Loading...
CM-2021-101 - 4/16/2021STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. I TO CONTRACT FOR ENGINEERING SERVICES FOR 2019 ON -CALL STRUCTURAL ENGINEERING SERVICES WORK AUTHORIZATION FIRM: _BRIDGEFARMER & ASSOCIATES, INC. ("Engineer") ADDRESS: 2350 Valley View Lane Suite 600 Dallas TX 75234 This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Bridgefarmer & Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 25th day of April, 2019 for the 2019 On -Call Structural Engineering Services Project in the amount of $100,000.00; and WHEREAS, it has become necessary to amend the Contract to modify the fee schedule; and WHEREAS, it has become necessary to amend the Contract so that the contract term shall terminate at the close of business day on April 30, 2022; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Exhibit C. Fee Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Article 3, Contract Term shall be amended so that the contract term shall terminate at the close of business day on April 30, 2022. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] em-Z. aZ/- Co I Supplemental Contract 0199.1912,00468847 Rev.06;' 16 84275 BRIDGEF RMER & ASSOCIATES, INC. A4�v By.: 00400. ansoor Ahsan, _ie xecu ive Officer 04-08-2021 Date Supplemental Contract Rev.06116 0199.1912,00468847 84275 CITY OF WUND ROCK APP VED AST FORM: By: 1 Laurie Hadley, Cio Manager V Steph n L. Sheets, City Attorney Date Supplemental Contract Rev.06116 0199 1912,00468847 84275 ADDENDUM TO EXHIBIT C Fee Schedule Attached Behind This Page Exhibit C - Fee Schedule LABOR/STAFF YEARS OF HOURLY HOURLY CLASSIFICATION EXPERIENCE BASE RATE CONTRACT RATE DEPT Principal 10 to 20 $90.00 $270.00 Admin Project Manager 10 to 20 $87.00 $261.00 Design Quality Manager 10 to 20 $77.00 $231.00 Design Senior Engineer 15+ $70.00 $210.00 Design Project Engineer 10 to 15 $64.00 $192.00 Design Design Engineer 5 to 10 $59.00 $177.00 Design Senior Stuctural Engineer 15+ $78.00 $234,00 Design Structural Engineer 5 to 15 $71.00 $213.00 Design Engineer -In -Training 1 to 5 $43.00 $129.00 Design Senior Engineer Tech 15+ $45.00 $135.00 Design Engineer Tech 5 to 15 $31.00 $93.00 Design Junior Engineer Tech 1 to 5 $29.00 $87.00 Design Senior CADD Operator 15+ $47.00 $141.00 Design CADD Operator 5 to 15 $33.00 $99.00 Design Junior CADD Operator 1 to 5 $29.00 $87.00 Design Construction Project Engineer 15+ $67.00 $177.55 Inspection Senior Construction Inspector 15+ $42.00 $111.30 Inspection Construction Inpector III 10 to 15 $36.00 $95.40 Inspection Construction Inpector II 5 to 10 $33.00 $87.45 Inspection Construction Inpector 1 1 to 5 $25.00 $66.25 Inspection Structural Inspector 5+ $39.00 $103.35 Inspection Records Keeper 1 to 5 $39.00 $103.35 Inspection Admin/Clerical 1 to 5 $24.00 $72.00 Admin INDIRECT COST RATE (OFFICE): 172.73% 3.00003 INDIRECT COST RATE (FIELD): 140.91% 2.65001 PROFIT RATE: 10.0% ROUND ROCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supp'emental Contract No. 1 with Bridgefarmer & Associates, Inc. for 2019 On Call Structural Engineering Services Work Authorization. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/16/2021 Dept Director: Gary Hudder, Transportation Director Cost: Indexes: Attachments: SC No. 1 Department: Transportation Department Text of Legislative File CM-2021-101 This item, if approved, will extend the On -Call Contract that was executed in April of 2019. The current contract term is set to expire on April 30, 2021. We are asking to extend the contract one year, changing the termination date to April 30, 2022. This will allow for current Work Authorizations that require work beyond the current termination date to continue. Future Work Authorizations under the 2019 On -Call contracts will be scheduled to be complete by the proposed termination date. Transportation is currently working on a new Request for Qualifications for On -Call services. The process is expected to be complete by the end of the fiscal year so the City has the ability to execute future Work Authorizations that would extend past the proposed April 30, 2022 of the 2019 On -Call contracts. City of Round Rock page 1 of 1