Loading...
CM-2021-095 - 4/9/2021Page t of 2 -r-P P-F--- - - - - - - —, O1116 Department: Project Name: City Project ID Number Vendor Contract Quantity Adjustment/Change prier Transportation Traffic Signals at Hesters Crossing Rd & La Frontera Blvd Date: 3/17120 Change Order/Quantity Adjustment No. 1 EARTC 14719 US-HWY 290 E Suite 106, Manor, TX 78653 (512) 218-4200 Company Name Address Phone No. ustification Jhile drilling for the south east pole foundation the drill shaft collapsed due to ustable materials used to support other unity lines. These materials were needed to reinWre dr.11 shaft. Ither materials were needed in proving that the if the existing utility pipes cou;d be used for the project. The rest of addition materials are the result of longer than expected nderground runs. SUMMARY Amount % Change Original Contract Price: ;279,280.85 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 1 Total Quantity Adjustment(s). $0.00 I Total Contract Price with Quantity Adjustment(s) $ 279,290.85 - --- Previous Change Order(s): 0% This Change Order: $29,456.97 110/0 Total Change Order(s) To Date: $29,456.97 11% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: ;308,737,82 Difference between Original and Adjusted Contract Prices: $29,456.97 Original Contract Time: -.. . Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quin Adj./Change Order: New Contract Time: 0 _ f!QFARF�.�I Prepared Carlos Reyes, President, EARTC 3117121 _ S Printed Name, Title, Company Date tl Contractor. Carlos Reyes, President, EARTC 3117122 Sign Printed Name, Title, Company Date City Project Nan Manager; Matthew Bhak, P.E., Sr. TEn r � - ew usrans p. 9 . 4/1121 l Mayor/MaQUerty lit7. l<do"4)4 ;nature Printed Name, Title r 1�1 lidt�S t4Ssf C/ Ir'1Q Date Y 1-�a ,,,,,I Sign re Printed Name, TIM6 pate Contract Quantity Adjustment/Change Order Project Name: Traffic Signals at Hesters Crossing Rd & La Frontera Blvd Quan. Adj./Change Order No.: Channe Order Data [tern 0 ITEM NO DESC CODE Item Description Unit QLY. Unit Price Amount Contract Time Adjustment ( Days) 5 416 6032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 5 $350.00 $1,730.00 16 618 6046 CONDT (PVC) (SCH 80) (2") LF 172 $9.00 $1,548.00 18 618 6053 CONDT (PVC) (SCH 80) (3') LF 389 $10.00 $3,890.00 20 618 605E CONDT (PVC) (SCH 80) (4') LF 50 $12.00 $600.00 21 620 6007 ELEC CONDR (NO.8) BARE LF 559 $2.00 $1,116.00 22 620 6009 ELEC CONOR (NO.8) INSULATED LF So$ $2.00 $1,176.00 23 620 6009 ELEC CON DR (NO.6) BARE LF 54 $2.00 $108.00 24 620 6010 ELEC CONDR (NO.B) INSULATED LF 10B $2.00 $216.00 25 621 6002 TRAY CABLE (3 CONDR) (12 AWG) LF 239 $2.00 $478.00 63 684 6031 TRF SIG CBL (TY A)(14 AWG)(5 CONDR) LF 40 $2.50 $100.00 64 684 6033 TRF SIG CBL (TY A)(14 AWG)(7 CONDR) LF 499 $2.80 $1,397.20 65 684 6046 TRF SIG CBL (TY A)(14 AWG)(20 CONDR) LF 247 $4.50 $1,111.50 66 684 6080 TRF SIG CBL (TY A)(14 AWG)(2 CONDR) LF 484 $1.40 $677.60 72 6004 6031 ITS COM CBL (ETHERNET) (CAT-5E) (RADIO) LF 15 $2.80 $42.00 73 6004 6031 6007 ITS COM CBL (ETHERNET) (CAT-6) (PTZ) LF 20 $2.80 $56.00 77 6306 VIVDS CABLING LF 319 $2.68 $854.92 85 OPTICOM CABLE -GTT MODEL 136 LF 56 $2.50 $140.00 a MIA N/A Additional work for steel casing shaft: Drill, Cleanout & Install Permanent Casing 1 - 36' Diameter Pole Holes at a Depth of 13' Down to iB'Steel Casing 38" 0.0 Diameter 3/8" ITHK x 20' = 20 LF 20Mobiilzation InOne (1) Mobilization -Casing & ToolingCut & Modify Casing for Installation LOT 1 $9,843.75 $9,843.75 89 N/A N/A Flowable Fill Concrete CY 5 $120.00 $600.00 Proofing of Intersection (conduits, Cables, 94 N/A N/A and Ground Boxes) RUN 3 $1,000.00 $3,000A0 Mast arm Damper EA i $752.00 $752.00 TOTALS: $29,456.97 0 IEROUND ROOK XA5 City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with EAR Telecommunications, LLC for the Traffic Signal at Hesters Crossing Road & La Frontera Blvd. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/9/2021 Dept Director: Gary Hudder, Transportation Director Cost: $29,456.97 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Co No. 1 Department: Transportation Department Text of Legislative File CM-2022-095 The construction of the traffic signal at Hester's Crossing Rd and La Frontera Blvd is substantially complete, however additional work from the contractor was required due to field unexpected field conditions. The change order adds $29,456.97 to the contract, resulting in an overall project cost of $308,737.82. Even with the additional cost, the project remains a good value for the city as is evidenced by the engineer's opinion of probable cost of $318,000 and a second low bid on the project of $388,559.46 Cost: $19,4S6.97 Source of funds: RR Transportation and Economic Development Corporation (Type B) City of Round Rock Page 1 of 1