Loading...
Contract - Rodriguez Transportation - 4/22/2021 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: RODRIGUEZ TRANSPORTATION GROUP, INC. ("Engineer") ADDRESS: 11211 Taylor Draper Lane, Suite 100,Austin,TX 78759 PROJECT: Gattis School Road (Segment 3) This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Rodriguez Transportation Group, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 22nd day of March, 2018 for the Gattis School Road (Segment 3) Project in the amount of$1,013,037.45; and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on February 14, 2019 to amend the scope of services and to increase the compensation by $117,447.94 to a total of $1,130,485.39; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on August 22, 2019 to amend the scope of services and to increase the compensation by $89,780.42 to a total of $1,220,265.81; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on November 12, 2020 to amend the scope of services and to increase the compensation by $52,865.48 to a total of $1,273,131.29; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $78,587.78 to a total of$1,351,719.07; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Supplemental Contract Rev.06/16 0199.1770;00468528 84275 R-2o21 � l� 1 II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $78,587.78 the lump sum amount payable under the Contract for a total of $1,351,719.07, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0 199.1770;00468528 84275 2 ' RODRIGUEZ TRANSPORTATION GROUP, INC. By: Date Supplemental Contract Rev.06/16 0199.1770;00468528 84275 3 CITY OF KND ROCK APPR VED AS TO F RM: By: - N I Craig Mo an 1\94ayor Stephan . Sheets, City Attorney 41 Date Supplemental Contract Rev.06/16 0199.1770;00468528 84275 4 ADDENDUM TO EXHIBIT B Engineering Services The additional Scope of Work to be performed by the Engineer under this Supplemental Contract is described as follows: • Additional Roadway Design Services to add the reconstruction of E. Rock Cove to the plan set. The addition of E. Rock Cove does not include services related to traffic control, drainage, survey, ROW or environmental unless otherwise noted below. • Additional Roadway Design Services to update the design(as needed) to address changes resulting from revisions to proposed drainage system resulting from Atlas 14. • Additional Drainage Design Services to update design to reflect Atlas 14 precipitation data. • Additional Illumination Design Services to help resolve utility conflicts. • Additional Utility coordination required to review relocation plans provided by utility providers and to develop a DGN file that represents utility locations prior to roadway construction activities (ex. all existing utilities to remain and all relocated utilities.) FC 140—Project Management and Administration A. The Engineer shall continue to manage the project by preparing invoices, maintaining the project files and work schedule, and continuing to coordinate with City Staff and their representatives for the extended duration of the project (ex. 12 additional months). FC 160—Roadway Design A. Roadway Plans I. The Engineer shall update existing sheets impacted by the addition of E. Rock Cove reconstruction to the plan set. Existing sheets include: Index, Project Layout, Typical Section Pavement Details, Summary Sheets,Narrative Sequence of Construction, Horizontal Alignment Data Sheet, E. Rock Cove P&P, SW3P. 2. The Engineer shall develop new sheets impacted by the addition of E. Rock Cove reconstruction to the plan set. New sheets include: Typical Section, Plan Layout, and Erosion Control Plan sheet. 3. The Engineer shall update the design of various roadway plan sheets (10 max.) as needed to reflect changes made to the proposed drainage systems resulting from Atlas 14. The 10 sheets requiring revisions may include: TCP and Roadway Sheets. FC 161 —Drainage A. The Engineer shall update the Drainage Report to reflect to reflect hydrologic computations using Atlas 14 precipitation depths. Hydraulic computations for existing and proposed structures will be revised to account for peak flow rates calculated with Atlas 14 precipitation depths. Results to be tabulated and report documentation to be updated for the latest calculations. B. Culvert and Storm Drain Design 1. The Engineer shall revise Rational Method and Hydrograph calculations to reflect Atlas 14 precipitation depths. HY-8 and GEOPAK Drainage models will be revised for the new peak flow rates. Inlet calculations will be modified and if necessary, 1 additional inlets will be added to ensure ponding width is not exceeded during the design event. 2. The Engineer shall modify hydraulic calculations using HY-8 and GEOPAK Drainage models for the new peak flow rates. Inlet calculations will be modified and if necessary, additional inlets will be added to ensure ponding width is not exceeded during the design event. On-site drainage area maps and storm profiles will be modified for the revised design. No off-site storm drain improvements are included with this task. 3. The Engineer shall modify the erosion control layouts to reflect additional curb inlets required to address the Atlas 14 precipitation depths. C. Culvert Layouts I. The Engineer shall revise the culvert layouts to address the increased peak flow rates from the Atlas 14 precipitation depths. 2. The Engineer shall revise the culvert design, as necessary,to ensure that the proposed culverts convey the new Atlas 14 design event with no overtopping of the proposed roadway. FC 162—Signing, Pavement Markings, Signals and Illumination A. Utility Coordination 1. The Engineer shall update the Illumination Plan Layout, as needed, to help resolve proposed utility related conflicts. Remaining utilities that have not been cleared include: Atmos, AT&T, Grande, and Zayo. FC 163—Miscellaneous A. Utility Coordination 1. The Engineer shall continue to coordinate required relocations with each utility provider. Coordination efforts includes: reviewing relocation plans and issuing comments and working with the providers to address questions, gather relocation schedule information, etc. Continued coordination effort is expected for the following providers: Atmos, AT&T, Charter/Spectrum, Oncor, Grande, and Zayo. 2. Develop a Microstation reference file (DGN) that represents anticipated utility locations prior to roadway construction activities. The file will be based on relocation information provided by the utility providers and existing utilities to remain; all compiled into a single file. 2 Addendum to Exhibit D Fee Schedule RODRIGUEZ TRANSPORTATION GROUP,Inc. City of Round Rock Estimate of Engineering Services Budget Gattis School Road(Segment 3) RODRIGUEZ CORSAIR COXIMcLAIN HDR INLAND K FRIESE NANCY LEDBETTER TASK TRANSPORTATION CONSULTING ENV.CONSULTING ENGINEERING GEODETICS &ASSOCIATES &ASSOCIATES TOTAL GROUP,INC. LLC INC. INC. LLC INC. INC. COST FC 110 Route and Design Studies;Geotechnical Investigation $0.00 $&00 $0.00 $0.00 $0,00 $0,00 $0.00 $0.00 FC 120 Environmental Documentation $0.00 $0.00 $0,00 $0,00 $0,00 $0,00 $0.00 $0.00 FC 130 ROW Data/Utilities $0,00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 FC 140 Project Management and Administration $5,099.04 $0.00 $0.00 $&00 $0.00 $0.00 $0.00 $5,099.04 FC 150 Field Surveying and Photogrammetry $0.00 $0,00 $0,00 $0.00 $0.00 $0.00 $0.00 $0,00 FC 160 Roadway Design $16,288.60 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $16,288.60 FC 161 Drainage $31,347,98 $0,00 $0.00 $0.00 $0.00 $0,00 $0.00 $31,347.98 FC 162 Signing,Pavement Markings,Signals and Illumination $0.00 $0.00 $0,00 $5,456.00 $0,00 $0.00 $0.00 $5,456,00 FC 163 Miscellaneous $20,396.16 $0.00 $0.00 $0.00 $0,00 $0.00 $0,00 $20,396.16 Subtotal-Labor $ 73,131.78 $ - $ - $ 5,456.00 $ - $ - $ - $ 78,587.78 Subtotal-Other Direct Expenses(Cardno) $0.00 $ - $ - $ - $ - $ - $ - $0.00 GRAND TOTAL $ 73,131.78 $ $ - $ 5,456.00 $ - $ - $ - $ 78,587.78 Adderidurn to Bddblt C-Work Scheduk4 b +^. -,� 'm+P y,,. �r.A,{p 1•Mia �aa t,R]f.'Nwl',�,< 20rei 1.NPr x'wrrs�• lgbp s�pni4'Nw 11 MI'> >1lp�i T„k Na,w a„�wi. sl., h^,n } g�al, 'In�;:ii,i„Inl� lfi,r,i.'Igl„I:.I Qja,Fin��n la:I�,Ixjwa�;I2;i2eLs.lznlalnlaLil.r 1u1c1ut2U2La l:,lal, :I:e�2R,e.s�a a I Izlul:.l s .s...2 1.LLssLillslglialm(islnlu�ulu�nlulollzlnl1i InBEaI Subraimil(Gearnetrk Schema IN gains San 4/1/1e En 8/17/18 Nona!to Proceed 1 day sun 4/1/28 Sun 6/1/18 Data Collection a Field Reconnaissance, 15 drys on 4/2/28 1114/20/18 I FIaes Pas+CORlnion 6.led R«onnanMnu Right of Entry Coordination 15 drys on 4/9/28 Fn4/27/1B �sagggsi of snq coxdmanon es. Design Concep /0 t Conference(w5F) 3days Thu 4/26/19 Mon 4/30/18 �D«i9^Cox.p,conl•rw,u(w/us F) as. Initiate Project Control 5days Mon 4/23/29 Fri 4/27/18 JnnnN Proles co 1 4 H 8 H Studies 27 days Thu 5/3/18 Fri 6/8/I8 J H h N 5ba•s aai Environment Data Collection 15 it., Tue 5/1/I8 Mon S/21/18 Envirenmm,Data Coll•<,ien Geotechniul investigation 45 days Tue 5/1/18 Mon 7/2/18 •<niul Nv,apapo� Survey IDeugn Suyepl 25 days Mon 4/30/18 Fri 6/1/I9 S.—ID•aign Sgn•ysl Preliminary Roadway Geometry/Desgn Cross Sections 15 days Mon 6/4/19 Fri 6/22/1, 4�lre8min+ry Ro+dw•y Geometry/Design Cron se„un, 4 Prehminary Storm Drain Desgn 20 days Mon 6/11/18 Fri 7/6/18 inary sto,m Drain D«kgn --- eq Prehminary Utility Conflict Determination 5tlays Mon 7/9/18 Fri 7/13/18 hNimie.ry_sF,ConN<,DeN+m,nanon -- ase. Devebp Sequence of Construction layout 10 days Mon 6/2SAS Fri 7/6/18 se9uerce of Com,n<oon tay , 11 se. Preliminary GeomatrR Sch...tk 10 it., Mon 7/9/18 F.7/20/18 refm.,ay GMlneln<S<hnrusk Inanal S.WuUal(OAQC) 5days Mon 7/23/28 Fri 7/27/18 SnbmnJ(OAOCI 17 an Initial Submittal 0day, Fri 8/3/18 F.8/3/18 e" SPlsmiwl 4 City of Round Rack Review Period 10 days Mon 9/6/19 Fri 9/27/18 y of Round R«k ke,,.Pend aS 311 Su se tN(Geaeetrlc k1ureo tk/ROW llln%al ridm Mon 2/20/28 Klan 11/26/18 sox submnW lLwm.,n<s<n•mJi</Row limn+) S Property Owners Meeting Ol 5days Mon 9/3/18 Fn 9/7/18 p•.ry os n•n MI—,.1 Rewew/AOdress Review Comments 10 drys Mon 8/20/18 Fn 9/31/18 Aevia'•/Aaa.ms Re++ew<ammenb a1 Environmental Chicuminl/Tachnual st"ns 20 days Fri 9/14/18 Fn 10/12/18 Eaagaeafnvi.onm.nsal Dxumen,rte<hnnal Raporo an Pre-Final Geometric Schematic 5tlays Fri 10/12/18 Thu 10/18/18 tiI.•-Final Wam•,ri<idwm+oc Public Meeting el 5days Tue 10/23/18 Mon 10/29/18 M Pub0,M•etinp al S 30%S.1-dual(QAQQ 5days Tue 10/30/18 Mon 11/5/18 ass,j0%submisW ati-CI 21 30%S,turdtal 0day, Mon 11/12/12 Mon 11/12/18 11/12 30x Submwl 17 City of Round Rock Revew Period 10 dep Tue 11113/18 Mon 11/26/19 flh If Reund Rock R«kw Period 60%S.tasuml IPSLEI 65 am Tug,11/27/18 Man 2/25/19 Submtbl 1-11 4 propeM Usvners Meeting R2 lit Applicable) 5days Tue 12/4/18 Mon 12/10/18 (ae-Pmp•rry 0.rn•n Me•bn9 a2(Il Apphubl•1 la S Review/Address Review Comments 5 days Tue 13/27/13 Mon 12/3/18 /Ad,ns R«i•N Cnmm•nu R Final Reports 1.,,,Ding,Get.) 5 drys Tue 12/27/18 Man 1213/18 �InJ Raanro IFnv.Dmq.Leo.) 32 Utiliry Coordination Meetings 30dm Tue 12/4/18 Mon 1/14/19 In,Ceordkuslen M•<nnga 11 Final Geometrk Schematic 5dm Tue 12/19/18 Mon 12/24/18 nJ Leome,n<5<nema,i, an Begin EA%DelaAed Design(Plan Sheets) 45 days Tue 12/4/18 Man 2/4/19 1—60%wwlN Den9n(Plan sheen) �. Pubh<Mrelin,e2(1f Applcable) 5tlays Tue 12/25/19 Mon 12/31/18 ne Pubs,uee,inq r2 IN Apphubkl bo IE mirtal lQAQC) 5da0 Tue 2/5/19 Man 2/I1/19 x suit—I(QUOC) 7 an 60aA 5ubnittal 0days Mon2/11/19 Mon 2/12/19 2/bw cox suermwl . City of Round Rock Review Period 10 dap Tue 2/22/29 Mon 2/25/19 aw Cny of Roud Rock R•waw vend ase 90%SubnlnJ(PULEI 121 din Test 1/1119 Tsaa 11/5 /19 90x Subm)ttJ IPse�sl AW.Grimes Suppi<menbl Survey ad SUE ISAAC) 30 dap Tue 1/1129 Man 2/11/19 I.—Iced 91IE cassi w 3 4n Supplement Wank autra,-Ion No.2(3WAe2) 0da Mon7/29/19 Mon 7/29/19 1121�Suppl—Wary A,Me.iaauon No 2(6WAa2) aS Willy Park Supo—snal Surrey all SUE(SWAR2) sodas, Man 7129/19 Fri 9/6/19 6upP4 tal Survey and SU E 1SWA.y2) 4 Review/Address Review Comments 5dap Tue 2/26/19 Mon 314/11 IeR«nw/AddnssR«few Commenn I see Continue 90%Deteiled Design(Plan Sheets) wdays Wed 7/31/19 Tue 1019/19 a n.u•90%wor D•eir.Fla.sheen)) 3 . Unit,Coordination Meetings 75 dap Mon S/20/19 in 8/30/1, Untly Co dlnasion M 11b R supporting Dotu—st(E,onsete,GN,Constructbn 15 de,,, Wed 9118/19 Tue 1018/19 —gap,.,D^um•nn ls,bmat•,LN.Com,ruaon s<hdub) ' Schedule) 2 90%Submittal PACE) 10 dap Wed 1019/19 Tue 10/22/19 sees Sub—A(QAOc) 9(%Submtttal 0dars Tue 10/22/19 Tue 10122,11 IORdal.9ox Subminal en Cory of Round Rock Review Period 10 dap Wed 10/23/19 Tue 11/5/19 Dry of Roud Pod wview 1—d t R PrtEhW SUMnhdJ(aSaE) 22 depi Min 10/S/20 Te I.N. r---1-Final I—— �. Pre-final Submittal(QAQC) to dap? Man 10/S/20 Fri 10/16/20 Pn-NnJ Submmal IDADQ Pre-Final$ubmRbl i days Mon 10/29/20 Tue 10/20/20 •Pre-FinJ Submmal City of Round Rock Review Period lochs, Wed 30/21/20 Tw s113/20 a�Chy of Reund Rxk K..Pend FFWSubmutal liesii 176 din Wed 12/2/20 Wed 5/4/21 F^Wsuti—AIP-E) 11 /F S."Plemened Work Audi—cetlon Nq.A(SWAM) Idey M114/19/21 w.4/19/21 Suppkmen,J Woh AWnarkabsn No.I(SWAa4) UUIuV Coordination Meetings 150dap Wed 12/2/20 Tue 6/29/21 uUbsy Coordinasnn M»bngt 11 an Update Des,2n(E.Ruck Cove and Atlas 14) 3D dap Thu4/22/21 Wed 6/2/21 • ,•Dwpn It.Rock C«e+etl AW,Is) .M . Review/Address Review Comments 10 dap Thu 6/3/21 Wed 6/16121 •UP_./Add.«s Its—w Comm— 59 4 -aloe Detailed Desgn IPIan Sheets) 10 dap Thu 7/8/21 Wed 7/21/21 I. finu ae Debited DeJ9n(Plan Shaw) s^ a4 Fink.Supporting Docoments(Estimate,GN, 5tlap Thu 7/22/21 Wed 7/28/21 • Firw1G•Suppo ,Do,umenh(EJI Construction Schedule) Fi sal Submittal)MQC) 5 days Thu 7/29121 Wed 8/4/23 ♦final suemiwl tQAQQ Final Submittal Edays Wed 8 /4/21 Wed 8/4/21 8/4H Fbwliubmnt•I Rodriguez Transportion Group,Inc Gattis School Road(Segment 3) Date:Wed 3/24/21 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 0f 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2021-730660 Rodriguez Transportation Group, Inc. Austin,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 03/25/2021 being filed. City of Round Rock,Texas Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 0199.1770;00395816 Gattis School Road(Segment 3) Professional Services in the Form of Roadway Design Services Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Rodriguez, Mark Austin,TX United States X Enns, Brian Dallas,TX United States X Davidson, Steven Austin,TX United States X Tomescu,Chris Austin,TX United States X Robbins, Robert Frisco,TX United States X Sharma, Subrat Boerne,TX United States X Carrillo, Robert Austin,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is Steven F Davidson and my date of birth is My address is 11211 Taylor Draper Ln Ste 100 Austin TX 78759 USA (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in Travis County, State of Texas on the 25 day of March 2021 (month) (year) Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.1.ceffd98a CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2021-730660 Rodriguez Transportation Group, Inc. Austin,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 03/25/2021 being filed. City of Round Rock, Texas Date Acknowledged: 04/08/2021 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 0199.1770;00395816 Gattis School Road (Segment 3) Professional Services in the Form of Roadway Design Services Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Rodriguez, Mark Austin,TX United States X Enns, Brian Dallas,TX United States X Davidson, Steven Austin, TX United States X Tomescu, Chris Austin,TX United States X Robbins, Robert Frisco,TX United States X Sharma, Subrat Boerne,TX United States X Carrillo, Robert Austin, TX United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is and my date of birth is My address is (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in County, State of on the day of ,20 (month) (year) Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.1.ceffd98a