Loading...
CM-2020-347 - 12/11/2020Page I of 3 rev, 01/16 Department: Project Name: City Project ID Number Contract Quantity Adiustment/Change Order TRANSPORTATION ADMINISTRATION SUNRISE AT LUTHER TRAFFIC SIGNAL Date: 12/2/20 Change Order/Quantity Adjustment No. TWO (2) Vendor AUSTIN TRAFFIC SIGNAL CONST. CO., IN( PO BOX 120 ROUND ROCK, TX 78680 512-255-9951 Company Name Address Phone No. Justification 2258-CO1 Striping completed in a separate contract SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order (Liquidated Damages): Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval 0 Amount % Change $306,461.90 -$10,578.60 -$10,578.60 604 $295,883.30 $1,380.00 0% -$9,000.00 -3% -$7,620.00 -3% $288,263.30 -$18,198.60 Prepared By: �, � ,4 Collette Phillips, Asst Controller, Austin Traffic S�nal 12/2/20 Signature Printed Name, Title, Company Date mma� Id Approvals Contractor: .I Ed Schroeder, Vice-Pres, Austin Traffic Signal 12/2/20 Signature V Printed Name, Title, Company Date City Project Manager �� Matthew Bushak 12l3/20 r. Slanatvre Printed Name. Title Date BtuAli 1 111 CW-'?baVr --?/- -7 /a-II-aa� Page 2 of 3 rev, 01116 Contract Quantity Adjustment/Change Order Project Name: SUNRISE AT LUTHER TRAFFIC SIGNAL Quan. Adj./Change Order No.: TWO (2) Change Order Data AdjustmentContract rime Page 3 of 3 Contract Quantity Adjustment/Change Order JN, R D ROCK rev, 01116 Project Name: SUNRISE AT LUTHER TRAFFIC SIGNAL Quan. Adj./Change Order No.: TWO (2) Quantity Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 25-0 0 REF PVMK -1) SLD 8in 100M LF -143 $ .00 -$429.00 26-0000 REF PVMK (TY-1) SLD 12in 100M LF -224 $6.00 -$1,344.00 27-0000 REF PVMK (TY-1) SLD 24in 100M LF -94 $13.00 -$1,222.00 28-0000 REF PVMK (TY-1) ARROW 100M EA -4 $250.00 -$1,000.00 29-0000 REF PVMK (TY-1) WORD 100M EA -3 $315.00 -$945.00 30-0000 REF PVMK (YELLOW 4in) LF -850 $1.50 -$1,275.00 31-0000 REF PVMK (YELLOW-12in) LF -140 $7.00 -$980.00 32-0000 PAVEMENT SEALER (4 in PVMK) LF -850 $0.40 - 340.00 33-0000 PAVEMENT SEALER (8 in PVMK) LF -143 $0.70 -$100.10 34-0000 PAVEMENT SEALER (12 in PVMK) LF -365 $0.95 - 346.75 35-0000 PAVEMENT SEALER (24 in PVMK) LF -94 $1.20 -$112.80 36-0000 PAVEMENT SEALER (ARROW) EA -2 $56.00 -$112.00 37-0000 PAVEMENT SEALER (WORD) EA -1 $69.00 -$69.00 38-0000 REF PVMK (TY-1-C) EA -7 $13.00 -$91.00 39-0000 REF PVMK (TY-II-A-A) LF -44 $13.00 -$572.00 40-0000 ELIM EXIST PVMKS (4 in) LF -225 $4.00 -$900.00 41-0000 ELIM EXIST PVMKS (ARROW) EA -2 $315.00 -$630.00 42-0000 PAVEMENT SURFACE PREP (4in PVMK) LF -850 $0.01 -$8.50 4 -0000 PAVEMENT SURFACE PREP (8in PVMK) LF -143 $0.05 -$7.15 44-0000 PAVEMENT SURFACE PREP (12 in PVMK) LF -365 $0.10 -$36.50 45-0000 PAVEMENT SURFACE PREP (24 in PVMK) LF -94 $0.20 -$18.80 46-0000 PAVEMENT SURFACE PREP (ARROW) EA -2 $13.00 -$26.00 47-0000 PAVEMENT SURFACE PREP (WORD) EA -1 $13.00 -$13.00 $0.00 $0.00 ROUND ROCK TEXAS TRANSPORTATION Mayor Craig Morgan Mayor Pro -Tern Writ Baese CounciLmembers Tammy Young Rene Flores Matthew Baker Will Peckham Hilda Montgomery Project Sunrise Road and Luther Peterson Place Intersection Improvements Contractor Austin Traffic Signal Construction, Inc. Date October 28, 2020 CALCULATION FOR LIQUIDATED DAMAGES City Manager Laurie Hadley City Attorney Stephan L. Sheets 2/25/2020 Notice to Proceed Date 150 Contract Days to Substantial Completion 7/24/2020 Contractual Substantial Completion date 8/1112020 Actual Substantial Completion Date (Everything installed and ready for the meter) 18 Number of Calendar Days Past Substantial Completion Date $500 Liquidated Damages/Day $9,000 Total Liquidated Damages Matthew Bushak, P.E., Transportation Engineer CITY OF ROUND ROCK TRANSPORTATION DEPARTMENT . 3400 Sunrise Road, Round Rock, Texas 78665 (P) 512.218.7044 . (F) 512.218.5563 . roundrocktexas.gov City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Austin Traffic Signal Construction Co., Inc for the Sunrise Road and Luther Peterson Place Intersection Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/11/2020 Dept Director: Gary Hudder, Transportation Director Cost: $0.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA-CO#2-Sunrise & Luther Peterson Traffic Signal -signed Department: Transportation Department Text of Legislative File CM-2020-347 The change order deletes the quantities associated with striping that was placed and paid for under the 2019 Arterial Street Maintenance Project. In addition, the contractor achieved substantial completion eighteen days past the contractual date and i being charged $9,000 for liquidated damages. The cost of the QA/CO is-$19,578.60 and adjusts the original contract from $306,461.90 to $288,263.30. Cost:-$19,578.60 Source of Funds: RR Transportation and Economic Development Corporation (Type 8) City of Round Rock Page 1 of 1