R-2021-122 - 5/27/2021RESOLUTION NO. R-2021-122 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Thalle Construction Co. Inc. for the Brushy Creek Regional Wastewater System ("BCRWWS") — East Plant Expansion to 30 MGD Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Thalle Construction Co. Inc. for the BCRWWS - East Plant Expansion to 30 MGD Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 5 51, Texas Government Code, as amended. RESOLVED this 27th day of May 2021. CRAIG�ORG�j[�d, Mayor City of ound 16ck, Texas ATTEST: slat- 0 a SARA L. WHITE, City Clerk 01 12.20212, 00471082 EXHIBIT «A„ Contract Quantity Adjustment/Change Order ROUND ROCK rev, 01/ 16 Department: Project Name• Brushy Creek Regional Wastewater System — East Plant Date: 5/4/21 City Project Change Order/Quantity ID Number R-2020-0090 Adjustment No. Page Iof2 CO-01 Vendor Thalle Construction Company 900 NC 86 North, Hillsborough, NC 27278 Company Name Address Phone No. Justification Optional Deduct Items removed from the project after design. Unforseen conditions related to Industrial type doors, stainless steel plate at primary treatment unit, unknown conflict for communication fiber at East electrical building and Main power transformer pads requirements added by Oncor. Unknown buried utilities resulting in additional work for removal and shoring for impacted construction sequencing. Switching from low bidder for instrumentation equipment to match existing equipment. Refurbishment of existing BFP equipment to include additional work. SUMMARY Original Bid Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan, Adj./Change Order: New Contract Time: Submitted for Approval Amount % Change $1071351,712.60 $107,351,712.60 $0.00 0% $615,302.02 0.6% $615,302.02 0.6% $1071967,014.62 $615,302.02 975 57 1032 Prepared By: Signature Printed Name, Title, Company Date Approvals Contractor: Signature Printed Name, Title, Company Date City Project Manager: Signature Printed Name, Title Date Mayor/City Manager Signature Printed Name, Title Date Page 2 of 2 Project Name: Brushy Creek Regional Wastewater System — East Plant Quan. Adj./Change Order No.: CO-01 Change Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment PCM-005 ternative Analytical Instruments Manufacturer 1 1 $52,734.36 $52,734.36 0 PCM-007 Modifications to Alum. chemical feed 1 1 $5,254.06 $5,254.06 0 PCM-009 PTU Dumpster Track Plate Material 1 1 $17,867.94 $17,867.94 0 PCM -013 Hurricane rated doors vs Torrnado rated 1 1 $35,126.00 $35,126.00 0 PCM-014 Plant NPW Pumps to Remain 1 1 $2,496.63 $2,496.63 PCM-015 Fiber Optic Re -Route at East Electrical Building 1 1 $13,455.86 $13,455.86 0 PCM-016 Oncor Transformer Pad Piers Addition 1 1 $10,538.35 $10,538.35 1 PCM-023 Additional Walls at AB 1 & 2 1 1 $7,687.22 $7,687.22 1 PCM-025 Flow Meter Manufacturer Change 1 1 $1,685.67 $1,685.67 0 PCM-026 AB3 - Removal of Duct Banks 1 1 $15,000.00 $15,000.00 30 PC9-027 NPW Yard Piping at Se to e Station 1 1 $5,F331.65 $5,331.65 1 CMR-2 Electrical & Comms Relocation 1 1 $13,455.86 $13,455.86 0 CMR-4 PTU Pier Casing 1 1 $55,610.17 $55,610.17 10 CMR-6 Additional Conduits per RFI 18 1 1 $9,867.93 $9,867.93 7 CMR-7 Electrical assitance to Plant staff 1 1 $1,241.30 $1,241.30 0 CMR-8 Existing Duct Exploration 1 1 $2,668.98 $2,668.98 0 CMR-9 Belt Filter Refurbishment 1 1 $365,280.04 $365,280.04 0 CMR-10 Added onstruction Days Due to Weather February 2021 1 1 $0.00 $0.00 7 TOTALTAI $6151,302.02157