CM-2021-165 - 6/4/2021Page 1 of 3
Contract Quantity Adjustment/ Change Order
rw.outs
Department: Transportation
Project
Name: 13001.01 University Blvd Widening Date: 5/20/21
City Project Change Order/Quantity
ID Number 13001.01 Adjustment No. 2
Vendor DeNucci Constructors LLC 8310 Capital of TX Hwy N Ste 275 Austin TX 78731 512-335-0600
Company Name Address Phone No.
Justification
REF COP #2 (Attached) Lowering of existing utilities and irrigation manifold conduit run. During construction of CONN 01 Road, DeNucci ran
into a substantial utility conflict running north - south through the proposed west end of the connector road. This conflict consisted of multiple
conduit runs, with a total of 73 wires connecting to the irrigation main mainfold for the entire strip mall west of the connector road.
Subsequently, this entire 47 LF run had to be removed, and lowered 2.5 LF. This work inlcuded removal of existing, trenching new run, replacing
materials to enable longer run length, and then connecting and testing all 73 wires to ensure irriggtion funcitoned, finally backfilling, and
finishing the construction of the CONNOI road. A small road crew was put on this work which took one week to finish. REF COP #5 (Attached)
While costa Img SOL L-5, DeNucci encountered an existing 8" C900 WL running south at roadway STA 656+90 confl,cting with proposed FL of
SDL L-5. CoRR instructed DeNuccci to lower this WL making way for proposed SDL L5, similar to WL lowering work completed at N Mays St. near
Chase Bank. During a daytime shutout, DeNucci removed existing 8" WL pipe at the tee, using MJ restraint and 45 deg DI fittings, DeNucci
installed 24 LF of 8" DI WL through solid rock 4 LF lower to avoid conflict with SDL L-5. This work took one day to complete.
SUMMARY
Ongina Contract Price;
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus Quantity
Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Amount
% Change
$12,028,913.00
$9,378.05
_
$0.00
$9,378.05:
�
$12,038,291.05
$32,468.50
0%
$25,960.51
0%
$58,429.01
0%
$12,096,720.06._---�
.
$67, 807.06
Original Contract Time: 760
Time Adjustment by previous Quan. Adj./Change Order: 5
Time Adjustment by this Quan, Adj./Change Order: 6
New Contract Time: 771
MWIftoW11 _
Prepared 8y: + Paul DeNucci DeNucci, Office Engineer, DeNucci Constructors LLC 5f 20 21
Signature Printed Name, Title, Company Date
AMINO AM— A
Contractor: . Paul DeNucci Manager, DeNucci Constructors LLC 5120121
Signature Printed Name, Title Date
Ury Project i
Manager �4
--- —
Signature Printed Name, Title Date
Mayor/City t
Manager
Signature Printed Name, Title Date
�Q- -2-v2a-(S
Pagc 2 or3
P"!.a�"w Contract Quantity Adjustment/Change Order
red, 01; 16
Project Name: 13001.01 University Blvd Widening
Quan. Adj./Change Order No.
Change Order Data
Item #
Item Description
Unit
Unit Price Amount
Contract
Time
Adjustment
fnawcl
1
Per attached COP #2
LS
1
$18 143.30
$18,143.30
5
2
Per attached COP #5
LS
1
$7,817.21
$7,817.21
1
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0m
$0,00
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS:
$25,960.51
fi
Page 3 of 3
,auo*- luy Contract Quantity Adjustment/ Change Order
m. 01.16
Project Name: 0001.01 University Blvd Widening
Quan. Adj./Change Order No
Ouantity Adiustment Data
Bid Item #
Item Description
Unit
Ty.
Unit Price
Amount
Contract
Time
Adjustment
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.001
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
CHANGE ORDER PROPOSAL
Contractor: DeNucci Constructors, LLC
Project Name: 13001.01 University Blvd.
Change Order Proposal Number. 2 Date: 3/5/2021
Description:
Labor.
Material
SubcontractorsNandors:
Material Unit Pricing
Equipment:
Lowering of existing utilities and Irrigation manifold conduit run. During construction of CONN 01 Road, DeNucct
ran into a substantial utility conflict running north - south through the proposed west end of the connector road.
This conflict consisted of multiple conduit runs, with a total of 73 wires connecting to the Irrigation main mainfold
for the entire strip mail west of the connector road. Subsequently, this entire 47 LF run had to be removed, and
lowered 2.3 LF. This work Intruded removal of existing, trenching now run, replacing materials to enable longer run
length, and then connecting and testing all 73 wires to ensure Irrlagtlon funcitoned, finally backfiiling, and finishing
the construction of the CONN01 road. A small road crew was put on this work which took one week to finish.
Position Quantity RT Mrs OT Mrs RT Rate OT Rate Total
Superintendent
WLIGIi Foreman
1
50
$42.50
S63.75
$2125.00
Oorators
1
50
1
$21.50
$32.25
$1 075.
Pipe Layam
0
$22.00
S33.00
50.00
00
Laborers
3
So
$20.00
$30.00
$3.000.00
Concrete Superintendent
0
$0.00
$0.00
$0.00
Concrete Farm Setter
0
$0.00
$0.00
$0.00
Concrete Finisher
0
$0,00
1 SO.00
1 $0.00
Truck Driver
0
1 $0.00
1 $0,00
1 $0.00
auuRnal ao.a741.vu
Description Ouanti Unit Rate Total
Materials per attached $1,753,93
$0.00
SO.OD
$0.00
$0,00
$0,05
Subtotal $1.753,93
Total
Descriotlon Ouantily Unit prirA TAW
auototal su.uu
Operating
flnerrinTinn A-nNlu I rn11 Cneilrlav CLJWA 0sre T-rar
304 Mini Excavator
25
MR
S22.45
S56125
0
MR
$0.00
$0.00
0
MR
50.00
SO.OD
0
MR
$0.00
S0.00
0
MR
$0.00
$0.00
$0.00
avolmop NPO1 9.7
Labor
$8,460.00
Labor Burden
55%
$4.647 50
Labor P 3 O
25%
$2,112.50
Material
$1.753.93
Material P 3 0
25%
$438.48
Subcontractor
$0.00
Subcontractor P h O
25%
$0.00
Bid Item
$0.00
Equipment
$561.25
Bond
1%
$179.64
TOTAL
$18.143,30
Additional days requested: 0
CHANGE ORDER PROPOSAL
Contractor: DeNucci Constructors, LLC.
Project Name: 13001.01 University Blvd Widening
Change Order Proposal Number: 5 Date: 4/20/2021
Description:
Labor:
Material
SubcontractoreNandms:
Unit Pricing
Equipment:
While Installing SDL L-5, DeNuccl encountered an existing r C900 WL running south at roadway STA 656+90
conflicting with proposed FL of SDL L-6. CaRR instructed DeNucccl to lower this WL making way for proposed SDL
1-5, similar to WL lowering work completed at N Maya St near Chase Bank. During a daytime shutout, DeNuccl
removed existing 8" WL pipe at the tee, using MJ restraint and 46 deg DI fittings, DeNucci Installed 24 LF of 8" DI WL
through solid rock 4 LF lower to avoid conflict with SDL L-5. This work took one day to complete.
Pesillon nuanlily PT Mrs AT Hm AT Rala rfT Ram Tn1.1
Superintendent
Uli' Foremen
1
12
$42.50
$63.75
$510.00
operators
2
12
$21.50
$32.25
S51 e.00
Pipe Layers
2
12
$23.00
$34.50
$552 00
Laborers
2
12
$20.00
$30.00
$480 00
Concrete Superintendent
0
$0.00
$0.00
0.00
Conaele Form Setter
0
$0.10
50.00
$0.00
Concrete Finisher
0
60.00
t0.00
$0100
Truck Driver
0
S0.00
1 $0.00
1 $0.00
. UW.0181 *d'ooV.W
Total
Description Quantity Unit Price Total
$0.00
0.00
$0.00
0o
s0.00
$0.00
Subtotal S0.00
Operating
naseAnllnn nuAnlily I lnil Cnet1DAV FHWA Pale 7AIAl
0
HR
$0.00
$0.00
0
HR
$0.00
50.00
HR
0
0
HR
S0.00
50.00
0
HR
S0.00
$0.00
$0.00
,ueloml SU.vu
Labor
$2.658.00
Labor Burden
55%
$1,461 90
Labor P & 0
25%
W" 50
Material
$2.364 33
Material P 8 O
25%
$591.08
Subcontractor
$0.00
Subcontractor P 6 O
25%
$0.00
Bid Item
$0.00
Equipment
$0.00
Bond
1%
$77.40
TOTAL
$7,517 21
Additional days requested: 1
SenMark Supply Company Inc.
Branch: 08 Liberty Hill
PO Box 198
Midland, TX 79702
432-682-6584
Bill To:
DeNucci Constructors LLC
9310-1 Capital of Texas Highway
Ste 275
Austin, TX 78731
Customer ID: 104667 - ss- l
INVOICE
INVOICE
3256349
Invoice Date
Page
12/3/2020 16:51:38
1 oft
ORDER NUMBER
1293722
Ship To:
DeNucci Constructors LLC
8310.1 Capital ofTexas Highway
Sic 275
Austin, TX 78731
USA
M14
PO Number
Term Description
Net Due Date
Disc Due Date
Discount Amount
University 2800 Oak Mount 40166
Net 30
Irm021
=021
0.00
Order Date
Pick Ticket No
Job Name
Taker
12rMO20 08:30;11
2259237
JOHNSONA
Qumrtitlu
frenlID
frem Description
Prtclnq
170M
sou
flat!
JW"
l
&fended
Nke
I
Orderad
Sktppad
Rearatnfnp
VON
tlnit Site
I
Carrier:
Tracking A-
140 140 0 FT
40-M
FT
41500
679.00
1.0
6" Semi) PVC Pipe BE
1.0000
120 120 0 FT
40-020
FT
1.4400
172.80
1.0
2" Sch40 PVC Pipe BE
1.0000
8 8 0 EA
406-020
EA
118880
is 10
1.0
2 PVC 90 ELL SOC SCH40
1.0000
----
_
I 1 0 EA
705C QT
EA
22.0000
22.00
1.0
703 Clear Cement Quart
1.0000
1 1 0 EA
P68P-QT
EA
22.0000
22.00
1.0
P68 Purple Primer Quart
L0000
Sitipment Accepted By:
.
Total Lour: S
SUB -TOTAL: 910.90
TAX: 0.00
AMOUNT DUE: 910.90
S
ONGINAL
u.f.nr. rrrrumio
BenMark Supply Company Inc.
Branch: 08 Liberty Hill
PO Box 198
Midland, TX 79702
432.682-6584
Bill To:
DoNuccl Constructors LLC
8310.1 Capital of Texas Highway
Ste 275
Austin, TX 7873I
4-ol (V(p - 7,� 1
Customer ID: 104667
INVOICE
INVOICE
3256720
Invoice Date
I Page
12/81202016:45:43
1 l of 2
ORDER NUMBER
1294302
Ship To:
DeNueci Constructors LLC
8310-1 Capital of Texas Highway
Ste 275
Austin, TX 78731
USA
AOS,T
FO
$` 4-3.03
Ordered BY: Mr. Raul Esparta 9A
PO Number
Ternr Description
Net Due Date
Disc Due Date
Discount Afnount
University Project - 40166
Net 30
IM/2021
1/7/2021
0.00
Ordtr Date
Pick Ticket No
Job Name
Taker
12/8/2020 09:29:19
2259624
JOHNSONA
Qunnflflas
hem ID
!fens Desulpflon
Pricing
VON
Unlf Sigel
Unk
prkt
Esfended
Prke
Ordered
Shipped Rennrining
U0M
Unlf Sire
Carrier: Tracking d:
1 1 0 EA 447-012 EA 0.9250 0.93
1.0 1.1/4 PVC CAP SOC SCH40 1.0000
1 1 0 EA 447-015 $A 1.0100 1.01
1.0 1.112 PVC CAP SOC SCH40 1.0000
I
1
0 EA
447-005
EA
0.3350
0.36
1.0
112 PVC CAP SOC SCH40
1.0000
20
20
0 FT
40-015
FT
1.0600
21.20
1.0
1-1/2' Sch40 PVC Pipe BE
1.0000
20
20
0 FT
40.012
FT
0.9DOD
18.OD
1.0
1-1/4' Sch40 PVC Pipe BE
t.0000
IDO
t00
0 FT
40-DO7
FT
0.4620
46.20
1.0
3/4' Sch40 PVC Pipe BE
1.0000
IDO
100
0 FT
40-ODS
FT
0.3950
38.50
1.0
1/2" Seh40 PVC Pipe BE
1.0000
I
1
0 EA
429-012
EA
0,6920
0.69
1.0
1-IA PVC COUPLING SOC SCH40
1,0000
I
1
0 EA
429.015
EA
0.7400
0.74
1.0
1-1/2 PVC COUPLING SOC SCH40
a
1,0000
I
1
0 EA
429.007
EA
0.2840
0.28
1.0
314 PVC COUPLING SOC SCH40
®
1.0000
I
1
0 EA
437-166
EA
1.0100
1.01
1.0
1.114X1/2 PVC RED BUSH
SPIGOTXSOC
1.0000
SCH40
ORIGINAL
12.3.113, II11U20ta
BenMark Supply Company Inc.
Branch: 09 Liberty Hill
PO Box 198
Midland, TX 79702
432.682-6584
INVOICE
INVOICE
3256720
Invoice Date
Page
12/8/2020 16:43:43
2 cf 2
ORDER NUMBER
1294302
Quantities
Prfe/nR
Ifenn !D
lien, Ducrlpflon
UOM
Unff
1wre
8xtended
P&IF
UOM
Ordered S1FW ed
Unf,Slte Rerrmtnfn�p
+�
UnkSke
I 1 0 EA
401-012
EA
1.3160
132
1.0
1.114 PVC TEE SOC SCH40
Q
1.0000
1 1 0 £A
401.01$
EA
1,6000
1.60
1.0
1.112 PVC TEE SOC SCH40
®
I.0000
1 1 0 EA
437-210
EA
1,0700
1.07
1.0
1-112MM PVC RED BUSH
SPICOTXSOC
1.0000
SCH40
_
2 2 0 EA
406.005
EA
0.3160
0.63
1.0
112 PVC 90 ELL SOC SCH40
®
LODW
2 2 0 EA
406-007
EA
0.3520
0.70
1.0
314 PVC 90 ELL SOC SCH40
®
1.0000
2 2 0 EA
107BC
EA
7.2025
14.41
1.0
61N RND ICV BONCOVER
1.0000
56 56 0 CA K2 EA 0.9906 55.47
1.0 K2 Wire Connector 1,0000
Ordered As: 10222
7 7 0 EA GTSR EA 0.9300 6.31
1.0 N 10-018 Filled Connector 1.0000
SO 50 0 FT 14.1 WHIT&2500 FT 0.2480 1240
1.0 14 Gauge Wire White25008 1.0000
2,500 2,500 0 I'T 14-1 RED-2S00 FT 0,2490 620.00
1.0 14 Coup Red 250011 i.0000
Shipment Accepted By: Raul Esparta
�J
Total Liner: 21 SUB -TOTAL: 843.03
TAX: 0.00
AMOUNT DUE: 843.03
ORIGINAL
BenMark Supply Company Inc.
Branch: 08 Liberty Hill
PO Box 198
Midland, TX 79702
432.682.6584
Bill To:
DeNucci Constructors LLC
8310-1 Capital of Texas Highway
Ste 275
Austin, TX 79731
40166-221
Customer ID: 104667 .
INVOICE
INVOICE
3269275
Invoice Date,- _ Page
3/23/2021 16:47:19� T Tl of 2
ORDER NUMBER
1308930
Ship To:
DcNucci Constructors LLC AUK,
8310-1 Capital of Texas Highway
Ste 275
Austin, TX 78731
33
USA Ordered By: Mr. Arturo Carillo��" r
PO Number
Term Description
Nei Due Date
Disc Due Date
Discount Amaunt
University Change Order-3/2312021 15:14:38
Net 30
4/22/2021
4/22=1
0.00
Order Dare
Pick Ticket No
Job Name
Taker
3/23/202115:12.45
2272537
THOMPSONT
Quanddes
p►tchaA
Item ID tlou
Item Deacdpdon
Untf stu
170
tc
p ,
Euended
pace
Ordered
Shtppad
Renmlel rg
UOu
tlatr s$e
Carrier.
Tracking 0:
40
40
0 FT
D1350.080
FT
24.5000
980.00
1.0
8" CI.35D DI Pipe
1.0000
4
4
0 EA
DMB84S
EA
79.1200
316.49
1.0
8' Mi 4S Bend
1.0000
I
1
0 EA
DMLS
EA
99,6164
99.62
LO
8" MJ Long Sleeve
1.0000
2
2
0 EA
EZPVCUP08
EA
63.9956
13197
1.0
8" MI Restraint Pack C900 Pipe
1.0000
NEXT GEN
Ordered As: EZPVCP8
9
9
0 EA
EZDP8
EA
57.2208
514.99
1.0
8" MI Restraint Pack - DI
1.=
1 1 0 EA WRP-19200E EA 88.0000 88.00
1.0 29" x 20V Poly Wrap 8mil Black 1.0000
1 1 0 EA TAPE-12W EA 100.0000 100.00
1.0 Buried Water Line Tape 12' x IOW 1.09M
I 1 0 EA SIPFA8 EA 133.2702 133.27
1.0 8' Foster Type Adapter 1.0000
ONGINAL
U.,.ru. ru1+noiu
BenMark Supply Company Inc.
Branch: 08 Liberty Hill
PO Box 198
Midland, TX 79702
432-682-6584
INVOICE
_ INVOICE -
3269275 -1
Invoice_D_ale _ Page
3/23/2021 16:4_7:19 2 of 2 ;
R _ .ORDER NUMBER
I
---1308830
Qaanddes
PWIV
Item ID
Item Descripdaa
VON
Uny
Prtce
Es*n*d
price
UOM
O_k d
Ststppsd
Fe�n,rinl+rF
tlolf Stq
Uedf Stu
Shipment Accepted By: Arturo Carillo
Total Lines: 8
SUB -TOTAL: 2.364.33
TAX: 0.00
AMOUNT D UE: 2,364.33
ORIGINAL
11,.u3. urunmo
y' ri It.
l
� w
i
Y 1
LEI _ �• , A
5 + A
•k � � k �aFsl7TC3Eli'�i N
r
'69 + : ;5 ttit
ED
_ _+,i_� . `._�. _ -• '� �t•J•In!erstate_35`.� -_�
City of Round Rock
IOUND ROCK
xAs Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 2 with DeNucci
Constructors LLC for the University Blvd Widening - IH 35 to Sunrise Road Project
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 6/4/2021
Dept Director: Gary Hudder, Transportation Director
Cost: $25,960.51
Indexes: RR Transportation and Economic Development Corporation (Type B)
Attachments: QA-CO#2_partexec, Google_earth_univ_blvd
Department: Transportation Department
Text of Legislative File CM-2021-265
The City entered into a contract with DeNucci Constructors to widen University Blvd. and an NTP was
issued with a date of November 10th, 2020.
In the course of performing the job tasks a conflict with the City's 12-inch water line was discovered. In
change order #1 DeNucci Contractors lowered approximately 40 linear feet of the ductile water line. A fire
hydrant was also removed and replaced with a new hydrant. The quantity adjustments were in the amount
of $9,378.OS and the change order amount is $32,468.55 for a total contract adjustment of $41,846.55.
In Change Order #2, DeNucci lowered and rebuilt the irrigation system running behind the ICU Building
during the construction of the cut through street. New irrigation wiring, testing and fittings were used. Also
in this change order DeNucci Contractors lowered an 8-inch waterline that was in conflict with a storm
sewer line. The contractor installed 24 feet of Ductile Iron water line in solid rock and used MJ fittings to
replace the line and tie-in to the existing water line. Thus removing the conflict. The amount of this change
order is $25,960.51.
The original contract amount is $12,028,913.00. The cumulative total for QA/CO #1 and #2 on this project
is $67,807.06 which represents a 0.56% increase in the initial contract amount.
Cost: $25,960.51
Source of Funds: RR Transportation and Economic Development Corporation
City of Round Rock page 1 of 1