Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CM-2021-134 - 5/7/2021
ROUND ROCK T f 1€p {� CITY OF ROUND ROCK CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING INC. ("Engineer") ADDRESS: 710 Hesters Crossing Road Suite 150 Round Rock TX 78681 PROJECT: UPRR Ouiet Zone Diagnostics THE STATE OF TEXAS § COUNTY OF WILLIAMSON § I CONTRA TIF R ENGINEERING SERVICES ("Contract") is made and entered into on this the�day of�"�' , 2021 by and between the CITY OF ROUND ROCK, a Texas home - rule municipal corporation, wh e offices are located at 221 East Main Street, Round Rock, Texas 78664-5299, (hereinafter referred to as "City"), and Engineer, and such Contract is for the purpose of contracting for professional engineering services. RECITALS: WHEREAS, V.T.C.A., Government Code §2254.002(2)(A)(vii) under Subchapter A entitled "Professional Services Procurement Act" provides for the procurement by municipalities of services of professional engineers; and WHEREAS, City and Engineer desire to contract for such professional engineering services; and WHEREAS, City and Engineer wish to document their agreement concerning the requirements and respective obligations of the parties; NOW, THEREFORE, WITNESSETH: That for and in consideration of the mutual promises contained herein and other good and valuable considerations, and the covenants and agreements hereinafter contained to be kept and performed by the respective parties hereto, it is agreed as follows: Engineering Services Contract 0199.202109; 00470221 Rev. 08 19 00192831 CONTRACT DOCUMENTS The Contract Documents consist of this Contract and any exhibits attached hereto (which exhibits are hereby incorporated into and made a part of this Contract) and all Supplemental Contracts (as defined herein in Article 13) which are subsequently issued. These form the entire contract, and all are as fully a part of this Contract as if attached to this Contract or repeated herein. ARTICLE I CITY SERVICES City shall perform or provide services as identified in Exhibit A entitled "City Services." ARTICLE 2 ENGINEERING SERVICES Engineer shall perform Engineering Services as identified in Exhibit B entitled "Engineering Services." Engineer shall perform the Engineering Services in accordance with the Work Schedule as identified in Exhibit C entitled "Work Schedule." Such Work Schedule shall contain a complete schedule so that the Engineering Services under this Contract may be accomplished within the specified time and at the specified cost. The Work Schedule shall provide specific work sequences and definite review times by City and Engineer of all Engineering Services. Should the review times or Engineering Services take longer than shown on the Work Schedule, through no fault of Engineer, Engineer may submit a timely written request for additional time, which shall be subject to the approval of the City Manager. ARTICLE 3 CONTRACT TERM (1) Term. The Engineer is expected to complete the Engineering Services described herein in accordance with the above described Work Schedule. If Engineer does not perform the Engineering Services in accordance with the Work Schedule, then City shall have the right to terminate this Contract as set forth below in Article 20. So long as the City elects not to terminate this Contract, it shall continue from day to day until such time as the Engineering Services are completed. Any Engineering Services performed or costs incurred after the date of termination shall not be eligible for reimbursement. Engineer shall notify City in writing as soon as possible if helshe'it determines, or reasonably anticipates, that the Engineering Services will not be completed in accordance with the Work Schedule. (2) Work Schedule. Engineer acknowledges that the Work Schedule is of critical importance, and agrees to undertake all necessary efforts to expedite the performance of Engineering Services required herein so that construction of the project will be commenced and completed as scheduled. In this regard, and subject to adjustments in the Work Schedule as provided in Article 2 herein, Engineer shall proceed with sufficient qualified personnel and consultants necessary to fully and timely accomplish all Engineering Services required under this Contract in a professional manner. 7 (3) Notice to Proceed. After execution of this Contract, Engineer shall not proceed with Engineering Services until authorized in writing by City to proceed as provided in Article 7. ARTICLE 4 COMPENSATION City shall pay and Engineer agrees to accept the amount shown below as full compensation for the Engineering Services performed and to be performed under this Contract. The amount payable under this Contract, without modification of the Contract as provided herein, is the sum of Twelve Thousand Five Hundred Eleven and 80/ 100 Dollars 12 51 1.80 as shown in Exhibit D. The lump sum amount payable shall be revised equitably only by written Supplemental Contract in the event of a change in Engineering Services as authorized by City. Engineer shall prepare and submit to City monthly progress reports in sufficient detail to support the progress of the Engineering Services and to support invoices requesting monthly payment. Any preferred format of City for such monthly progress reports shall be identified in Exhibit B. Satisfactory progress of Engineering Services shall be an absolute condition of payment. The fee herein referenced may be adjusted for additional Engineering Services requested and performed only if approved by written Supplemental Contract. ARTICLE 5 METHOD OF PAYMENT Payments to Engineer shall be made while Engineering Services are in progress. Engineer shall prepare and submit to City, not more frequently than once per month, a progress report as referenced in Article 4 above. Such progress report shall state the percentage of completion of Engineering Services accomplished during that billing period and to date. Simultaneous with submission of such progress report, Engineer shall prepare and submit one (1) original and one (1) copy of a certified invoice in a form acceptable to City. This submittal shall also include a progress assessment report in a form acceptable to City. Progress payments shall be made in proportion to the percentage of completion of Engineering Services identified in Exhibit D. Progress payments shall be made by City based upon Engineering Services actually provided and performed. Upon timely receipt and approval of each statement, City shall make a good faith effort to pay the amount which is due and payable within thirty (30) days. City reserves the right to withhold payment pending verification of satisfactory Engineering Services performed. Engineer has the responsibility to submit proof to City, adequate and sufficient in its determination, that tasks were completed. The certified statements shall show the total amount earned to the date of submission and shall show the amount due and payable as of the date of the current statement. Final payment does not relieve Engineer of the responsibility of correcting any errors and/or omissions resulting from his/her/its negligence. 3 ARTICLE 6 PROMPT PAYMENT POLICY In accordance with Chapter 2251, V.T.C.A., Texas Government Code, payment to Engineer will be made within thirty (30) days of the day on which the performance of services was complete, or within thirty (30) days of the day on which City receives a correct invoice for services, whichever is later. Engineer may charge a late fee (fee shall not be greater than that which is permitted by Texas law) for payments not made in accordance with this prompt payment policy; however, this policy does not apply in the event: A. There is a bona fide dispute between City and Engineer concerning the supplies, materials, or equipment delivered or the services performed that causes the payment to be late; or B. The terms of a federal contract, grant, regulation, or statute prevent City from making a timely payment with federal funds; or C. There is a bona fide dispute between Engineer and a subcontractor or between a subcontractor and its supplier concerning supplies, materials, or equipment delivered or the Engineering Services performed which causes the payment to be late; or D. The invoice is not mailed to City in strict accordance with instructions, if any, on the purchase order, or this Contract or other such contractual agreement. City shall document to Engineer the issues related to disputed invoices within ten (10) calendar days of receipt of such invoice. Any non -disputed invoices shall be considered correct and payable per the terms of Chapter 2251, V.T.C.A., Texas Government Code. ARTICLE 7 NOTICE TO PROCEED The Engineer shall not proceed with any task listed on Exhibit B until the City has issued a written Notice to Proceed regarding such task. The City shall not be responsible for work performed or costs incurred by Engineer related to any task for which a Notice to Proceed has not been issued. ARTICLE 8 PROJECT TEAM City's Designated Representative for purposes of this Contract is as follows: Bill Stablein Project Manager 3400 Sunrise Road Round Rock, TX 78665 Telephone Number (512) 218-3237 Fax Number NIA Email Address bstablein a roundrocktexas. ov 4 City's Designated Representative shall be authorized to act on City's behalf with respect to this Contract. City or City's Designated Representative shall render decisions in a timely manner pertaining to documents submitted by Engineer in order to avoid unreasonable delay in the orderly and sequential progress of Engineering Services. Engineer's Designated Representative for purposes of this Contract is as follows: Benedict P. Patrick, PE, PTOE Round Rock Traffic Lead 710 Hesters Crossing Road, Suite 150 Round Rock, TX 78681 Telephone Number (512) 685-2906 Fax Number N/A Email Address benedict.patrickrii;lidrinc.com ARTICLE 9 PROGRESS EVALUATION Engineer shall, from time to time during the progress of the Engineering Services, confer with City at City's election. Engineer shall prepare and present such information as may be pertinent and necessary, or as may be requested by City, in order for City to evaluate features of the Engineering Services. At the request of City or Engineer, conferences shall be provided at Engineer's office, the offices of City, or at other locations designated by City. When requested by City, such conferences shall also include evaluation of the Engineering Services. Should City determine that the progress in Engineering Services does not satisfy the Work Schedule, then City shall review the Work Schedule with Engineer to determine corrective action required. Engineer shall promptly advise City in writing of events which have or may have a significant impact upon the progress of the Engineering Services, including but not limited to the following: (1) Problems, delays, adverse conditions which may materially affect the ability to meet the objectives of the Work Schedule, or preclude the attainment of project Engineering Services units by established time periods; and such disclosure shall be accompanied by statement of actions taken or contemplated, and City assistance needed to resolve the situation, if any; and (2) Favorable developments or events which enable meeting the Work Schedule goals sooner than anticipated. 5 ARTICLE 10 SUSPENSION Should City desire to suspend the Engineering Services, but not to terminate this Contract, then such suspension may be effected by City giving Engineer thirty (30) calendar days' verbal notification followed by written confirmation to that effect. Such thirty -day notice may be waived in writing by agreement and signature of both parties. The Engineering Services may be reinstated and resumed in full force and effect within sixty (60) days of receipt of written notice from City to resume the Engineering Services. Such sixty-day notice may be waived in writing by agreement and signature of both parties. If this Contract is suspended for more than thirty (30) days, Engineer shall have the option of terminating this Contract. If City suspends the Engineering Services, the contract period as determined in Article 3, and the Work Schedule, shall be extended for a time period equal to the suspension period. City assumes no liability for Engineering Services performed or costs incurred prior to the date authorized by City for Engineer to begin Engineering Services, andror during periods when Engineering Services is suspended, and/or subsequent to the contract completion date. ARTICLE 11 ADDITIONAL ENGINEERING SERVICES If Engineer forms a reasonable opinion that any work heishelit has been directed to perform is beyond the scope of this Contract and as such constitutes extra work, he.she/it shall promptly notify City in writing. In the event City finds that such work does constitute extra work and exceeds the maximum amount payable, City shall so advise Engineer and a written Supplemental Contract will be executed between the parties as provided in Article 13. Engineer shall not perform any proposed additional work nor incur any additional costs prior to the execution, by both parties, of a written Supplemental Contract. City shall not be responsible for actions by Engineer nor for any costs incurred by Engineer relating to additional work not directly associated with the performance of the Engineering Services authorized in this Contract or any amendments thereto. ARTICLE 12 CHANGES IN ENGINEERING SERVICES If City deems it necessary to request changes to previously satisfactorily completed Engineering Services or parts thereof which involve changes to the original Engineering Services or character of Engineering Services under this Contract, then Engineer shall make such revisions as requested and as directed by City. Such revisions shall be considered as additional Engineering Services and paid for as specified under Article 11, Engineer shall make revisions to Engineering Services authorized hereunder as are necessary to correct errors appearing therein, when required to do so by City. No additional compensation shall be due for such Engineering Services. 6 ARTICLE 13 SUPPLEMENTAL CONTRACTS The terms of this Contract may be modified by written Supplemental Contract if City determines that there has been a significant change in (1) the scope, complexity or character of the Engineering Services, or (2) the duration of the Engineering Services. Any such Supplemental Contract must be duly authorized by the City. Engineer shall not proceed until the Supplemental Contract has been executed. Additional compensation, if appropriate, shall be identified as provided in Article 4. It is understood and agreed by and between both parties that Engineer shall make no claim for extra work done or materials furnished until the City authorizes full execution of the written Supplemental Contract and authorization to proceed. City reserves the right to withhold payment pending verification of satisfactory Engineering Services performed. ARTICLE 14 USE OF DOCUMENTS All documents, including but not limited to drawings, specifications and data or programs stored electronically, (hereinafter referred to as "Instruments of Service") prepared by Engineer and its subcontractors are related exclusively to the services described in this Contract and are intended to be used with respect to this Project. However, it is expressly understood and agreed by and between the parties hereto that all of Engineer's designs under this Contract (including but not limited to tracings, drawings, estimates, specifications, investigations, studies and other documents, completed or partially completed), shall be the property of City to be thereafter used in any lawful manner as City elects. Any such subsequent use made of documents by City shall be at City's sole risk and without liability to Engineer, and, to the extent permitted by law, City shall hold harmless Engineer from all claims, damages, losses and expenses, resulting therefrom. Any modification of the plans will be evidenced on the plans and be signed and sealed by a licensed professional prior to re -use of modified plans. By execution of this Contract and in confirmation of the fee for services to be paid under this Contract, Engineer hereby conveys, transfers and assigns to City all rights under the Federal Copyright Act of 1976 (or any successor copyright statute), as amended, all common law copyrights and all other intellectual property rights acknowledged by law in the Project designs and work product developed under this Contract. Copies may be retained by Engineer. Engineer shall be liable to City for any loss or damage to any such documents while they are in the possession of or while being worked upon by Engineer or anyone connected with Engineer, including agents, employees, Engineers or subcontractors. All documents so lost or damaged shall be replaced or restored by Engineer without cost to City. Upon execution of this Contract, Engineer grants to City permission to reproduce Engineer's work and documents for purposes of constructing, using and maintaining the Project, provided that City shall comply with its obligations, including prompt payment of all sums when due, under this Contract. Engineer shall obtain similar permission from Engineer's subcontractors consistent with this Contract. If and upon the date Engineer is adjudged in default of this Contract, City is permitted to authorize other similarly credentialed design professionals to reproduce and, where permitted by law, to make changes, corrections or additions to the work and documents for the purposes of completing, using and maintaining the Project. 7 City shall not assign, delegate, sublicense, pledge or otherwise transfer any permission granted herein to another party without the prior written contract of Engineer. However, City shall be permitted to authorize the contractor, subcontractors and material or equipment suppliers to reproduce applicable portions of the Instruments of Service appropriate to and for use in their execution of the Work. Submission or distribution of Instruments of Service to meet official regulatory requirements or for similar purposes in connection with the Project is permitted. Any unauthorized use of the Instruments of Service shall be at City's sole risk and without liability to Engineer and its Engineers. Prior to Engineer providing to City any Instruments of Service in electronic form or City providing to Engineer any electronic data for incorporation into the Instruments of Service, City and Engineer shall by separate written contract set forth the specific conditions governing the format of such Instruments of Service or electronic data, including any special limitations not otherwise provided in this Contract. Any electronic files are provided by Engineer for the convenience of City, and use of them is at City's sole risk. In the case of any defects in electronic files or any discrepancies between them and any hardcopy of the same documents prepared by Engineer, the hardcopy shall prevail. Only printed copies of documents conveyed by Engineer shall be relied upon. Engineer shall have no liability for changes made to the drawings by other engineers subsequent to the completion of the Project. Any such change shall be sealed by the engineer making that change and shall be appropriately marked to reflect what was changed or modified. ARTICLE 15 PERSONNEL EQUIPMENT AND MATERIAL Engineer shall furnish and maintain, at its own expense, quarters for the performance of all Engineering Services, and adequate and sufficient personnel and equipment to perform the Engineering Services as required. All employees of Engineer shall have such knowledge and experience as will enable them to perform the duties assigned to them. Any employee of Engineer who, in the opinion of City, is incompetent or whose conduct becomes detrimental to the Engineering Services shall immediately be removed from association with the project when so instructed by City. Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the Engineering Services required under this Contract, or will obtain such personnel from sources other than City. Engineer may not change the Project Manager without prior written consent of City. ARTICLE 16 SUBCONTRACTING Engineer shall not assign, subcontract or transfer any portion of the Engineering Services under this Contract without prior written approval from City. All subcontracts shall include the provisions required in this Contract and shall be approved as to form, in writing, by City prior to Engineering Services being performed under the subcontract. No subcontract shall relieve Engineer of any responsibilities under this Contract. ARTICLE 17 EVALUATION OF ENGINEERING SERVICES City, or any authorized representatives of it, shall have the right at all reasonable times to review or otherwise evaluate the Engineering Services performed or being performed hereunder and the premises on which it is being performed. If any review or evaluation is made on the premises of Engineer or a subcontractor, then Engineer shall provide and require its subcontractors to provide all reasonable facilities and assistance for the safety and convenience of City or other representatives in the performance of their duties. ARTICLE 18 SUBMISSION OF REPORTS All applicable study reports shall be submitted in preliminary form for approval by City before any final report is issued. City's comments on Engineer's preliminary reports shall be addressed in any final report. ARTICLE 19 VIOLATION OF CONTRACT TERMS/BREACH OF CONTRACT Violation of contract terms or breach of contract by Engineer shall be grounds for termination of this Contract, and any increased costs arising from Engineer's default, breach of contract, or violation of contract terms shall be paid by Engineer. ARTICLE 20 TERMINATION This Contract may be terminated as set forth below. (1) By mutual agreement and consent, in writing, of both parties. (2) By City, by notice in writing to Engineer, as a consequence of failure by Engineer to perform the Engineering Services set forth herein in a satisfactory manner. (3) By either party, upon the failure of the other party to fulfill its obligations as set forth herein. (4) By City, for reasons of its own and not subject to the mutual consent of Engineer, upon not less than thirty (30) days' written notice to Engineer. (5) By satisfactory completion of all Engineering Services and obligations described herein. Should City terminate this Contract as herein provided, no fees other than fees due and payable at the time of termination shall thereafter be paid to Engineer. In determining the value of the Engineering Services performed by Engineer prior to termination, City shall be the sole judge. Compensation for Engineering Services at termination will be based on a percentage of the Engineering 9 Services completed at that time. Should City terminate this Contract under Subsection (4) immediately above, then the amount charged during the thirty -day notice period shall not exceed the amount charged during the preceding thirty (30) days. If Engineer defaults in the performance of this Contract or if City terminates this Contract for fault on the part of Engineer, then City shall give consideration to the actual costs incurred by Engineer in performing the Engineering Services to the date of default, the amount of Engineering Services required which was satisfactorily completed to date of default, the value of the Engineering Services which are usable to City, the reasonable and necessary cost to City of employing another firm to complete the Engineering Services required and the time required to do so, and other factors which affect the value to City of the Engineering Services performed at the time of default. The termination of this Contract and payment of an amount in settlement as prescribed above shall extinguish all rights, duties, and obligations of City and Engineer under this Contract, except the obligations set forth herein in Article 21 entitled "Compliance with Laws." If the termination of this Contract is due to the failure of Engineer to fulfill hislherlits contractual obligations, then City may take over the project and prosecute the Engineering Services to completion. In such case, Engineer shall be liable to City for any additional and reasonable costs incurred by City. Engineer shall be responsible for the settlement of all contractual and administrative issues arising out of any procurements made by Engineer in support of the Engineering Services under this Contract. ARTICLE 21 COMPLIANCE WITH LAWS (1) Compliance. Engineer shall comply with all applicable federal, state and local laws, statutes, codes, ordinances, rules and regulations, and the orders and decrees of any court, or administrative bodies or tribunals in any manner affecting the performance of this Contract, including without limitation, minimum/maximum salary and wage statutes and regulations, and licensing laws and regulations. Engineer shall furnish City with satisfactory proof of his/her/its compliance. Engineer shall further obtain all permits and licenses required in the performance of the Engineering Services contracted for herein. (2) Taxes. Engineer will pay all taxes, if any, required by law arising by virtue of the Engineering Services performed hereunder. City is qualified for exemption pursuant to the provisions of Section 151.309 of the Texas Limited Sales, Excise, and Use Tax Act. (3) As required by Chapter 2270, Government Code, Engineer hereby verifies that it does not boycott Israel and will not boycott Israel through the term of this Agreement. For purposes of this verification, "boycott Israel" means refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing business in Israel or in an Israeli - controlled territory, but does not include an action made for ordinary business purposes. 10 ARTICLE 22 INDEMNIFICATION Engineer shall save and hold City harmless from all liability for damage to the extent that the damage is caused by or results from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier committed by Engineer, Engineer's agent, or another entity over which Engineer exercises control. Engineer shall also save and hold City harmless from any and all expenses, including but not limited to reasonable attorneys' fees which may be incurred by City in litigation or otherwise defending claims or liabilities which may be imposed on City to the extent resulting from such negligent activities by Engineer, its agents, or employees. ARTICLE 23 ENGINEER'S RESPONSIBILITIES Engineer shall be responsible for the accuracy of hWher/its Engineering Services and shall promptly make necessary revisions or corrections to its work product resulting from errors, omissions, or negligent acts, and same shall be done without compensation. City shall determine Engineer's responsibilities for all questions arising from design errors and/or omissions. Engineer shall not be relieved of responsibility for subsequent correction of any such errors or omissions in its work product, or for clarification of any ambiguities until after the construction phase of the project has been completed. ARTICLE 24 ENGINEER'S SEAL The responsible engineer shall sign, seal and date all appropriate engineering submissions to City in accordance with the Texas Engineering Practice Act and the rules of the State Board of Registration for Professional Engineers. ARTICLE 25 NON -COLLUSION, FINANCIAL INTEREST PROHIBITED (1) Non -collusion. Engineer warrants that he/she/it has not employed or retained any company or persons, other than a bona fide employee working solely for Engineer, to solicit or secure this Contract, and that he/she/it has not paid or agreed to pay any company or engineer any fee, commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City reserves and shall have the right to annul this Contract without liability or, in its discretion and at its sole election, to deduct from the contract price or compensation, or to otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift or contingent fee. (2) Financial Interest Prohibited. Engineer covenants and represents that Engineer, his/her/its officers, employees, agents, consultants and subcontractors will have no financial interest, direct or indirect, in the purchase or sale of any product, materials or equipment that will be recommended or required for the construction of the project. ARTICLE 26 INSURANCE (1) Insurance. Engineer, at Engineer's sole cost, shall purchase and maintain during the entire term while this Contract is in effect professional liability insurance coverage in the minimum amount of One Million Dollars per claim from a company authorized to do insurance business in Texas and otherwise acceptable to City. Engineer shall also notify City, within twenty-four (24) hours of receipt, of any notices of expiration, cancellation, non -renewal, or material change in coverage it receives from its insurer. (2) Subconsultant Insurance. Without limiting any of the other obligations or liabilities of Engineer, Engineer shall require each subconsultant performing work under this Contract to maintain during the term of this Contract, at the subconsultant's own expense, the same stipulated minimum insurance required in Article 26, Section (1) above, including the required provisions and additional policy conditions as shown below in Article 26, Section (3). Engineer shall obtain and monitor the certificates of insurance from each subconsultant in order to assure compliance with the insurance requirements. Engineer must retain the certificates of insurance for the duration of this Contract, and shall have the responsibility of enforcing these insurance requirements among its subconsultants. City shall be entitled, upon request and without expense, to receive copies of these certificates of insurance. (3) Insurance Policy Endorsements. Each insurance policy shall include the following conditions by endorsement to the policy: (a) Engineer shall notify City thirty (30) days prior to the expiration, cancellation, non - renewal in coverage, and such notice thereof shall be given to City by certified mail to: City Manager, City of Round Rock 221 East Main Street Round Rock, Texas 78664 (b) The policy clause "Other Insurance" shall not apply to any insurance coverage currently held by City, to any such future coverage, or to City's Self -Insured Retentions of whatever nature. (4) Cost of Insurance. The cost of all insurance required herein to be secured and maintained by Engineer shall be borne solely by Engineer, with certificates of insurance evidencing such minimum coverage in force to be filed with City. Such Certificates of Insurance are evidenced as Exhibit E herein entitled "Certificates of Insurance." 12 ARTICLE 27 COPYRIGHTS City shall have the royalty -free, nonexclusive and irrevocable right to reproduce, publish or otherwise use, and to authorize others to use, any reports developed by Engineer for governmental purposes. ARTICLE 28 SUCCESSORS AND ASSIGNS This Contract shall be binding upon and inure to the benefit of the parties hereto, their successors, lawful assigns, and legal representatives. Engineer may not assign, sublet or transfer any interest in this Contract, in whole or in part, by operation of law or otherwise, without obtaining the prior written consent of City. ARTICLE 29 SEVERABILITY In the event any one or more of the provisions contained in this Contract shall for any reason be held to be invalid, illegal or unenforceable in any respect, then such invalidity, illegality or unenforceability shall not affect any other provision thereof and this Contract shall be construed as if such invalid, illegal or unenforceable provision had never been contained herein. ARTICLE 30 PRIOR AGREEMENTS SUPERSEDED This Contract constitutes the sole agreement of the parties hereto, and supersedes any prior understandings or written or oral contracts between the parties respecting the subject matter defined herein. This Contract may only be amended or supplemented by mutual agreement of the parties hereto in writing. ARTICLE 31 ENGINEER'S ACCOUNTING RECORDS Records pertaining to the project, and records of accounts between City and Engineer, shall be kept on a generally recognized accounting basis and shall be available to City or its authorized representatives at mutually convenient times, The City reserves the right to review all records it deems relevant which are related to this Contract. ARTICLE 32 NOTICES All notices to either party by the other required under this Contract shall be personally delivered or mailed to such party at the following respective addresses: 13 City: City of Round Rock Attention: City Manager 221 East Main Street Round Rock, TX 78664 and to: Stephan L. Sheets City Attorney 309 East Main Street Round Rock, TX 78664 Engineer: Benedict P. Patrick, PE, PTOE Round Rock Traffic Lead 710 Hesters Crossing Road, Suite 150 Round Rock, TX 78681 ARTICLE 33 GENERAL PROVISIONS (1) Time is of the Essence. The Services shall be performed expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. Engineer understands and agrees that time is of the essence and that any failure of Engineer to complete the Engineering Services for each phase of this Contract within the agreed Work Schedule may constitute a material breach of this Contract. Engineer shall be fully responsible for his/herlits delays or for failures to use his/her./its reasonable efforts in accordance with the terms of this Contract and the Engineer's standard of performance as defined herein. Where damage is caused to City due to Engineer's negligent failure to perform City may accordingly withhold, to the extent of such damage, Engineer's payments hereunder without waiver of any of City's additional legal rights or remedies. Any determination to withhold or set off shall be made in good faith and with written notice to Engineer provided, however, Engineer shall have fourteen (14) calendar days from receipt of the notice to submit a plan for cure reasonably acceptable to City. (2) Force Majeure. Neither City nor Engineer shall be deemed in violation of this Contract if prevented from performing any of their obligations hereunder by reasons for which they are not responsible or circumstances beyond their control. However, notice of such impediment or delay in performance must be timely given, and all reasonable efforts undertaken to mitigate its effects. (3) Enforcement and Venue. This Contract shall be enforceable in Round Rock, Williamson County, Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in Williamson County, Texas. 14 This Contract shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. (4) Standard of Performance. The standard of care for all professional engineering, consulting and related services performed or furnished by Engineer and its employees under this Contract will be the care and skill ordinarily used by members of Engineer's profession practicing under the same or similar circumstances at the same time and in the same locality. Excepting Articles 25 and 34 herein, Engineer makes no warranties, express or implied, under this Contract or otherwise, in connection with the Engineering Services. (5) Opinion of Probable Cost. Any opinions of probable project cost or probable construction cost provided by Engineer are made on the basis of information available to Engineer and on the basis of Engineer's experience and qualifications and represents its judgment as an experienced and qualified professional engineer. However, since Engineer has no control over the cost of labor, materials, equipment or services furnished by others, or over the contractor(s') methods of determining prices, or over competitive bidding or market conditions, Engineer does not guarantee that proposals, bids or actual project or construction cost will not vary from opinions of probable cost Engineer prepares. (6) Opinions and Determinations. Where the terms of this Contract provide for action to be based upon opinion, judgment, approval, review, or determination of either party hereto, such terms are not intended to be and shall never be construed as permitting such opinion, judgment, approval, review, or determination to be arbitrary, capricious, or unreasonable. ARTICLE 34 SIGNATORY WARRANTY The undersigned signatory for Engineer hereby represents and warrants that the signatory is an officer of the organization for which he/she has executed this Contract and that helshe has full and complete authority to enter into this Contract on behalf of the firm. The above -stated representations and warranties are made for the purpose of inducing City to enter into this Contract. IN WITNESS WHEREOF, the City of Round Rock has caused this Contract to be signed in its corporate name by its duly authorized City Manager or Mayor, as has Engineer, signing by and through its duly authorized representative(s), thereby binding the parties hereto, their successors, assigns and representatives for the faithful and full performance of the terms and provisions hereof. [signalure page follow.y] 15 CITY OF ROUND ROCK, TEXAS By: Laurie Hadley, .Tty Manager ATTEST: HDR ENGINEERING, INC. Signature of Principal Printed Name: Mark D. Borenstein 16 APPR VED AS TO FORM: L .-4ud-. Stephan .. Sheets, City Attorney LIST OF EXHIBITS ATTACHED (1) Exhibit A City Services (2) Exhibit B Engineering Services (3) Exhibit C Work Schedule (4) Exhibit D Fee Schedule (5) Exhibit E Certificates of Insurance 17 EXHIBIT A City Services The CITY will provide the following: A. The CITY will designate a Project Manager to represent the CITY. B. Any records available which would assist in the completion of the diagnostics for the quiet zone. C. Meet with the ENGINEER, FRA, UPRR, and TxDOT in the field as part of the diagnostics. D. Review and feedback of recommendations offered by the ENGINEER. E. Review of progress of work and final acceptance of all documents. F. Processing of all periodic payment requests submitted by ENGINEER. G. Submittal of documentation to regulatory agencies for review, comment, or approval when specified. H. Provide the ENGINEER with timely reviews and decisions necessary for the ENGINEER to maintain the project work schedule. EXHIBIT B Engineering Services The work to be performed by HDR Fngineering, Inc. (ENGINEER) shall consist of providing engineering services for Quiet Zone Application Diagnostic Review Meeting for Harrell Parkway (972310C), Brushy Creek (439682D), and Private Road (439687M). This includes preparation of a Quiet Zone Assessment Report documenting the diagnostic review meeting at each crossing. Scope for additional support for Quiet Zone Applications will be addressed following the diagnostic review meetings as a subsequent phase. Exhibits for the diagnostic reviews will be developed using publicly available information as well as as -built information provided by the CITY. CONTRACT CONSTRAINTS AND CONDITIONS Per FRA crossing inventory, Brushy Creek and Private Road crossings shown in the below map are already established as quiet zones while Harrell Parkway has been constructed as a quiet zone. However, based on email with Carolyn Cook on March 30, 2021, there is no documentation of Brushy Creek and Private Road crossings being approved as quiet zones by FRA. The CITY was not able to find documentation of previously conducted diagnostic meetings for Brushy Creek or Harrell Parkway prior to their recent roadway improvements, designed by others to meet quiet zone requirements. Through discussions with Union Pacific (UPRR), they requested diagnostic review meetings to go over each of these three locations. As a result of the diagnostic review meetings, requirements to complete quiet zone applications will be determined. City of Round Rock Pagel of 3 Exhibit B EXCLUSIONS The following items are excluded as part of the diagnostics. A. Any PS&E development for Private Road crossing B. Preparation of the following documentation for the City to submit to FRA, TxDOT, and UPRR as part of the quiet zone development process: • Notice of Intent (NO]) • Reponses to NOI (if any required) • Quiet Zone Application: including any supporting documentation + Notice of Establishment (NOE) • NOI and NOE documents will be sent to City for official mailing. HDR will follow-up with each recipient via email to verify they received. A Separate scope and fee will be established as (in addendum or a nem, contract after the diagnostics are complete and the requirements from FRA and UPRR are fully underslood. SCOPE OF SERVICES I. QUIET ZONE APPLICATION DIAGNOSTIC REVIEW MEETING A. Prepare plan view only exhibit for Private Road crossing for use in diagnostic review meeting, showing existing conditions. B. Utilize as-builts or original design plans for Harrell Parkway and Brushy Creek crossings for exhibits at diagnostic review meeting for showing current conditions. C. Attend diagnostic review meeting in field (HDR PM and Sr Engineer) with FRA, TxDOT, UPRR, and private property owner. D. Prepare Quiet Zone Assessment Report summarizing discussions at diagnostic review meeting including attendee list, requirements for each crossing, and next steps. Deliverable: A. Quiet zone Assessment Report II. PROJECT MANAGEMENT A. Perform general Project Management during the course of the project to include coordination with the CITY and invoices. B. Preparation of project correspondence including reports, record keeping, and letters as necessary. City of Round Rock Page 2 of 3 Exhibit B C. Perform QAIQC of deliverables prior to submittal to the CITY. Implement a documented QA'QC program in accordance with the ENGINEER's established procedures. D. Attend one project coordination meeting via teleconference with the CITY after diagnostic meeting to discuss next steps. City of Round Rock Page 3 of 3 Exhibit B EXHIBIT C Work Schedule Notice to Proceed* May 3'", 2021 Preparation of Exhibits May 141h, 2021 Field Review (Diagnostics) May1911, 2021 Draft Letter Report Submittal June 4'h, 2021 City Comments Due June 111h, 2021 Final Letter Report Submittal June 181h, 2021 * Schedule will be updated if NTP date changes The termination date of the contract shall be adjusted in coordination with the City if the project extends beyond this date or there is delay in scheduling the diagnostics with FRA and UPRR. HON:I1.11Ito] Fee Schedule Attached Behind This Page Exhibit D HDR Engineering, Inc. Project Name: City of Round Rock — UPRR Quiet Zone Diagnostics 4/12/2021 Consultant: HDR Engineering, Inc. Cost Component, Hours Total Hours Sr. Project Manager 8 Senior Engineer 27 Design Engineer 24 Engineer -in -Training 2 Sr. Design Technician 2 Admin/Clerical 1 Total Hours 64 Cost Component, Dollars Labor Billing Totals Rate Rate $ Sr. Project Manager $90.00 $277 20 $2,217.60 Senior Engineer $68.00 $209 44 $5,654.88 Design Engineer $51.00 $157.08 $3,769,92 Engineer -in -Training $35.00 $107.80 $215.60 Sr. Design Technician $39.00 $120.12 $240.24 Admin/Clerical $32.00 $98.56 $98.56 Labor Dollars $12,196.80 Cost Component, Direct Expenses Total {$) Expenses for Design Tasks Travel Expenses (Mileage billed at IRS Standard Rate) $275 Printing 11"x17" Color $20 Printing 8-1/2" x 11" Color $20 CADD Plotting Color Roll Plots $0 TOTAL DIRECT EXPENSES $315.00 PROJECT FEE SUMMARY Total MDR Direct Labor Costs $3,960.00 HDR Indirect Costs 175% $6,930.00 HDR Direct Expenses $315.00 HDR Profit @12% 12% $1,306.80 TOTAL FEE $12,511.80 Page 1 of 1 Exhibit D Project Name City of Round Rock — UPRR Quiet Zone Diagnostics 12-Apr-21 Consultant HDR Engineering, Inc. Hours for the Classifications TOTAL Total Task Hours Total HOR Cost Sr. Project Manager Senior Engineer Design Engineer Engineer In Training Sr. Design Technician Admin / Clerical TASK I Diagnostic Review Meeting $10,780.00 A, B Data Collection / Prepare exhibits / Prep for meeting 8 12 2 22 $3,800.72 C Diagnostic Review Meeting 4 10 14 $3,203.Zo D Memo (draft and final) 8 12 2 22 $3,776,08 SUBTOTAL 4 26 24 1 2 2 1 0 58 TASK II Project Management $1,416.80 A. Project Coordination and Invoices (2 months♦ 1 1 2 $375,76 B. Prepare Project Correspondence and Meeting Minutes 1 1 $277.20 C Perform Q,a/QC of Deliverables (draft and final) 1 1 $277.20 D. Attend Project Coordination Meeting (1 assumed) 1 1 2 $486.64 0 $0.00 SUBTOTAL 4 1 0 0 0 1 6 TQTAk$ g 27 24 2 2 1 64 64 $12,196.80 Pa0e ' .' EXHIBIT E Certificates of Insurance Attached Behind This Page CERTIFICATE OF LIABILITY INSURANCE PRODUCER: Lockton Companies 444 W 47th St Suite 900 Kansas City. MO 64112 Phone: 816-960-9000 E-mail: INSURED: HDR Eneincerin¢. Inc 1917 S 67th Street 0maha. NE 08106 Phone: 512. 5.2928 E-mail: Linda.TanncrAWrinc.co Date: 3/2612020 TDI number required. Please refer to the Texas Dept of Insurance websits: hjjp:/1www.tdI.state.tx.us/ COMPANIES AFFORDING COVERAGE TDI A Lexington Insurance Company 19437 B C D THIS IS TO CERTIFY THAT the Insured named above is insured by the Companies listed above with respect to the business operations hereinafter described, for the types of insurance and in accordance with the provisions of the standard policies used by the companies, and further hereinafter described. Exceptions to the policies are noted below. CO LTR TYPE OF POLICY EFFECTIVE EXPIRATION INSURANCE NUMBER DATE DATE LIMITS GENERAL LIABILITY GENERAL AGGREGATE $ PRODUCTS-COMPIOP AGG. $ PERSONAL 8. ADV. INJURY $ EACH OCCURRENCE $ FIRE DAMAGE (Any one fine) $ MED_ EXPENSE (Any one person) $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE $ EXCESS LIABILITY EACH OCCURRENCL $ AGGREGATE $ WORKERS' COMPENSATION STATUTORY LIMITS $ AND EMPLOYERS' LIABILITY EACH ACCIDENT $ DISEASE - POLICY LIMIT $ DISEASE - EACH EMPLOYEE $ PROFESSIONAL LIABILITY 061853691 6/il20 6/121 S2,000,000 Per Claim & in the Aggregate BUILDERS' RISK INSURANCE OR INSTALLATION INSURANCE CORR On -Call Contract DESCRIPTION OF OPERATIONSILOCATIONSNEHICLESISPECIAL ITEMSIEXCEPTIONS The City of Round Rock is named as additional insured with respect to all policies except Workers' Compensation and Employers' Liability' and 'Professional Liability'. Should any of the above described policies be cancelled or changed before the expiration date thereof, the issuing company will mail thirty (30) days written notice to the certificate holder named below. CERTIFICATE HOLDER: City Manager SI NATURE GENT LICENSED IN STATE OF TEXAS City of Round Rock 221 E_ Main Street _ Round Rock, Texas 78884 Typed Name: Debra ugh License 10- 1126689 Page l 00650 10-2010 Certificate of Liability Insurance 00205796 CERTIFICATE OF LIABILITY INSURANCE Page 1 of 2 DATE (MMIDDNYYY) 03/23/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsements . PRODUCER CONTACT Willis Towers Watson Certificate Center NAME: Willis Towers Watson Midwest, Inc. PHONE S..N1-877-945-7378 FAX 1-886-46T-2378 c/o 26 Century Blvd o..F. 1 . WC,Ne}: P.O. Box 305191 ADDRESS: certificates@Willis.com Nashville, TN 372305191 USA INSURER{4)AFFORDING COVERAGE NAIC0 INSURER A: Liberty Mutual Fire Insurance Company 23035 INSURED IINSURERB: Ohio Casualty Insurance Company 4 24074 HDR191 Engineering, Inc. flj Liberty Insurance Corporation 42404 1917 South 6Tth Street INSURER C : P � Omaha, NE 68105 INSURER rnVFRAC.F.q rFRTIFICATF hI1t1111R1F92• W20401275 DGVICInW M11"Mro• THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTR TYPE OF INSURANCE ADOLISUBR POLICY NUMBER M�oY EFFYr POLICYMMIDD1 EXP LIMBS X COMMERCIAL GENERAL LtABILnY EACH OCCURRENCE S 2.000,000 _ CLAIMS -MADE X OCCUR SER$NTEb -PREMISES{Ea occurrence} S 1,000,000 X : 10,000 A Contractual Liability MEDEXP;Anyoone person) Y y TB2-641-444950-030 06/01/2020 06/01/2021 PERSONAL & ADV INJURY S i ,ODD, 000 GEN'L AGGREGATE LIMIT APPLIES PER: POLICY [ JECT i X LOC GENERAL AGGREGATE S 4,000,000 PRODUCTS - COMPIOP AGG I S 4,000,000 s OTHER: AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT {Ea accident} f 2,000,000 )( BODILY INJURY (Per person) f ANY AUTO A OWNED SCHEDULED Y AUTOS ONLY AUTOS Y AS2-641-444950-04i� 06/01/2020 06/01/2021 BODILY INJURY (Per acddent) $ PROPERTY DAMAGE tPer accident) $ HIRED NOWOWNED AUTOS ONLY AUTOS ONLY S B UMBRELLALIAB X OCCUR EACH OCCURRENCE $ 5,000.000 X AGGREGATE EXCESSLU4B CLAIMS -MADE Y Y EV0(21)57919363 06/01/2020 06/01/2021 $ 5,000,000 DED I X I RETENTIONS 0 S C WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANYPROPRIETOPJPARTNERIEXECUTNE YIN OFFICERIMEMBEREXCLUDED7 No (Myyaeendatory In NH) NIA Y WA7-64D-444950-010 06/01/2020 O6/01/2021 X PER ER EL EACH ACCIDENT i 1, 0'0, 000 E L DISEASE - EA EMPLOYEE S 11000,000 u DEnder SCRIIPPTIION OF OPERATIONS below ELcribe DISEASE - POLICY LIM T S 1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached H more apace Is required) Certificate Bolder is named as Additional Insured on General Liability, Automobile Liability and Umbrella/Excess Liability on a Primary, Non-contributory basis where required by written contract. Waiver of Subrogation applies on General Liability, Automobile Liability, Umbrella/Excess Liability and Workers Compensation where required by written contract and as permitted by law. Umbrella/Excess policy is follow form over General Liability, Auto Liability and Employers Liability. rFRTWi1'.ATF Wrll nFR rANI Fl I ATlnhl SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Round Rock AUTHORIZED REPRESENTATIVE Attn: City Manager 221 E. Main Street Round Rock, TX 78664 Round m 1935-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD SR ID- 20878234 I-Trs- 2029625 AGENCY CUSTOMER ID: LOC #: A OC 1?E# ADDITIONAL REMARKS SCHEDULE Page 2 Of 2 AGENCY NAMED INSURED Willie Towers Watson Midwest, Inc. MDR Engineering, Inc. 1917 South 67th Street Omaha, NE 68106 POLICY NUMBER See Page 1 CARRIER NAIC CODE See Page 1 See Page 1 EFFECTIVE DATE: See Page 1 AL)U1 I IUNAL ITHIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, — FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance Project: Benedict Patrick - 2019 On -Call Traffic Operations Engineering Services; Provide on -call support through individual work authorizations on an as needed basis. ACORD 101 (2008101) ® 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD SR ID: 20878234 BATCH: 2029625 CERT: W20401275 Policy Number: TI92-641-444950.030 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED LOCATION(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Location(s): All locations owned by or rented to the Named Insured Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. For all sums which the insured becomes legally obligated to pay as damages caused by "occur- rences" under Section I — Coverage A, and for all medical expenses caused by accidents under Section I — Coverage C, which can be attributed only to operations at a single designated "loca- tion" shown in the Schedule above: 1. A separate Designated Location General Aggregate Limit applies to each designated "location", and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations. 2. The Designated Location General Aggregate Limit is the most we will pay for the sum of all damages under Coverage A, except damag- es because of "bodily injury" or "property damage" included in the "products -completed operations hazard", and for medical expenses under Coverage C regardless of the number of: a. Insureds; b. Claims made or "suits' brought; or c. Persons or organizations making claims or bringing "suits'. 3. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the Designated Loca- tion General Aggregate Limit for that desig- nated "location". Such payments shall not re- duce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Designated Location General Aggre- gate Limit for any other designated 'location" shown in the Schedule above. 4. The limits shown in the Declarations for Each Occurrence, Damage To Premises Rented To You and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Decla- rations, such limits will be subject to the appli- cable Designated Location General Aggre- gate Limit. CG 26 04 06 09 0 Insurance Services Office, Inc., 2008 Page 1 of 2 B. For all sums which the insured becomes legally obligated to pay as damages caused by 'occur- rences" under Section I — Coverage A, and for all medical expenses caused by accidents under Section I — Coverage C, which cannot be at- tributed only to operations at a single designated "location" shown in the Schedule above: 1. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products -completed Operations Aggregate Limit, whichever is applicable; and 2. Such payments shall not reduce any Desig- nated Location General Aggregate Limit. C. When coverage for liability arising out of the "products -completed operations hazard" is pro- vided, any payments for damages because of "bodily injury" or "property damage" included in the "products -completed operations hazard" will reduce the Products -completed Operations Ag- gregate Limit, and not reduce the General Ag- gregate Limit nor the Designated Location Gen- eral Aggregate Limit. D. For the purposes of this endorsement, the Defi- nitions Section is amended by the addition of the following definition: "Location" means premises involving the same or connecting lots, or premises whose connection is interrupted only by a street, roadway, waterway or right-of-way of a railroad. E. The provisions of Section III — Limits Of Insur- ance not otherwise modified by this endorsement shall continue to apply as stipulated. Page 2 of 2 © Insurance Services Office, Inc., 2008 CG 26 04 05 09 Policy Number: TB2-641-444950-030 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Project(s): All construction projects not located at premises owned, leased or rented by a Named Insured Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. For all sums which the insured becomes legally 3. Any payments made under Coverage A for obligated to pay as damages caused by "occur- damages or under Coverage C for medical rences" under Section I — Coverage A, and for all expenses shall reduce the Designated Con - medical expenses caused by accidents under struction Project General Aggregate Limit for Section I — Coverage C, which can be attributed that designated construction project. Such only to ongoing operations at a single designated payments shall not reduce the General Ag- construction project shown in the Schedule gregate Limit shown in the Declarations nor above: shall they reduce any other Designated Con- 1. A separate Designated Construction Project struction Project General Aggregate Limit for General Aggregate Limit applies to each des- any other designated construction project ignated construction project, and that limit is shown in the Schedule above. equal to the amount of the General Aggregate 4. The limits shown in the Declarations for Each Limit shown in the Declarations. Occurrence, Damage To Premises Rented To 2. The Designated Construction Project General You and Medical Expense continue to apply. Aggregate Limit is the most we will pay for the However, instead of being subject to the sum of all damages under Coverage A, ex- General Aggregate Limit shown in the Decla- cept damages because of "bodily injury" or rations, such limits will be subject to the appli- "property damage" included in the "products- cable Designated Construction Project Gen - completed operations hazard", and for medi- eral Aggregate Limit. cal expenses under Coverage C regardless of the number of: a. Insureds; b. Claims made or "suits" brought; or c. Persons or organizations making claims or bringing "suits'. CG 25 03 05 09 ©Insurance Services Office, Inc., 2008 Page 1 of 2 0 B. For all sums which the insured becomes legally C. obligated to pay as damages caused by "occur- rences" under Section I — Coverage A, and for all medical expenses caused by accidents under Section I — Coverage C, which cannot be at- tributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1. Any payments made under Coverage A for damages or under Coverage C for medical D. expenses shall reduce the amount available under the General Aggregate Limit or the Products -completed Operations Aggregate Limit, whichever is applicable; and 2. Such payments shall not reduce any Desig- nated Construction Project General Aggre- gate Limit. When coverage for liability arising out of the "products -completed operations hazard" is pro- vided, any payments for damages because of "bodily injury" or "property damage" included in the "products -completed operations hazard" will reduce the Products -completed Operations Ag- gregate Limit, and not reduce the General Ag- gregate Limit nor the Designated Construction Project General Aggregate Limit. If the applicable designated construction project has been abandoned, delayed, or abandoned and then restarted, or if the authorized contract- ing parties deviate from plans, blueprints, de- signs, specifications or timetables, the project will still be deemed to be the same construction pro- ject. E. The provisions of Section III — Limits Of Insur- ance not otherwise modified by this endorsement shall continue to apply as stipulated. Page 2 of 2 0 Insurance Services Office, Inc, 2008 CG 25 03 05 09 POLICY NUMBER T132-641-444950-030 COMMERCIAL GENERAL LIABILITY CG20100413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section II - Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions, or 2. The acts or omissions of those acting on your behalf: in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a c ontract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been p ut to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. C. With respect to the insurance afforded to these additional insureds, the following is added to Section III - Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on b ehalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations CG 20 10 0413 4 ISO Properties, Inc., 2012 Page 1 of 2 0 SCHEDULE I Name Of Additional Insured Person(s) I Or Oraanizationtsl I Locations} Of Covered Ooerations I Any person or organization with whom you have Any location where you have agreed, through agreed, through written contract, agreement or writtencontract, agreement or permit, to provide permit to provide additional insured coverage. additionalinsured coverage Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 20 10 04 13 © Insurance Services Office, Inc., 2012 Page 2 of 2 POLICY NUMBER: TB2-641-444950-030 COMMERCIAL GENERAL LIABILITY CG20370413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location And Description Of Completed Operations Any person or organization to whom or to which Any location where you have agreed, through you are required to provide additional insured written, contract, agreement or permit, to provide status in a written contract, agreement or permit additional insured coverage for completed except where such contract or agreement is operations. prohibited. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a c ontract or agreement, the insurance afforded to such additional insured will not be br oader than that which you are equired by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20 37 04 13 ©Insurance Services Office, Inc., 2012 Page 1 of 1 Policy NumberTB2-641-444950-030 Issued by Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY -- OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to Section IV — Conditions 4, Other Insurance and supersedes any provision to the contrary: Primary And Noncontributory Insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and (2) You have agreed prior to a loss, that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured. (3) This insurance is excess over any other insurance available to the additional insured for which it is also covered as an additional insured by attachment of an endorsement to another policy providing coverage for the same 'occurrence", claim or "suit". LD 24 153 08 16 © 2016 Liberty Mutual Insurance Page 1 of 1 Includes copyrighted material of Insurance Services Office Inc, with its permission. POLICY NUMBER: A$2-641-444950-040 COMMERCIAL AUTO CA20481013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED FOR COVERED AUTOS LIABILITY COVERAGE This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form SCHEDULE Name Of Person(s) Or Organization(s): As required by written contract Information required to complete this Schedule, if not shown above, will be shown in the Declarations Each person or organization shown in the Schedule is an "insured" for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Paragraph A.I. of Section II — Covered Autos Liability Coverage in the Business Auto and Motor Carrier Coverage Forms and Paragraph D.2. of Section I — Covered Autos Coverages of the Auto Dealers Coverage Form. CA 20 48 10 13 ©Insurance Services Office, Inc., 2011 Page 1 of 1 Policy Number: AS2-641-444950-040 Issued by: Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED - NONCONTRIBUTING This endorsement mod f es insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIERS COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are 'insureds' under the Who Is An Insured Provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage form. Schedule Name of Person(s) or Organizations(s): Any person or organization where the Named Insured has agreed by written contract to include such person or organization Regarding Designated Contractor Project: piny Each person or organization shown in the Schedule of this endorsement is an "insured" for Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the CoverageForm. The following is added to the Other Insurance Condition: If you have agreed in a written agreement that this policy will be primary and without right of contribution from any insurance in force for an Additional Insured for liability arising out of your operations, and the agreement was executed prior to the "bodily injury" or "property damage", then this insurance will be primary and we will not seek contribution from such insurance. AC 84 23 0811 © 2010, Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission. POLICY NUMBER: TB2-641444950-030 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Person Or Organization: As required by written contract or agreement Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Conditions: We waive any right of recovery we may have against the person or organization shown in the Schedule above because of payments we make for injury or damage arising out of your ongoing operations or "your work" done un der a contract with that person or organization and included in the "products - completed operations hazard". This waiver applies only to the person or organization shown in the Schedule above. CG 24 04 05 09 ) Insurance Services Office, Inc., 2008 Page 1 of 1 POLICY NUMBER: AS2-641-444950-040 COMMERCIAL AUTO CA04441013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. SCHEDULE Names) Of Person(s) Or Organization(s): Any person or organization for whom you perform work under a written contract of the contract requires you to obtain this agreement from us but only if the contract is executed prior to the injury or damage occurring. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. I The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident" or the "loss" under a c ontract with that person or organization. CA 04 441013 C Insurance Services Office, Inc., 2011 Page 1 of 1 WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule Where required by contract or written agreement prior to loss. Issued by Liberty Insurance Corporation For attachment to Policy No WA7 64D.444950-010 Effective Date 06/01/2020 Premium Issued to.HDR Engineering Inc. WC 00 03 13 01983 National Council on Compensation Insurance, Inc. Page 1 of 1 Ed. 41111984 Policy Number T132-60-444950-030 Issued by Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION OR MATERIAL REDUCTION IN COVERAGE TO THIRD PARTIES This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF -INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PROD UCTSICOMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY — UMBRELLA COVERAGE FORM Schedule Name of Other Person(s)1 Email Address or mailing address: Number Days Notice: Organ izations : As required by written contract or As required by written contract or 30 written agreement written agreement A. If we cancel this policy for any reason other than nonpayment of premium, or make a material reduction in coverage, we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation or material reduction of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 04 03 14 O 2014 Liberty Mutual Insurance. All rights reserved Page 1 of i Includes copyrighted material of Insurance Services Office Inc, with its permission. Policy Number AS2-641-444950-040 Issued by Liberty Mutual Fire Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NOTICE OF CANCELLATION OR MATERIAL REDUCTION IN COVERAGE TO THIRD PARTIES This endorsement modifies insurance provided under the following - BUSINESS AUTO COVERAGE PART MOTOR CARRIER COVERAGE PART GARAGE COVERAGE PART TRUCKERS COVERAGE PART EXCESS AUTOMOBILE LIABILITY INDEMNITY COVERAGE PART SELF -INSURED TRUCKER EXCESS LIABILITY COVERAGE PART COMMERCIAL GENERAL LIABILITY COVERAGE PART EXCESS COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCT&COMPLETED OPERATIONS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART COMMERCIAL LIABILITY — UMBRELLA COVERAGE FORM Schedule Name of Other Person(s)1 Email Address or mailing address: Number Days Notice: Organ izations : As required by written contract 30 or written agreement A. If we cancel this policy for any reason other than nonpayment of premium, or make a material reduction in coverage, we will notify the persons or organizations shown in the Schedule above. We will send notice to the email or mailing address listed above at least 10 days, or the number of days listed above, if any, before the cancellation becomes effective. In no event does the notice to the third party exceed the notice to the first named insured. B. This advance notification of a pending cancellation or material reduction of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. All other terms and conditions of this policy remain unchanged. LIM 99 04 03 14 0 2014 Liberty Mutual Insurance All rights reserved. Page 1 of 1 Includes copyrighted mater al of Insurance Services Office Inc., with its permission. WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 99 2074 Ed. 12-16 NOTICE OF CANCELLATION TO THIRD PARTIES A. If we cancel this policy for any reason other than nonpayment of premium, we will notify the persons or organizations shown in the Schedule below by email as soon as practical after notifying the first Named Insured. B. This advance email notification of a pending cancellation of coverage is intended as a courtesy only. Our failure to provide such advance notification will not extend the policy cancellation date nor negate cancellation of the policy. Schedule Name of Other Person(s)1 Organization(s): As required by written contract or agreement 30 Days All other terms and conditions of this policy remain unchanged. Issued by Liberty Insurance Corporation For attachment to Policy No. WA7-64D-444950-010 Effective Date 06/01 /2020 Premium $ Issued to HDR Engineering, Inc. ROUND ROCK TEXA5 City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing a Contract for Engineering Services with HDR Engineering, Inc. for the UPRR Quiet Zone Diagnostics Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 5/7/2021 Dept Director: Gary Hudder, Transportation Director Cost: $12,511.80 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: E5C w-HDR - UPRR Quiet Zone Diagnostics_partexec Department: Transportation Department Text of Legislative File CM-2021-134 The City has upgraded all the Railroad crossings within the Phase 2 limits of the Quiet Zone, which is from Burnett Road to Red Bud Lane. This has been ongoing work for several years to bring the crossings up to compliance for the Quiet Zone and to build the new crossing at Harrell Parkway for the Kalahari Resort. The FRA (Federal Railroad Administration) and Union Pacific Railroad (UPRR) are requiring the City as part of the Quiet Zone Project to perform engineering diagnostic analysis on the crossings. This contract with HDR Engineering is for HDR Engineering to perform the required Engineering diagnostic analysis and to submit a Quiet Zone assessment report for all the crossings including the one at Brushy Creek Plant road and the one remaining private crossing. The amount of this contract is $12,196.80. This will include coordination with UPRR, the FRA, and project management. Cost: $12,S11.80 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock page 1 of 1