B. Develop storm water hydrology for the existing and ultimate roadway section
throughout the limits of the project. The model shall incorporate the 10%, 4% and
1 % annual chance storm (10-year, 25myear, and 100myear) events. Modeling shall
develop storm water flows to all cross culverts and roadway conveyances. Based on
the data developed, drainage infrastructure shall be designed for the project area to
include a level of detail sufficient to establish cost estimates and required easements
and possession and use agreements for the construction of the proposed drainage
structures and channel improvements.
C. Develop designs for all cross -drainage structures throughout the project limits. The
cross drainage shall be modeled with HEC-RAS.
D. Develop designs for proposed storm water collection systems for the proposed curb -
and -gutter portion of the project area. Storm sewer designs shall be developed using
Geopak Drainage.
E. Identify potential util0
ity conflicts based on design for the project area.
F. Develop drainage easement requirements for the project area,.
G. Develop locations for detention facilities i*f applicable.
H. Coordinate the design with the City of Round Rock.
Signing, Pavement Markings and Signalization (Function Code 162)
100% PS E:
A. Signing Pavement Markings — Prepare signage and pavement marking plan
sheets, layouts, and associated details.
B. Traffic Signal Layouts — Prepare traffic signal plan sheets, layouts, and associated
details.
C. Quantity Summaries — Prepare summary sheets of all signing, pavement markings,
and traffic signal quantities.
MISCELLANEOUS (ROADWAY) (Function Code 163)
100% PS E
A. Traffic Control Plans (TCP) — Prepare Sequence of Phased Construction,, Prepare
TCP cross sections to identify temporary pavement needs. Identify impacts to
existing drainage. TCP will be presented in construction plans.
B. Temporary Traffic Signals — Prepare temporary traffic signals plans and details to
accommodate construction and traffic control plan sequencing.
C. Prepare Title Sheet and Project Layout
D. Cost Estimates — Prepare updated construction cost estimates at each milestone
submittal.
Sheet 4 of 6
E. Illumination Photometric Study — Continuous street illumination will be designed
in accordance to requirements of Texas Department of Transportation Highway
Illumination Manual and modeled utilizing AGI 32 lighting software.
F. Illumination Layout Roll Plot — Prepare illumination roll plot showing illumination
pole locations and light intensity measurements on 10' grid.
G. Illumination Circuit Design, Layouts, and Details— Design conduit runs, circu40
its,
size conductors and electrical services in accordance to Texas Department of
Transportation Highway Illumination Manual and National Electric Code (NEC).
Prepare illumination plan sheets showing illumination pole location, conduit runs,
conductor size and lengths, and proposed electrical services locations.
BID PHASE SERVICES (Function Code 170)
A. Project Manual Development — Prepare project manual utilizing front-end
documents and specifications provided by City (TxDOT or COA can be used as
needed) including bid items, contract, and special conditions.
B. Provide bidding support services, including assistance with responding to bidder
'6
questions, attend pre -bid meeting, and prepare minutes. Agenda will be prepared by
the City.
C. Prepare Responses to Bidders' questions.
D. Tabulate, evaluate bids, and make apparent low bidder award recommendation
CONSTRUCTION PHASE SUPPORT SERVICES (Function Code 309)
A. Engineer shall provide construction support services, including assistance with
responding to contractor questions, attend pre -construction meeting, and prepare
minutes. Agenda will be prepared by the City.
B. Assist City with Shop Drawing and material review and approval (assume 16
submittals)
C. Assist City with preparation of Change Orders, Alternate Design or Additional
Design Details
D. Respond to Questions related to the Plans - The Engineer shall be available to
respond to questions related to the plans and specifications as needed throughout the
duration of the construction. The Engineer will document each question in sufficient
detail, formulate a response and submit a written version of the response to the City
for distribution to all involved parties. Estimate assumes no more than ten (10)
Requests for Information.
E. The Engineer representative to attend site visits as needed at the request of the City,
estimated at eight (8) site visits, not included are visits to resolve E&O issues.
F. At the completion of pond construction, the City will provide survey information for
the pond locations or modifications. With the City survey information, the Engineer
will provide certification that the ponds were constructed per plan.
Sheet 5 of 6
G. The Engineer shall not at any time supervise, direct, control, or have authority over
any contractor's work, nor shall Engineer have authority over or be responsible for
the means, methods, techniques, sequences, or procedures of construction selected or
used by any contractor, or the safety precautions and programs incident thereto, for
security or safety at the construction site, nor for any failure of a contractor to comply
with Laws and Regulations applicable to such contractor's furnishing and performing
of his work. The En9ineer will not bear any responsibility or liability for defects or
deficiencies of the contractor.
Sheet 6 of 6
ADDENDUM TO EXHIBIT C
Work Schedule
DATE*
MILESTONE
November 12, 2020
Notice to Proceed SWA #5 (Final 100% PS & E)
March 4, 2021
Submit 100% PS & E to City & TxDOT
March 22, 2021
Receive 100% Comments from City & TxDOT
July 2021
Letting (TxDOT)
September 2021
Award Construction Contract - NTP Construction
September 2021-March 2023
Construction Phase Services
ADDENDUM TO EXHIBIT D
Fee Schedule
Attached Behind This Page
PROTECT NAME: GATTIS SCHOOL RD
FROM RED BUD LN TO VIA SONOMA TRL
EXHIBIT Dml w FEE SCHEDULE
FC
DESCRIPTION
BGE�
Inland
TOTAL
FC 110
ROUTE AND DESIGN STUDIES
$0.00
$0.00
FC 120
ENVIRONMENTAL
$0.00
$0.00
FC 130
ROW
$0.00
$0.00
FC 145
GENERAL MANAGEMENT/ COORDINATION
$16,0460,00
$16,460,00
FC 150
FIELD SURVEYING AND PHOTOGRAMMETRY
$0.00
$10,27100
$10,027100
FC 160
ROADWAY DESIGN CONTROLS
$36,0176,00
$360176-00
FC 161
DRAINAGE
$54,0580,00
$54,580.00
FC 162
SIGNING, PAVEMENT MARKINGS,, AND SIGNALIZATION
$6,0306,00
FC 163
MISCELLANEOUS ROADWAY
$50,0344,00
$50,344900m
FC 170
BID PHASE SERVICES
$11,314,00
$110314,00
FC 3097
CONSTRUCTION PHASE SUPPORT SERVICES
$30,0746,00
$300746,00
EXPENSES
$618,50
$618,50
TOTAL
$206,544o5O
$10,0272oOO
$216,816950
BROWN GAY ENGINEERS, INC.
PROJECT NAME: GATTIS SCHOOL RD
FROM RED BUD LN TO VIA SONOMA TRL
EXHIBIT D-1 - FEE SCHEDULE
TASK DESCRIPTION
Senior
Project
Project
Senior
Snior
e
Senior
ENV
Admin/
TOTALLABOR
Pro
-ject Mgr
Manage r
En gineer
Engineer Tech
'L--CADD Op
ENV
Scientist
Clerical
HRS. & COSTS
Data collection
Review of data
CqMplete design'summary form
Route studies
CAMPO Application Assistance
I - Data Collection and Environmental Constraints Mapping
2. TxDOT Environmental Scoping Documentation
3. Archeological Background Study Technical Report
4. Historic Structures Project Coordination Request Form
5. Water Resources Technical Report
a. Biological Evaluation and TIer I Form
7. Hazardous Materials Initial Site Assessment
8. Traffic Noise Analysis
Coordination vAth TxDOT on ENV
-Toy$ M��
Public involvement
General public outreach
Public meetings
IBM*
I on 1 meeting_Aakeholders
I
Communit y meetings with HOAs
Utility coordination
'11XI-D
Mwz
$71048.00
General contract administration
IZFVT���
LGPP Checklist
$5,484.00
Urvis 0=1 I iKlu 7 1-
Final Design Development
Geometric design
L- $514(38.00
Revisions to Alignment fat_project limits)
OU
Design cross sections (util conflict)
$8,900.00
100% PS&E
Tvt-.:ical Sections
MWT Is 1:1111
Plan & Profile Drawings
Alignment Data Sheets
Earthwork
-Quantities
External storm water hydrology (ex/prop)
$2�T98.0 0
Internal storm water hydrology (ex/prop)
$3le42.00
HEC-RAS designs forall cross draina e x/prop) T
H)Mraulic Data Sheets _te
$30094.00
Culvert Layout P&P Sheets
r 11111
Storm Sewer P&P Sheets
Hydraulic Data Sheets -SS
$2,542.00
Identify potential utilityconflicWs4ustments
Detention Desi n
Coordinate design with the CoRR staff
—7
Senior
Project
Project
Senior
Senior
Senior
EN V
Admin/
TOTAL LABOR
TASK DESCRIPTION
Project Mgr
Manag r
Engineer
�Engineer Tech,
CADD Op
ENV
Scientist
Clerical
HRS. & COSTS
4271'1zlf
Signing & Pavement Markin Ian sheets and details
$2,230.00
Proposed Traffic Signal layouts and details
•
$2,782.00
Sheets Hrs/Sheet
#DIV/O!
#DIV/O!
#Dl .
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/0.
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
3 10.66666667
6 8.333333333
2 9
2 9
#DIV/O!
#DIV/O!
#DIV/O!
4 9
2 12
2 14
12 3.166666667
12 4.333333333
1 20
#DIV/O!
4 11
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
Quanfity Summary sheets
.0
♦ ! '
Traffic control pl_
Traffic control plans (TCPKross Sections
Traffic contro�plans (TCP)-Temp Signal analysis
Title Sheet/Project , . _ ,
$4,042.00
_ estimates
$3,84e.00
Illumination Photometric Study (Modeled in AGI 32)
Illumination Layout Roll Plot w/ light intensity measurements
$4,542.00
Illumination Circuit Design, Layouts, and Details
Project Wnual Development
Pre -bid Mee . Attendance
Revond to Bidders! Questions
$2v870.00
Bid tabulations & Award
Pre -Construction Meet . Attendance
1 1
Shop Dravvings/Submittals Review (leea)
'a
Change Orders _ = . processing
11
Respond to Contractor Questions (RFIs) (10 ea)
Project Walk-Thru/Close-out
MIT
• -S SUB -TOTALS
• - • RATE PER • -
11
11
1/
1 11
1 I/
!1 11
11
1 off
TOTAL• - •
M 111 11$
4 3 15 2. 11
,, WUMIC
.11 1 �- W :1
34,7eO.00
1 1/
1 11
1 /1
11
FUNCTION CODE
TOTAL COSTS
TOTAL
DIRECT
EXPENSE
TOTAL
LABOR
COSTS
Senior Project Project Senior Senior
Project Manager Engineer EIT Engineer CADD
Manager Tech Operator
Senior
ENV
ENV Admin/
Scientist Clerical
TOTAL MH BY FC
$2060544.50
$618.50
$205,926.00
120 248 296 416 316 0
0
0 26 1422
1422
0
USTOTAL LABOR HOURS
120 248 296 416 316 0
0
0 26 1422
1422
UBTOTAL LABOR EXPENSES
$206 5".50
$618.50
$205 926.00
8.4% 17.4% 20.8% 29.3% 22.2% 0.0%
0.0%
0.0% 1.8%
OTHER DIRECT EXPENSES I QUANTITY i UNIT i RATE f
Mileage
350
mile
$ 0.56
$198.00
Photocopies B/W 11 " X 17"
300
each
$ 0.20
$00.00
Photocopies Color 8 1 /2" X 11 "
150
each
$ 0.75
$112.50
Color 11 " X 17"
200
each
$ 1.25
$250.00
Geosearch hazmat
0
each
$ 500.00
$0.00
ar a Format Plotting
0
SF
$ 2.25
$0.00
SUBTOTAL
DIRECT EXPENSES
$618.50
OTAL LABOR COSTS 1 $205,928.00�
ANON -SALARY (OTHER DIRECT EXPENSES) $818.50_
RAND
#DIV/0!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/01
#DIV/O!
#DIV/O!
#DIV/0!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIV/0!
#DIV/O!
#DIV/0!
#DIV/O!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/O!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/O!
#DIV/O!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/O!
#DIV/0!
#DIV/O!
#DIV/0!
INLAND GEODETICS EXHIBIT D-1-FEE SCHEDULE A6onzales Est.
PROJECT NAME: GATTIS SCHOOL RD
FROM RED BUD LN TO VIA SONOMA TRL
fHOUR
.$1.60
.'.-.$ 183
$42 .36.. . . . . . . .
$1RATE$1ROE4 -32�
6.
$9
_198
HRS
4 HRS
ITE VISITS (TASK 2)
8 HRS
4 HRS
2 HRS.:�:r
:l: :_r
z�=•. •:
0. 1 ADM IM MOBILIZE
0 HRS
0 HRS
-,-O.HRS
0 HRS- HRS
12.. HRS
0 HRS
4. _HRS
0 HRS,
2 HRS
`: .
-------
DDNL FIELD SURVEY
26 HRS
1 HRS
2 HRS
8 HRS
4 HRS
2 HRS
- ::.T:....rrr:-. ' _• _•:
DELIVERABLES
2 HRS
2 HRS
16 HRS:_
2 HRS
+._: r: {.::4r__ _ :tr_
50.2:`.
FIELD- SURVEYING
26 HRS
-0HRS,
.0 HRS .3-HRS
.4 -HIRS
8 HRS,
20 HRS,
0 HRS
4 �.HRS
_,..
__ .. :�. .f•:
BOUNDARY ANALYSIS
_ _
SECONDARY FIELD SURVEY
. . I . :}• f:..., v:-
I . . . . .
ROW ACQ PARCEL PROD 11,,7ti)v.:
nz
ROW MONUMENTATION (11)
50.30
HIRS
�O HRS
.0 HRS_
0 H RS 0 HRS
0 S.HRS.0
_HR
�-O HRS
0 -HRS
0
HRS
. . . . . . . . . . . .
. . . . . . xa_
26
RY.
REIMBURSEABLE ITEMS
REIMBURSEABLE SERVICES•
. . . . . . . . . .
'A
5 _8
*30'
._
2
t: 0
.0-M.
3�:i::`.
Cost Variables: Reimburseable Services Include:
GPS Receivers $15
Vehicle $60
ATV $55
Total:
Reimburseable Fees Include:
SUPPLIES
TITLES
Total:
$0.00
$0.00
$0.00
This Page is too large to OCR
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
10fi
Complete Nos,, l - 4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos. i, 21 31 5, and s if there are no interested parties. CERTIFICATION D FILING
1 Name of business entity filing form, and the city, state and country of the business entity's place Certificate Number:
of business. 2020-688236
BGE, Inc.
Austin, TX United States Date Filed:
2 Name of governmental entity or state agency-- thafles a party to the contract for which the form is 11/10/2020
being filed.
City of Round Rock Date Acknowledged:
11/12/2020
g Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
000000
Providing engineering services required for the development of construction plans for the widening and reconstruction of Gattis
School Road from Red Bud Lane to Via Sonoma Trail and along Red Bud Lane
4 Name of Interested Party
City, State, Country (place of business)
Nature of interest
(check applicable)
Controlling
Intermediary
Harris, Charles-
Austin, TX United States
X
William, billion
Frisco, TX United States
X
Randermann, Randy
Houston, TX United States
X
Lennard, Lee
Houston, TX United States
X
5 Check only if there is NO Interested Party.
6 UNSWORN DECLARATION
My name is ,and my date of birth is
My address is
(street) (city) (state) (zip code) (country)
declare under penalty of perjury that the foregoing is true and correct.
Executed in County, State of , on the day of , 20
(month) (year)
Signature of authorized agent of contracting business entity
(Declarant)
Forms provided by Texas Ethics Commission www,ethicsstate,tx,us Version Vl,1,3a6aaf7d