R-2021-104 - 4/22/2021 RESOLUTION NO. R-2021-104
WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering
Services("Contract') with Rodriguez Transportation Group, Inc. for the Gattis School Road (Segment
3) Project, and
WHEREAS, Rodriguez Transportation Group, Inc. has submitted Supplemental Contract No.
4 to the Contract to modify the provisions for the scope of services and to increase the compensation,
and
WHEREAS, the City Council desires to enter into said Supplemental Contract No. 4 with
Rodriguez Transportation Group, Inc.,Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental
Contract No. 4 to the Contract with Rodriguez Transportation Group, Inc., a copy of same being
attached hereto as Exhibit"A"and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 22nd day of April, 2021.
C RG , Mayor
City o Round Wck, Texas
ATTEST:
('Am la VVA
MEAGAN LV
D INKS, puty Ci lerk
0112.20212;00469422
EXHIBIT
„A►,
STATE OF TEXAS §
COUNTY OF WILLIAMSON §
SUPPLEMENTAL CONTRACT NO.4
TO CONTRACT FOR ENGINEERING SERVICES
FIRM: RODRIGUEZ TRANSPORTATION GROUP,INC. ("Engineer")
ADDRESS: 11211 Taylor Draper Lane,Suite 100,Austin,TX 78759
PROJECT: Gattis School Road (Segment 3)
This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between
the City of Round Rock, Texas, hereinafter called the "City" and Rodriguez Transportation
Group, Inc., hereinafter called the"Engineer".
WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract", on the 22nd day of March, 2018 for the Gattis School Road (Segment 3)
Project in the amount of$1,013,037.45; and
WHEREAS,the City and Engineer executed Supplemental Contract No. I on February 14, 2019
to amend the scope of services and to increase the compensation by $117,447.94 to a total of
$1,130,485.39; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on August 22, 2019
to amend the scope of services and to increase the compensation by $89,780.42 to a total of
$1,220,265.81; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on November 12,
2020 to amend the scope of services and to increase the compensation by$52,865.48 to a total of
$1,273,131.29; and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for the
scope of services and to increase the compensation by$78,587.78 to a total of$1,351,719.07;
NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract
is amended as follows:
I.
Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set
forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set
forth in the attached Addendum to Exhibit C.
Supplemental Contract Rev.06/16
0199.1770;00468528 84275
1
Il.
Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by
$78,587.78 the lump sum amount payable under the Contract for a total of $1,351,719.07, as
shown by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental
Contract in duplicate.
[signature pages follow]
Supplemental Contract Rev.06/16
0199.1770;00468528 84275
2
RODRIGUEZ TRANSPORTATION GROUP, INC.
By:
.►s S/ '
p �d/A
Date
Supplemental Contract Rev.06/16
0199.1770;00468528 84275
3
CITY OF ROUND ROCK APPROVED AS TO FORM:
By:
Craig Morgan,Mayor Stephan L. Sheets,City Attorney
Date
Supplemental Contract Rev.06/16
0199.1770;00468528 84275
4
ADDENDUM TO EXHIBIT B
Engineering Services
The additional Scope of Work to be performed by the Engineer under this Supplemental Contract
is described as follows:
• Additional Roadway Design Services to add the reconstruction of E. Rock Cove to the
plan set. The addition of E. Rock Cove does not include services related to traffic
control, drainage, survey, ROW or environmental unless otherwise noted below.
• Additional Roadway Design Services to update the design(as needed)to address changes
resulting from revisions to proposed drainage system resulting from Atlas 14.
• Additional Drainage Design Services to update design to reflect Atlas 14 precipitation
data.
• Additional Illumination Design Services to help resolve utility conflicts.
• Additional Utility coordination required to review relocation plans provided by utility
providers and to develop a DGN file that represents utility locations prior to roadway
construction activities(ex. all existing utilities to remain and all relocated utilities.)
FC 140—Project Management and Administration
A. The Engineer shall continue to manage the project by preparing invoices,maintaining the
project files and work schedule, and continuing to coordinate with City Staff and their
representatives for the extended duration of the project(ex. 12 additional months).
FC 160—Roadway Design
A. Roadway Plans
1. The Engineer shall update existing sheets impacted by the addition of E. Rock Cove
reconstruction to the plan set. Existing sheets include: Index, Project Layout,
Typical Section Pavement Details, Summary Sheets,Narrative Sequence of
Construction, Horizontal Alignment Data Sheet, E. Rock Cove P&P, SW3P.
2. The Engineer shall develop new sheets impacted by the addition of E. Rock Cove
reconstruction to the plan set. New sheets include: Typical Section, Plan Layout, and
Erosion Control Plan sheet.
3. The Engineer shall update the design of various roadway plan sheets(10 max.)as
needed to reflect changes made to the proposed drainage systems resulting from Atlas
14. The 10 sheets requiring revisions may include: TCP and Roadway Sheets.
FC 161 —Drainage
A. The Engineer shall update the Drainage Report to reflect to reflect hydrologic
computations using Atlas 14 precipitation depths. Hydraulic computations for existing
and proposed structures will be revised to account for peak flow rates calculated with
Atlas 14 precipitation depths. Results to be tabulated and report documentation to be
updated for the latest calculations.
B. Culvert and Storm Drain Design
1. The Engineer shall revise Rational Method and Hydrograph calculations to reflect
Atlas 14 precipitation depths. HY-8 and GEOPAK Drainage models will be revised
for the new peak flow rates. Inlet calculations will be modified and if necessary,
1
additional inlets will be added to ensure ponding width is not exceeded during the
design event.
2. The Engineer shall modify hydraulic calculations using HY-8 and GEOPAK
Drainage models for the new peak flow rates. Inlet calculations will be modified and
if necessary, additional inlets will be added to ensure ponding width is not exceeded
during the design event. On-site drainage area maps and storm profiles will be
modified for the revised design. No off-site storm drain improvements are included
with this task.
3. The Engineer shall modify the erosion control layouts to reflect additional curb inlets
required to address the Atlas 14 precipitation depths.
C. Culvert Layouts
1. The Engineer shall revise the culvert layouts to address the increased peak flow rates
from the Atlas 14 precipitation depths.
2. The Engineer shall revise the culvert design, as necessary, to ensure that the proposed
culverts convey the new Atlas 14 design event with no overtopping of the proposed
roadway.
FC 162—Signing,Pavement Markings, Signals and Illumination
A. Utility Coordination
1. The Engineer shall update the Illumination Plan Layout, as needed,to help resolve
proposed utility related conflicts. Remaining utilities that have not been cleared
include: Atmos,AT&T, Grande, and Zayo.
FC 163—Miscellaneous
A. Utility Coordination
1. The Engineer shall continue to coordinate required relocations with each utility
provider. Coordination efforts includes: reviewing relocation plans and issuing
comments and working with the providers to address questions, gather relocation
schedule information, etc. Continued coordination effort is expected for the
following providers: Atmos, AT&T, Charter/Spectrum, Oncor, Grande, and Zayo.
2. Develop a Microstation reference file (DGN) that represents anticipated utility
locations prior to roadway construction activities. The file will be based on relocation
information provided by the utility providers and existing utilities to remain; all
compiled into a single file.
2
Addlmdum to Exhibit C-Work Sch.duN
as m nk N.me Dunon i%an ',mm— ,.. .. +�uqp s.,o.ps, +•�Ro.�n�D.c2•Ira n.'.w s',dq ,N.�,•fill<,9Mn�9lua>s•f�q,Mwef nwk.�,•,d«�p',3,. R..,.xl.sli y,pWgF a a„r,.b. �.. 9.W dye w n M W qua vise ,N,.,, i.•L
_.._.. ` __ _ __ i�,iIj vxs If16f1a1ta11Lii1�111i1J1:1a1-xl,ojl5.Y12SI P IMla iil1112f:_i�121 6 1111-i �SIjl�2lj �29�S.11p1.f j19j21 �fl el2�ll2il,�1.f 16131�115�1117i.1,1f111hi1.111SlAi151f0(Hj191vI1fl�1ijflajlj[i lll.t
g% Initial Submittal(0eometrk schematicl UO days Sun 4/1/U IFri 8/17/18 r 1 InHlal sue�'nYiP+110w�l,wrk-t11121-1 3
2 I Notice to Proceeds 1 day Sun 4/1/18 Sun 4/1/18
at, Data Collect on&Fields Reconnaissance 15 days Mon 4/2/18 Fn 4/20/18 amlim PM fler,cetkn&Field Fusion--
r Ri,g of Entry Coordinator 15 days on 4/9/18 In 4/21/18 iomamm.tbol of In"C—dmaden
S -4 Design Conrept Conference(w/DSF) 3 days Thu 4/26/29 Mon 4/30/18 {.pe.igo Concept ConMw,oe Iw/DS9
fi -% I't t Project Control 5 days Mon 4/23/13 Fri 4/27/18 lnikak Prejecl<ontW
7 +4 H&H St des 27 days Thu 5/3/IB Fri 6/8128 M•H.H Swd,n
9 4 E nt Data Collect on 15(Lay, Tue 5/1/3B Mon 5/21/18 gnvlm-merit D..Cellea Ion
Geotechncal lnyestlgatlan 45 days Tue 5/1/18 Mon 7/2/18 peassessessessayGa-tu.iW l-ve+tlp+tlen
is a Survey IDesiin Surveys) 25 days Mon 4/30/18 F.6/1118 mS.—(ba.ign Seney+)
tt preliminary Roatlway Geometry/Design Cross Sections 15 days Mon b/4/IB fn6/22/38 1y—Preliminary Rwdway Geometry/Design C.oz S«Ikv
ti sag Preliminary Storm Drain Design 20 tlays Mon 6/11/18 Fri 7/6118 -11�Preiminary—Drain no.
13 Fill. minary Utility Conflict Determ nation S days on 7/9/18 Fri 7/13/1 �FR PMim rury unliry conflict--non
14 Develop sepuence of Construction Layout 10 days Mon 6/25/18 Fri 7/6118 pev lap test el Comlmceon rave-)
15 P Fminary Geamettc Schematic 10 days Mon 7/9/18 Fn 7/20/18 Peg eometnc schemer'
1fi r. Instal Submntal(QAQC) 5 days Mon 7/23/18 Fri 7/27/18 the 1- I Submnl+l(Qa(ICI
nInitial Subm ttal 0 days Fri 8/3118 Fri 8/3/18 8/i,e 1 N l Submihal
to . City of Round Rock Review Period 10 days Mon 8/6/Is Fn 8/17/18 y�City of Round pock R.—Perini1st30%Submi"W(Gay—bric SchllnMic/ROW L-1 71 days Most 8/U/12 Man 11/26/19 I"�1 3-subnitW lOwmatdc Schematk/ROW U.01)
M r. Property Owners Meeting al 5days Mon 9/3/18 F.9/7/18 se pi_p Ownan Meeang vt
Rrview/Address Aeyiew Comments 10 days Mon 8/20/18 F.8/31/18 —Review7Add,ea Revew Comments
+ei Environmental Oocument/Tschmcel Reports 20 days Fri 9/14/U Fri 10/12119 -----r)_sEmironmantal DacuminUT-hnkel Repern
Pre-Final Geometric Schematic Sdays fri 10/12/18 Thu 10/18/18 t it ji—Finel 4amnari,ScMm+tk
Publk Meeting Ill 5days Tue 10/23/18 Mon 10/29/18 ubBcMMinq el
S 30%Submittal(QAQQ 5days Tue 10/30/29 Mon 11/5/18 ox SU:m:Y pAQq
an e 30%Submittal 0day, Mon 11/22/18 Mon 11/12/18 11/1 ID%SubndNJ
City MRounit Rock Review Periods 10 days Tue 11/13/18 Mon 11/26/18 Ily of Round pock R.vkw Period
60%Submi"JPS&EI 65 days Tans11/27/U RRm 2/25/19 1"�1 60%Subndllal lPS&EI
se. Property Owners Meeting a211f Applicable) 5days Tue 12/4/18 Mon 12/10/18 ._empany Owners M«tlnq allN AppBcabkl
gee Review/Atldress Review Comments 5days Tue 11/27/18 Mon 12/3/18 Addro+Rwiew Comments
sit Final Rion-,(Env.,Drng,Geo.) 5days Tue 11/27/19 Mon 12/3/18 n.l RePorr+IEnv.,Dmq,Gw.)
Utility Coordination Meetings 30 days Tue 12/4/18 Mon 1/14/19 Utility CeeMiiurkn Meeting+
Is an. Final Geometric Schematic 5 days Tue 12/18/19 Mon 12/24/18 final Geemrrdc schematic
S Begin 60%Decided Design(Plan Sheets) 45 days Tue 12/4/18 Mon 2/4/19 9egin sax D.MIIN—on(Ften sb—,)
+C Pubk Meeting R2(if Applicable) 5 days Tue 12/25/18 Mon 12/31/18 Meetirp#2 IN APPI-I,k)
4 to%Subibittal(QAQC) 5days Tue 2/5119 Mon 2/11/19 +IM.fq%Sibmine11-ths)
l7 at 60%Submittal 0days Mon 2111/19 Mon 2111/19 11' — 0%sub,-"uA
3B at City of Round Rock Review Period 10 days Tue 2/12119 Mon 2/25/19 �'ey of Roma Rad,Review Pmodof Roush Rock R.New Pmod
90%SubmMal(PS&E) 221 days Ties,1/1/19 Tue 11/S/19 /�90x S,lmItW lPsedl
46 . A.W.Grimes Suppl—rill Sulwy—SUE(SWAa1) 30 days Tue 1/1/19 Mon 2/11/19 .W.Gmm�seppkmre,ld Survey end SUE ISWA+1)
Supplement-1,AutMru -n Na.215WAa2) 04ays on 7/21/19 Mon 7/29/19 7/29 Supplwnw,t Wak AuModralloe he(SWAv2)
Willy Park Supplemental Survey and SUE(SWA421 30d., Mon 7/29/19 Fri 916/19 YORd/,1-suppkmmad Survey ands SUE SWAa2)
n Aeyiew/Atldress Review Comments 5days Tue 2/26/19 Mon 314/19 --Is view/Adan-sti—iew Comments
Y Continue 901s Detailed Design(Plan Sheets) 50 days Wed 7/31/19 Tue 1018/19 - a�F�entlnue 90x--i1-Dwgn(%en SMan1 i '
45 Its �. Utility Coordination Meetings 75 days Mon 5/20119 Fn 8/30/19 —Utlllly t1 rdkutlon M«II-y
S Supporting Documents(Estimate,GN,Construction 15 days Wed 9/18/19 Tue 10/8/19 eaa�sygapioie,Documents(Estim+M,GN,Comm--S—k)
Schedule)
41 90%Submlttal(QAQC) 10 days Wed 10/9/19 Tue 10/22/19 IRa�90%Submind(QAQE)
Is S Goss Submittal 0days Tue 10/12/19 Tue 10/22/19 10/2 9D%Subminel
sal city of Round Rock Review Period 10 days Wed 10/23/19 Tue 1V5119 Gry of ImuM Red,Review Period
SO +1 Pre-FWlSubminal"&E) 22 dayI Men 18/5/20 Tue 11/3/10 r1 Pre-Final Subninal W',w)
I �. Pre-Fin al Submittal lQAQQ to days' Mon 10/5/20 Fri 10/16/2D a.Pre�N-al subminal IQAQC1
s Pre-Final Submittal 2less on NA9/20 Tue 10/20/20 tla suls.-
11
City ofRound Rock Review Period lode s Wed 10/22/20 Tue 1113120 of Rou-d R-1,Review P...itRou,.d 1-1,pewvw P...it
14 FMM SubmNUl(PAII 176 days Wed 12/2/20 Wed 8/4/21 nuatly-sun
n-a-l—E)
11 Supplemental Work Authorisation his.4(SWAR4) Ides Mon4/19/11 Mon 4/19/21 Suppkmmvl Work AuMsrkatlen No.41SWAv41
Utility Coordination Meetings 150 days Wed 12/2120 Tins 6/29121 ulility Coerdi....Mesungs
11 ass Update Design(E.Rock Cow and Atlas 14) 30 days Thu 4/22/21 Wed 6/2121 I•♦ Upd+la Design lt.R«k C..end A-14)
Aeyiew/Atldress Review Comments 10 days Thu 6/3/21 Wed 6/26/21 ,-- ___—.. ♦ .Ravi../Add—sa—Comments
+6 finalix Deviled Design(Plan Sheets) 10 days Thu 7/t/21 Wetl]/21/21 - .FkaO=e DevRed Desist-(Mn Sheets)
4 Finalife Supporting Documen.(E.male,GN, 5days Thu 7122/21 Wed 7/28/21 o1, fins..Suppeitk,g Documents
Construction Schedule) f
Final Submittal JCAQCI 5days Thu 7/29/21 Wed 8/4121 final 5ubminal lQAQQ
4 Final Sub mRvl 0days Wed e/4/21 Wed 9/4/21 e/4N-Nisi SubinNtM
Rodriguez Transporti-n Group,Inc. ,k wm.,.y cored
Gatlis School Road(Segment 3)
Dart.;Wed 3/24/21
Page I
Addendum to Exhibit D
Fee Schedule
RODRIGUEZ TRANSPORTATION GROUP,Inc. City of Round Rock
Estimate of Engineering Services Budget Gattis School Road(Segment 3)
RODRIGUEZ CORSAIR COXIMcLAIN HDR INLAND K FRIESE NANCY LEDBETTER
TASK TRANSPORTATION CONSULTING ENV.CONSULTING ENGINEERING GEODETICS &ASSOCIATES a ASSOCIATES TOTAL
GROUP,INC. LLC INC. INC. LLC INC. INC. COST
FC 110 Route and Design Studies;Geotechnical Investigation $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0,00 $0,00
FC 120 Environmental Documentation $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0,00
FC 130 ROW Data/Utilities $0,00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00
FC 140 Project Management and Administration $5,099.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5,099.04
FC 150 Field Surveying and Photogrammetry $0,00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00
FC 160 Roadway Design $16,288.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $16,288.60
FC 161 Drainage $31,347.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $31,347.98
FC 162 Signing,Pavement Markings,Signals and Illumination $0,00 $0.00 $0.00 $5,456.00 $0.00 $0,00 $0.00 $5,456.00
FC 163 Miscellaneous $20,396.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20,396.16
Subtotal-Labor $ 73,131.78 $ $ $ 5,456.00 $ - $ - $ - $ 78,587.78
Subtotal-Other Direct Expenses(Cardno) $0.00 $ - $ $ $ - $ $ $0.00
GRAND TOTAL $ 73,131.78 $ - $ - $ 5,456.00 $ - $ - $ - $ 78,587.78