CM-2021-116 - 4/23/2021Page I of 4 ROUN0110CN s' •n rev. 01/16 Department: Project Name: City Project ID Number Vendor ]ustification Contract Quantity Adjustment/ Change Order Utilities & Environmental Services Lake Georgetown Chemical Feed System Date: 3/26/21 Change Order/Quantity ZEBRA Adjustment No. 1 Associated Constructin Partners, Ltd 215 W Bandera Rd, Suite 114-461, Boerne, Texas 78006 210-698-8714 Company Name Address Phone No. fo avoid conflicts with existing utilities, establish an alternate alignment, and improve safety features for the stairs and match existing facilities. SUMMARY Amount % Change Original Contract Price: 00 Previous Quantity Adjustment(s): 00 This Quantity Adjustment: =$23,713.55 Total Quant=ty Adjustment(s): 55 Total Contract Price with Quantity Adjustment(s): 55 Previous Change Order(s): $0.00 0% This Change Order: $0.00 00/0 Total Change Order(s) To Date: $0.00 0% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $1,088,613.55 Difference between Original and Adjusted Contract Prices: $23,713.55 Original Contract Time (days for final completion): 210 Time Adjustment by previous Quan. Adj./Change Order: 0 Time Adjustment by this Quan. Adj./Change Order: 70 New Contract Time (days for final completion): 280 t Submitted for Approval Prepared By: �'� Joseph Jenkins Senior Client Manager, Walker Partners 3/26/21 S ure Mr Printed Name, Title, Company Date Approva is Contractor: Signature P nted Name, Title, Company at City Project Manager: e.r E rift 9, A S%(s i¢ Printed Name, Title ate Mayor/City -- Manager Signature Printed Name, Title Date t/4- 2021440e, Page 2 of 4 Contract Quantity Adjustment/Change Order Project Name: Lake Georgetown Chemical Feed System Quan. Adj./Change Order No.: Change Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 Backhoe;,Ldr 60-90HP 4WD Daily Rate 7 $387.00 $2,709.00 2 Rammer Lg 2900 36003 Daily Rate 1 $450.00 $450.00 3 SkidSteer1351-1699 Daily Rate 7 -$206.00 -$1,442.00 4 Rock Saw Reduction CY 313.33 -$30.00 -$9,400.00 5 Project Manager Daily Rate 1 $628.10 $628.10 6 Supervision Daily Rate 1 $409.91 $409.91 7 General Labor Daily Rate 3 $323.75 $971.25 8 Skilled Labor Daily Rate 1 $394.62 $394.62 9 TCS #111 Super Base (price/ton) Ton 20 $22.50 $450.00 10 Additional Concrete CY 6 $145.00 $870.00 11 Additonal Rebar LS 1 $75.00 $75.00 12 Formwork LS 1 $420.00 $420.00 13 Stair Handrail EA 1 $650.00 $650.00 14 Top Soil CY 20 $36.00 $720.00 15 Backhoe/Ldr 60-90HP 4WD Daily Rate 1 $307.00 $307.00 16 Roller WB24-33 Daily Rate 1 $288.00 $288.00 17 Contractor's Overhead and Profit LS 1 $927.58 $927.58 18 Supervision Daily Rate 5 $409.91 $2,049.53 19 General Labor Daily Rate 5 $323.75 $1,618.76 20 Skilled Labor Daily Rate 5 $394.62 $1,973.08 21 Backhoe/Ldr 60-90HP 4WD Daily Rate 5 $307.00 $1,535,00 22 Backhoe Breaker Daily Rate 5 $326.00 $1,630.00 23 Multivolt - PVC Coated Steel Conduit LS 1 $12,941.00 $12,941.00 24 Multivolt - PVC Deduction LS 1 -$266.20 -$266.20 25 Contractor's Overhead and Profit LS 1 $880.64 $880.64 26 Contractor's Overhead and Profit on Subcontractor Direct Costs I LS 1 1 $633.74 $633.74 Page 3 of 4 It-- Contract Quantity Adjustment/Change Order m , 01;16 27 Skilled Labor Daily Rate 0.5 $394.62 $197.31 28 76" Cast Aluminum Stair Nosings FA 5 $195.00 $975.00 29 Contractor's Overhead and Profit LS 1 $117.23 $117.23 Page 4 of 4 Contract Quantity Adjustment/Change Order pew, OV L6 Pro)ect Name: Lake Georgetown Chemical Feed System Quan. AdjdChange Order No.: Quantity Adiustment Data Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment Labor, materials, equipment and services for construction of a Chemical Feed System at the Lake Georgetown Raw Water Intake as depicted and noted in the plans and specifications, including a safety plan, mobilization and demobilization, construction of a sodium permanganate fill station and piping to bulk chemical facilities, bulk chemical structure and facilities, chemical metering budding and facilities, chemical tubing and containment piping from chemical metering building to splitter box and three solenoid boxes at the raw water intake pump station, electrical equipment and controls, and related civil and other items necessary for a complete, 1 operational project. I LS I 1 1 $23,713.551 $23,713.55 70 TOTALS: 1 23 713.55 70 � x � p >4 � � - 0 \ � } . � �v ` � Chemical '- . Termination . Raw Water Intake Screens . � ` / • ' �/ /\f'- ` \ > . � LT • � _ f » p _ . \ \_ . %41 � U$ ROUND ROCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Associated Construction Partners, Ltd. for the Lake Georgetown Chemical Feed Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/23/2021 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $23,713.55 Indexes: Self -Financed Water Construction Attachments: CO-QA No. 1_Partial Signed, Map Department: Utilities and Environmental Services Text of Legislative File CM-2021-116 The City of Round Rock owns a raw water pump station on Lake Georgetown, which supplies water to Round Rock's water treatment plant. Invasive zebra mussels have recently been detected in Lake Georgetown and on the intake structure of the raw water pump station. Zebra mussels have a long history of attaching in massive quantities to raw water intakes and pipelines, thereby damaging the infrastructure and restricting flow to the facility. The purpose of this project is to construct a sodium permanganate chemical feed system at Round Rock's Lake Georgetown raw water pump station. The sodium permanganate system will assist with taste and odor issues, provide manganese control, and assist with zebra mussel prevention in the raw water pipelines. The project will consist of a chemical fill station, a bulk chemical storage tank, a chemical building, and three chemical feed lines down to the raw water intake. The City of Round Rock awarded Associated Construction Partners, LTD with the contract in June, 2020 for $1,064,900. This change order accounts for electrical conduit crossings that will require a better grade of conduit, time, and man hours. We will also be adding additional safety features to the building, including guard rails and safety footings. This change order for $23,713.55 will bring the contract to $1,088,613.55. Cost: $23,713.55 City of Round Rock Page 1 of 2 Agenda Item 5ummaryon8nued (CM-2021-116) Source of Funds: Self -Financed Water Construction City of Round Rock Page 2 of 2