CM-2021-021 - 1/22/2021Page I of 3 pp{j/m Y�CJt � ev, 01. 16 Department: Project Name: City Project [D Number Vendor Contract Quantity Adjustment/Change Order Utilities and Environmental Services Oak Bluff and Greenfield Drainage Improvements Date: 111212X Change Order/Quantity OKBLF Adjustment No. 3 MA Smith Contracting Co., Inc. 15308 Ginger Street, Austin TX 78728 512-990-7640 Company Name Address Phone No. Justification Add custom side fencing at 15 Meandering Way In lieu of previously contemplated gates; add gates in wire fencing at Johnson property; add chain Ink fence panels for isolating construction from residential yards; add modification to area inlet at 19 Evergreen Drive. Adjust for final quantities. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: 240 I 0 $25,107.94 1.44% $9,775.39 0.56% $34,883.33 2.01% $1,773,028.08 �. ; -.. $3,015.83 New Contract Time: 240 Prepared By: 1 4Danny Halden, P.E., City Engineer, City of Round Rock 1/12/2 Signature Printed Name, Title, Company Date Contractor: ' Christopher Lopez MA Smith Contracting Co., Inc. 01/13/21 City Project Signature Printed Name, Title, Company Date 1 Manager:a►eX n Danny Halden, P.E., City Engineer, City of Round Rock 1/12/2� g1ature W Printed Name, Title Manacier'ty ./ / `L�Gl c�1 /Date Signature Printed Name, Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order ROUND ROCK rev, 01 16 Project Name: Oak Bluff and Greenfield Drainage Improvements Quan. Adj./Change Order No Chan4e Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 40 60 L,F. Custom Wood Side Fencing L.S. 1 $3,777.82 $3,777.82 41 Gate for Wire Fence EA. 2 $1,333.20 $2,666.40 42 Chain Link Fence Panels L.S. 1 $2,951.98 $2,951.98 43 Modify Area Inlet Top L.S. 1 $379.19 $379.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order :r !� ROUND ROCK rev, 01, 16 Project Name: Oak Bluff and Greenfield Drainage Improvements Quan. Adj./Change Order No.: Quantity Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 10 Flex. Base (CR 123) 30" Thickness C.Y. 30 $100.00 $3,000.00 12 Safety Fencing L.F. -300 $2.50 -$750.00 13 Protective Fencing (Tree Protection) L.F. -180 $5,00 -$900.00 14 Wire Fence L.F. 155 $11.50 $1,782.50 15 Wood Fence L.F. -90 $35.00 -$3,150.00 16 Wood Fence Vehicular Gate EA. -2 $1,100.00 -$2,200.00 18 Trench & Excavation Safety Systems L.F. -290 $1.00 -$290.00 20 Dry Stack Rock Wall S.F. 99 $40.00 $3,960.00 22 Concrete Riprap S.Y. -98 $67.00 -$6,566.00 23 Stabilized Construction Entrance EA. -1 $1,900.00 -$1,900.00 24 Rock Berm L.F. -44 $25.00 -$1,100.00 27 Concrete Mow Strip C.Y. -3 $510.00 -$1,530.00 28 Metal Beam Guard Railing L.F. -71 $32.00 -$2,272.00 29 Mtl. Beam Guard Rail End Treatment EA. 1 $3,700.00 $3,700.00 30 Mtl. Beam Guard Rail Short Radius EA. -1 $1,900.00 -$1,900.00 AA-8 Concrete Riprap S.Y. 5 $70.00 $350.00 AA-9 Non-native Seeding S.Y. -400 $5.00 -$2,000.00 AA-10 Stabilized Construction Entrance EA, -1 $2,000.00 -$2,000.00 AA-11 Erosion Control Logs L.F. -80 $10.00 -$800.00 AA-12 Silt Fence L.F. -210 $2.50 -$525.00 AA-13 Chain Link Fence L.F. -19 $25.00 -$475.00 AA-14 Chain Link Pedestrian Gate EA. -2 $500.00 -$1,000.00 AA-16 Flex. Base (19 Evergreen Driveway) S.Y. -77 $20.00 -$1,540.00 $0.00 $0.00 TOTALS: - 18105.50 0 Z! ROUND ROCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 3 with MA Smith Contracting Co., Inc. for the Oak Bluff and Greenfield Drainage Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 1/22/2021 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: Indexes: 2014 Drainage Revenue Bonds Attachments: OakBluff CO-QA 3_ContractorAddress_1-11-16 (I) -executed Department: Utilities and Environmental Services Text of Legislative File CM-2021-021 Quantity Adjustment/Change Order No. 3 (QA/CO No. 3) is for the following: 1. The City and owners at 15 Meandering Way previously entered into agreement that provided for installation of removable panels in the sides of the owner's wood fencing in the area of the City's easement. Upon construction of one of the panels, the owners were not pleased with the fence top profile. CA/CO No. 3 provides for custom construction of the side panels to appease the property owners. 2. The Johnson family requested the installation of fencing along the newly constructed drainage channels to prevent livestock from entering the channels and potentially escaping from their property. QA/CO No. 3 provides for the installation of gates in said fencing to facilitate access to the channels. 3. QA/CO No. 3 provides for installation of temporary chain -link fence panels to separate the construction area from the remainder of the residential yards at 23 Evergreen Drive and 15 Meandering Way. 4. QA/CO No. 3 provides for modification of the inlet opening on one side of the area inlet located just west of the driveway at 19 Evergreen Drive in order to prevent stormwater ponding in the roadside Swale. The cost of this item was effectively funded by the design engineer through voiding of a services invoice of a comparable amount. City of Round Rock Page 1 of 2 Agenda Item Summary Continued (CM-2021-021) 5. QA/CO No. 3 adjusts the final project quantities. The first QA/CO increased the contract; the second QA/CO provided for a contract reduction; and this QA/CO No. 3 further reduces the contract by $8,330.11. As per QA/CO No. 3, the difference between the Original Contract Price and the Adjusted Contract Price is $3,015.83, for a net increase of 0.17%. Staff recommends approval. Cost: (-$8,330.11) Source of Funds: 2014 Drainage Revenue Bonds City of Round Rock Page 2 of 2