CM-2021-039 - 2/5/2021Page 1 of 3 Contract Quantity Adjustment/Change Order ' RO{lN�ROpC 1F%AS rev, 01/16 Department: Project Name: Kenney Fort Blvd Overlay Date: 1/27/21 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Lone Star Paving 11675 Jollyville Rd, Suite 150 Austin, TX 78759 512-428-5778 Company Name Address Phone No. Justification -ity of Round Rock did not include the turn lanes into the original contract. These turn lanes are going into Kalahari which also needed striping. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Amount % Change 0% $0.00 0% $0.00 0% $383,189.61 $13,264.11 Original Contract Time: 30 Time Adjustment by previous Quan. Adj./Change Order: 32 Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 62 Prepared By: Ruben Romero, PM, Lone Star Paving 1/27/2021 Signature Printed Name, Title, Company Date Contractor: A-z�aof' Ruben Romero, PM, Lone Star Paving 1/27/2021 City Signature Printed Name, Title, Company Date r �. Pro'ect , Manager: -2'7— 111 gnature Printed Name, Title Date Mayor/City Manager' AIAV, Iva IA"'o A-4 bb n CA+-2- 0zi_D�9 Page 2 of 3 Contract Quantity Adjustment/Change Order �R�UNO ROCK rev, 01'16 Project Name: Kenney Fort Blvd Overlay Quan. Adj./Change Order No Chanae Ardpr Data Item Description Unit Price _ •.1 11 _ oil _ '.1 11 _ •.1 11 _ off _ M 11 _ '.1 11 , • 1 1 1 1 Page 3 of 3 Contract Quantity Adjustment/Change Order ao« rev, 01116 Project Name: Kenney Fort Blvd Overlay Quan. Adj./Change Order No Ouantitv Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 1 Surface Milling - 2" Depth SY 865 $0.75 $648.75 2 Machine -Laid Type D HMAC Overlay - 2" TON 115.21 $91.00 $10,484.11 4 REFL PAV MRK TY I - 4" (BRK)(100 MIL) LF 221 $0.75 $165.75 5 REFL PAV MRKR TY I-C EA 31 $10.75 $333.25 6 REFL PAV MRK TY I - 8" (SLD)(100 MIL) LF 162 $1.25 $202.50 7 REFL PAV MRK TY I - 12" (SLD)(100 MIL) LF 137 $3.75 $513.75 8 REFL PAV MRK TY I - 24" (SLD)(100 MIL) LF 27 $22.00 $594.00 9 REFL PAV MRK TY I (ARROW)(100 MIL) EA 1 $161.00 $161.00 10 REFL PAV MRK TY I (WORD "ONLY")(100 MIL) EA 1 $161.00 $161.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 13 264.11 0 = ROUND ROCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Lone Star Paving for the Kenney Fort Boulevard Overlay Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/5/2021 Dept Director: Gary Hudder, Transportation Director Cost: $13,264.11 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA-CO#1_partexec Department: Transportation Department Text of Legislative File CM-2021-039 Along with the Kenney Fort Intersection Improvements which provided new turn lanes into the Kalahari Development an overlay project was completed. These are items that are an extension of the quantity on the original contract such as the additional asphalt (HMAC) for the turn lanes and the striping and milling that was not included in the contract items. The total for this quantity adjustment is $13,264.11. The total adjusted contract price is $383,189.61. Cost: $13,264.11 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock Page 1 of 1