Loading...
CM-2021-040 - 2/5/2021STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: K FRIESE & ASSOCIATES, INC. ("Engineer") ADDRESS: 1120 S. Capital of Texas Highway CityView 2, Suite 100, Austin, TX 78746 PROJECT: Sam Bass Road 48-inch Water Transmission Main This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and K Friese & Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 5th day of December, 2019 for the Sam Bass Road 48-Inch Water Transmission Main Project in the amount of $73,671.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on September 24, 2020 to amend the scope of services and to increase the compensation by $318,092.00 to a total of $391,763.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $22,503.25 to a total of $414,266.25; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. 04, Z021-0467 Supplemental Contract 0199.1961; 00464325 Rev.06/16 84275 Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $22,503.25 the lump sum amount payable under the Contract for a total of $414,266.25, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow) Supplemental Contract 0199.1961;00464325 Rev.06/16 84275 K FRIESE & ASSOCIATES, INC. By: 4/ L(2= Thomas M. Owens, P.E., Exec. VP 28 JAN 21 Date Supplemental Contract Rev.06/16 0199.1961; 00464325 84275 CITY OF ROUND ROCK By: lW l � rty Ma nager Date Supplemental Contract 0199.1961; 00464325 aAPP O D AS TO ORM: Stepha L. Sheets, City Attorney Rev.06/16 84275 ADDENDUM TO EXHIBIT A City Services The City of Round Rock (City) will provide the following information and other assistance to K Friese & Associates, (Engineer) that the City deems appropriate and necessary. 1. Any readily available pertinent existing information relating to the services to be performed by the Engineer; the City will provide one copy of such information in a format chosen by the City. 2. Clear direction and/or response to questions or requests made by the Engineer in the course of the Engineer's performance of services. 3. Timely review of deliverables that have been properly completed and submitted by the Engineer, and timely provision of comments, if any, to the Engineer resulting from said reviews. 4. Prepare and provide Rights -of -Entry to enable scoped survey field work. 5. Negotiate and acquire proposed easements as required for Sam Bass Water Transmission Main construction and operation. 6. Negotiate and execute Interlocal Agreement with Williamson County to allow for joint bidding the proposed Sam Bass Water Transmission Main with the Williamson Country Sam Bass Road Improvements. ADDENDUM TO EXHIBIT B Engineering Services SUPPLEMENTAL SERVICES DESCRIPTION These Supplemental Services include performing topographic ground survey and boundary survey services to collect existing surface data and prepare easements along Sam Bass Road per the Surveying And Mapping, LLC (SAM) proposal attached. SCOPE OF WORK 1. Project Management — This task includes processing supplemental, processing invoices, routine communications, and coordination of subconsultant; 2. QA/QC — Perform review of provided survey and easement documents for conformance with Scope of Work; 3. Right -of -Entry — Coordinate with City of Round Rock on right -of -entry to perform field work, including access and schedule; 4. Survey and Easement Document Preparation — SAM will conduct full ground survey and additional boundary survey of the proposed easement areas as described in their proposal attached; and, 5. Deliverables: a. 3D CAD file with additional topographic data; b. Easement documents (plat/field note) signed/sealed by a Texas RPLS in PDF format; and, c. Closure Reports. SCHEDULE We anticipate coordinating right -of -entry requests immediately upon immediately upon authorization and completing field work and receiving topographical data within 30 days of receiving right -of -entry. We anticipate receiving proposed easement documents within 30 days of receiving right -of -entry. SAM, LLC SAM 4801 Southwest Parkway, Bldg. Two, Suite 100, Austin, TX 78735 Ofc 512.447.0575 Fax 512.326.3029 info@sam.biz www.sam.biz TBPLS # 10064300 Via Email: jbybel@kfriese.com January 15, 2021 Mr. Jason Bybel, P.E., PMP Senior Engineer K Friese + Associates 1120 S. Capital of Texas Highway, City View 2, Suite 100 Austin, TX 78746 Re: Sam Bass Road Waterline Easement — Supplemental 4 Additional Easements SAM Proposal No. 1017038216A Dear Jason: Surveying And Mapping, LLC (SAM) appreciates the opportunity to submit a proposal in response to your request for surveying services along Sam Bass Road. This proposal is based upon the information provided to us and includes those services required to provide easement exhibit preparation. See next page for a graphic representation of approximate project limits. After reviewing the attached proposal, please do not hesitate to call me if you have any questions. Sincerely, Scott C. Brashear, RPLS Project Manager Cc: Donald Zdancewicz, RPLS SAM SCOPE OF SERVICES AND FEE Sam Bass Road Waterline Easement PROJECT OVERVIEW Surveying and Mapping, LLC (SAM) will provide professional surveying services to K Friese + Associates (Client) relating to the Sam Bass Road project in Williamson County, Texas. The approximate project limits are depicted below in red. J '' L "IM• FULL SURVEY C� i vNcvcl�nNunwiA:eouvuurr �, ._ r�hn�;,>iL.iP!ppOP� y�, ? _SAM BASS AD 714G. J �ay�,' f C(W.'WLYE lqiiiiiF e�i SAM 5 RD IU -"JE'f__wa1M CPwMs _ _'_•__- - - _.t.. r --. ,� 3 4[ ` uJMA:E ROW .... �•-�•... •♦� � `w�Q�RE.�.n 1pTEalINE EgFMENT —_. _••— iv +dMCAuasn.N� � - ¶4AfYRNLY��" PROPOSED EASEMENT #3 - 55 unr,.iNa�r ` PROPOSED EASEMENT 04 TO 52' WIDTH - FULL SURVEY VARYING WIDTH - FULL SURVEY MiL4 1. ... •s SAM ASSUMPTIONS Survey will be performed in accordance with the attached Survey Scope of Work, with the following assumptions. If these assumptions do not prove correct, it may require the negotiation of a supplemental agreement: • Horizontal Datum and basis of bearings will be Texas Coordinate System, Central Zone (4203), NAD 83, and units will be U.S. Survey Feet, as derived from GPS observations and/or existing survey control in the immediate vicinity. • Vertical Datum will be the North American Vertical Datum of 1988 (NAVD88) and units will be in U.S. Survey Feet, as derived from GPS observations and calculated using Geoid 12B, and/or existing survey control in the immediate vicinity. • Unimpeded access to the property will be provided. Any locked gates will be made accessible to our field crews. Assumption is made that there are no delays accessing the property that would hamper our work. • Sufficient existing monuments marking the control exist and can be found in good condition. • Linework for easement will be provided by the client. • SAM shall utilize our existing ROW basemap from previous Sam Bass Road (Corridor H) project. EASEMENT EXHIBIT PREPERATION • Utilizing the existing ROW basemap, SAM shall prepare easement documents for up to four (4) affected properties. Documents shall consist of the following: o Easement plat o Field note (metes and bounds) description o Closure reports • All easement documents will be submitted to the client for review. Upon completion of a one- time review of all easement documents, SAM will make any necessary corrections. The final easement documents will then be delivered to the Client. Addressing any additional comments is outside of this scope of services. • Upon approval of the preliminary easement documents, SAM shall set the easement corners (up to 12 corners). The easement corners shall consist of 5/8-inch iron rods with plastic caps stamped "SAM". ADDITIONAL GROUND SURVEY • Field crews shall conduct supplemental ground survey within the proposed easements areas that was not previously captured during the original Corridor H project. • Topographic data shall be depicted on all proposed easement plats. SAM PROJECT DELIVERABLES Deliverables to Client will consist of the following: • Easement documents (plat/field note) signed/sealed by a Texas RPLS in PDF format • Closure Reports FEE These professional services will be performed according to the following estimated fees: Easement Preparation $18,473.25 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page K FRIESE + ASSOCIATES . r-UBIIC PROJECT ENGINEERING Sam Bass 42-Inch Water Transmission Main Final Design Exhibit C Project Schedule ID Task Name Duration (Start Finish Predece 1 2� Sam Bass Road 42-Inch Transmission Main Fine 386 days Mon 10/5/2(Mon 3/28/2S Notice to Proceed 0 days Mon 10/5/2C Mon 10/5/2C 3 Task 1 - Project Management 209 days Mon 10/5/2(Thu 7/22/21 2 4 1.1.Project Management/Administration 180 days Mon 10/5/2C Fri 6/11/21 1.2.Quality Assurance/Quality Control 203 days Mon 10/5/2(Wed 7/14/21 6 General QA/QC 180 days Mon 10/5/2C Fri 6/11/21 7 60% Internal QA/QC Review and Revisio 10 days Tue 2/16/21 Mon 3/1/21 21,22,2 8 90% Internal CA/QC Review and Revisio 10 days Wed 5/5/21 Tue 5/18/21 32,33,3. 9 100% Internal QA/QC Review and Revisi 10 days Thu 7/1/21 Wed 7/14/2140,41,4 10 1.3.Project Meetings $ Status Reports (8 Me( 209 days Mon 10/5/2(Thu 7/22/21 11 Design Kickoff Meeting 1 day Mon 10/19/2Mon 10/19/2 2 FS+10 12 60% Design Review Meeting 1 day Tue 3/16/21 Tue 3/16/21 27 13 90% Design Review Meeting 1 day Wed 6/2/21 Wed 6/2/21 36 14 100% Design Review Meeting 1 day Thu 7/22/21 Thu 7/22/21 44 15 Williamson County Utility Coordination 11 day Tue 11/3/20 Tue 11/3/20 21SS+1( 16 Williamson County Design Coordination 1 day Tue 12/1/20 Tue 12/1/20 21SS+3( 17 Pre -Bid Conference 1 day Mon 10/5/2C Mon 10/5/2C 18 Bid Opening 1 day Mon 10/5/2C Mon 10/5/2C 19 Task 2 - Phase B - 60% Design Phase 111 days Tue 10/20/21 Tue 3/23/21 11 20 2.1.Site Investigation and Soil Resistivity Testing 1 day Tue 10/20/2(Tue 10/20/2(2FS+10 21 2.2.Plan Preparation 75 days Tue 10/20/2( Mon 2/1/21 2FS+10 22 2.3.Specifications 25 days Tue 12/15/2(Mon 1/18/2121SS+4( 23 2.4.Opinion of Probable Construction Costs 10 days Tue 2/2/21 Mon 2/15/2121 E24 Rights of Entry Provided 0 days Mon 2/15/21 Mon 2/15/21 25 Suppemental #2 - Survey and Easement 22 days Mon 2/15/21 Tue 3/16/21 24 26 60% Design Submittal to CORR & Williams(0 days Mon 3/1/21 Mon 3/1/21 7 27 CORR Review Period 10 days Tue 3/2/21 Mon 3/15/2126 28 2.5.Review and Respond to 60% Design Reviev 5 days Wed 3/17/21Tue 3/23/21 12 29 2.6.Utility Coordination 80 days Wed 11/4/2CTue 2/23/21 15 30 Task 3 - Phase C - 90% Design Phase 56 days Wed 3/24/21 Wed 6/9/21 28 31 3.1.Easement Document Prepartion 20 days Wed 3/24/21Tue 4/20/21 32 3.2.Plan Preparation 30 days Wed 3/24/21Tue 5/4/21 33 3.3.Specifications 25 days Wed 3/24/21Tue 4/27/21 34 3.4.Opinion of Probable Construction Costs 5 days Wed 4/28/21Tue 5/4/21 33 Anticipated NTP: 9/24/2020 Date: Tue 1/26/21 Design Completion Date: 7/02/2021 mpiete 0% 100% j Oct '20 7 1 4 ♦ 10/5 I 18 1 25 Nov'20 0% 0% 0% M 0% T 0% 0% ■ Task INESSEP- - External Milestone Split Inactive Task Milestone ♦ Inactive Milestone Summary Inactive Summary Project Summary Manual Task External Tasks Duration -only Manual Summary Rollup Manual Summary Start -only Finish -only Deadline Critical Dec'20 j Jan '21 29_�6 1 13 1 20 1 27 1 3 1 10 ,L 17 E1 i Critical Split Progress Manual Progress Supplemental Services #2 Version 2.0 Feb '21 24 � 31 i 7 1 14 i ♦ 2/15 Page C- 1 Sam Bass 42 WTM Design - Exhibit C K K FRIESE + ASSOCIATES PUBLIC PROJECT ENGINEERING Sam Bass 42-Inch Water Transmission Main Final Design Exhibit C Project Schedule Supplemental Services #2 Version 2.0 ID Task Name Duration Start Finish Predece! % I Oct'20 I Nov'20 I Dec'20 Jan'21 Feb'21 tComplete) 27� 1 4 _ 11 18 25 1 1 8 1 15 1 22 1 29 1 6 1 13 20 1 27 3 i 10 17 24 31 L 35 90% Design Submittal to CORR & Williamsc0 days CORR Review Period 10 days 3.5.Review and Respond to 90% Design 5 days Review Comments 3.6.Utility Coordination 50 days Task 4 - Phase D -100% Design Phase and Bid 208 days 4.1.Plan Preparation 10 days 4.2.Specifications 5 days 4.3.Opinion of Probable Construction Costs 5 days 100% Design Submittal to CORR & William!0 days CORR Review Period 5 days 4.4.Review and Respond to 100% Design Revie 2 days 4.5.Preparation of Final "For Bid" Documents 2 days Design Complete Issue Final Plans & Speci 0 days 4.6.Prebid Conference 1 day 4.7.Contractor's Questions 15 days 4.8.Addenda 15 days Bid Opening 1 day 4.9.Bid Evaluation and Award Recommendation 5 days Construction NTP 0 days 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Tue 5/18/21 Tue 5/18/21 8 0% Wed 5/19/21Tue 6/1/21 35 0% Thu 6/3/21 Wed 6/9/21 13 0% Wed 3/24/21Tue 6/1/21 29 0% Thu 6/10/21 Mon 3/28/2:37 0% Thu 6/10/21 Wed 6/23/2138 0% Thu 6/24/21 Wed 6/30/2140 0% Thu 6/24/21 Wed 6/30/2140 0% Wed 7/14/21 Wed 7/14/219 0% Thu 7/15/21 Wed 7/21/2143 0% Thu 7/22/21 Fri 7/23/21 44 0% Mon 7/26/21Tue 7/27/21 45 0% Tue 7/27/21 Tue 7/27/21 46 0% Mon 10/4/21 Mon 10/4/2147FS+41 0% Tue 10/5/21 Mon 10/25/248 0% Tue 10/26/21 Mon 11/15/249 0% Mon 11/22/2Mon 11/22/250FS+4 0% Tue 11/23/2] Mon 11/29/2 51 0% Mon 3/28/22Mon 3/28/2251FS+9( 0% Task External Milestone Manual Summary Rollup Critical Split Split Inactive Task Manual Summary I Progress Anticipated NTP: 9/24/2020 Milestone ♦ Inactive Milestone Start -only Manual Progress Date: Tue 1/26/21 Design Completion Date: 7/02/2021 Summary Inactive Summary Finish -only Project Summary Manual Task Deadline External Tasks Duration -only Critical Page C- 2 Sam Bass 42 WTM Design - Exhibit C K FRIESE Sam Bass 42-Inch Water Transmission Main Final Design Supplemental Services #2 + ASSOCIATES Exhibit C Version 2.0 1L. PUBLIC PROJECT ENG.'.�:il-,'-: i, Project Schedule Mar '21 Apr '21 I may '21 Jun '21 { Jul '21 Aug'21 Sep '21 { Oct '21 Nov'21 21 28 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 1 8 1 15 1 22 1 29 1 5 1 12 1 19 26 1 3 1 10 1 17 1 24 31 1 7 ♦� 3/1 Task External Milestone Manual Summary Rollup Critical Split Split II,II,,,,,,,,IIIIII Inactive Task Manual Summary Progress Date: Tue 1/26/21 Anticipated 9/24/2020 Milestone ♦ Inactive Milestone Start -only E Manual Progress 6/ Design Completion Date: 7/02/2021 Summary I Inactive Summary Finish -only ] Project Summary " Manual Task I I Deadline External Tasks Duration -only Critical Page C- 3 Sam Bass 42 WTM Design - Exhibit C K FRIESE + ASSOCIATES " OJECT ENGINEERING Sam Bass 42-Inch Water Transmission Main Final Design Exhibit C Project Schedule Mar'21 I Apr'21 I May'21 Jun '21 1 Jul '21 Aug'21 21 28 1 7 14 21 28 1 4 1 11 18 25 1 2 1 9 16 1 23 30 6 13 20L 27 4 11 18 25 1 1 ♦ 5/18 Task External Milestone Split Inactive Task Anticipated NTP: 9/24/2020 Milestone ♦ Inactive Milestone Date: Tue 1/26/21 Design Completion Date: 7/02/2021 Summary Inactive Summary Project Summary Manual Task External Tasks Duration -only ♦ F7/14 ♦--a,-27— Supplemental Services #2 Version 2.0 Sep '21 1 Oct'21 Nov'21 15 22 29_J__5 1 12 19 26__L__ 3 1 10 17 1 24 31 1 7 Manual Summary Rollup Critical Split Manual Summary Progress Start -only E Manual Progress Finish -only I Deadline Critical Page C- 4 Sam Bass 42 WTM Design - Exhibit C ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page K•FRIESE ASSOCIATES SAM BASS 42-INCH WATER TRANSMISSION MAIN FINAL DESIGN SUPPLEMENTAL SERVICES #2 EXHIBIT D VERSION 1.0 FEE SCHEDULE Billing Rate $ 250.001 $ 250.D0 1 $ 215-001 $ 185.D0 1 $ 140.001 $ 105.00 1 $ 105.()Ol $ 90.00 Project Project Project Project Sr. CADD Project Principal Manager Manager Englaear Engineer EIT Technician AdndnlIsbator Task Hours Hour Hours Hours Hours Hours Hours Hours Total Labor Hours Total Labor SAM, Inc. Expenses Cost Cost Cost Total Cost Task 1 -Pro ect Management 1-1.1 1Pro'ect Mana ementlAdminislration 1 4 1 6 1 $1 200 $1 200 1.2. Quail Assurence/Quali Control 4 1 4 9860 860 Subtotal Task 1 1 D 8 0 1 0 0 0 1 $2,060 $0.00 $2,060 Task 3 - Phase C - 90% Design Phase 3.1. [survey and Easement Document Prepartion 2 1 8 4 1 11 14 1 $1,970 $18,473.25 $20,443.25 Subtotal Task 3 0 0 2 0 8 0 4 0 14 1,970 18,473.25 20,443.25 Project Totals 1 0 0 a a 0 4 8, 73 25 603 Page D-1 of 1 SUPPLEMENTAL SERVICES Z 1 F; ROUND ROCK TExAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with K Friese & Associates, Inc. for the Sam Bass Road 48-Inch Water Transmission Main Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/S/2021 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $22,503.25 Indexes: Self -Financed Water Construction Attachments: SA2_KFriese_AGMT, CC Map Department: Utilities and Environmental Services Text of Legislative File CM-2021-040 The City of Round Rock's 2015 Water Master Plan identified the need for a 48-inch water transmission main, known as Sam Bass I, and a 42-inch water transmission main, known as Sam Bass II. Sam Bass I extends along Sam Bass Road from FM 1431 to Tonkawa Trail, and Sam Bass 11 extends along Sam Bass Road from Tonkawa Trail to Wyoming Springs Drive. The total anticipated length of the alignment for Sam Bass I and II is approximately 14,000 linear feet. Williamson County is currently under design for a roadway expansion of Sam Bass Road that aligns with the current project limits of the water transmission main project. To minimize construction costs and impact on the local community, the City is proposing to construct the water transmission main with the Williamson County roadway project. On June 19th, K Friese & Associates delivered the Preliminary Engineering Report (PER) for the proposed water transmission main. Based on the PER and the 2020 Water Master Plan, it was determined that the entire water transmission main could be sized as a 42-inch main. On September 24, 2020, the City Council approved Supplemental Professional Services Agreement (PSSA) No. 1 with K Friese and Associates for final engineering design and bidding phase of this water transmission main project. PSSA No. 1 contract value was for $318,092. Supplemental Agreement No. 2 is needed for survey and easement preparation documents for four additional permanent water line easements and the extension of one previously scoped water line easement along Sam Bass Road. This additional easement acquisition is necessary due to Brushy Creek WCID Structural Easement restrictions along the northeast side of Sam Bass Road and the resultant City of Round Rock Page 1 of 2 Agenda Item Summary Continued (CM-2021-040) transmission water main revised alignment. K Friese and Associates PSSA No. 2 is for $22,503.25. Cost: $22,503.25 Source of Funds: Self -Financed Water Construction City of Round Rock page 2 of 2