Loading...
R-2021-153 - 6/10/2021RESOLUTION NO. R-2021-153 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Ritter, Botkin Prime Construction Company, Inc. for the Heritage Trail West Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Ritter, Botkin Prime Construction Company, Inc. for the Heritage Trail West Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 5 51, Texas Government Code, as amended. RESOLVED this 1 Oth day of June, 2021. CRAIG JORGA�(, Mayor City of Round R ck, Texas ATTEST: WAIL, if vu SARA L. WHITE, City Clerk Ol 12.20212, 00473062 It" CaK It aA S rev. 01116 Department: Project Name: City Project ID Number Vendor Justification EXHIBIT "A / A �1 I Nugr I of Z ��1 Contrail Quantity Adjustment/Change Order PARR Heritage Trail West Date: 4/12/21 Change Order/Quantity Adjustment No. 2 Prime Construction 9-m-pany, Inc. 20907 Martin L. Pflugerville, TX 78660 512.244.7799 Company Name Address Phone No. ;ee attached Change Order Summary Report and backup documentation SUMMARY Amount % Change Original Contract Price. $7,274,622.98 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $71274,622.98 Previous Change Order(s): $0.00 0% This Change Order: $68,627.00 1% Total Change Order(s) To Date: $681627.00 1% Adjusted Contract Price (Original Contract Price Pius Quantity Adjustment(s) Plus Change Order(s)): $71343,249.96 , Difference between Original and Adjusted Contract Prices: $68,627.00 Original Contract Time: 548 days Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: 4 days (weather) New Contract Time: 552 da s Submitted for Approval Prepared By: Sypture Printed Name,title, Company Date t t u, Ajgmvais ;:. Contractor: -,Drew Botkin, Vice President, Prime Construction Company Inc. 04/26/2021 Signature Printed Name, Title, Company Date City Project - 11.14, Z&�f� P]0�- Manager: Lt �jtflj: PDX "gnature Printed Name, Title Date Mayor/City Manager Signature - Printed Name, Title Date Contract Quantity Adjustment/Change Order aftwo 00" oft oi. I Project Name: Heritage Trail West Quan. Adj./Change Order No.: Chanoe Order Data Page 2 of 3 Item # � Item Description UnIt �.. Unit Price _ Contract Time Adjustment ..._ Amount 1 Add Walls to Chishol rail Park LS $54,600.00 $54 600.00 2 Remove Light Poles and Bases LS 134000.00 $3 000.00 3 Roc Boulders at box culvert LS 1 19,F 156.00 9 156.00 p 4 Extend wall height at event lawn LS 1 13 160.00 13 160.00 5 Remove Art Base Pedestals from sco a LS 1 - 11 289.00 - 11 289.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ---- ---- 0.00 0.00 0.00 0.00 0.00 0.00 10-00 $0.00 0.00 $0.00 0.00 - --------- 0.00 IMP 0.00 VT L bps 627.00 0 Page 3 of 3 Contract Quantity Adjustment/Change Order wawoRoaK + ► Project Name_ Heritage Trail West Quan. Adj./Change Order No.: 0 g AMMM6 z; Trd I I WL; ot r. A40%1h 09% MOP% qMMaoomft 1A1P%� AFONJ%IRo--Fffi AWWMn ddb M9ftIM o%A M R NJ1# Mon Y phase of construction as follows: Add Walls to Chisholm Trail Park,: The trail cuts through the area around the Cows in the Creek Sculptures. Originally, theft plans cathe mftra9lled for din to naturaBly feather out with minimal walls do required, However,, after construction began,, it was apparent that walls would tee needed to protect the sculptures and eliminate unnecessary grading, Cost: 554,600.00 inele�ded Remove Light Poles and Basesip0 The contractdeneo of light poles and bases, however there wasn't a bid item associated with that scope of work. 71 * 1 1411 Rock/Boulders at Box Culvert,: The trail under I-35 runs adjacent to the creek. The contractor noticed that anytime the creek floods the trail would be in danger of washing out or being undercut by the rushing water.. Ic os necessary to armor the trail edge and dowr►slope side of the trail to decrease erosion and damage from future floods,. Cost: 59,155.00 ir• Y qM!r .. Total this Change Orders, $68,627.00 s r f � N-�a� � ..• � i � l 9 =?�• *iY n� t r, y ♦� � T a3. � .' S �` E~ t � t .. 4 �� {'. N ci 1 1j I.;i.. / ..fr +� �.�y:.ti 4 L> 'a vy -y, � � ,•,� ate lefotes lo s � Copt �I�Ce Ipmamact IV u v Transfer of cost 5�.�0 A savin5 /credits to betterment line it e m -•S �• i g PAr%Lj (y� H'm e A AM goro i S h f ``�y ' i y x APPvaApprvl i st c o- 7w n # t> b S .S ! 4^�� % �5J 'S i F 3 :u fr_ �: 5 r 9 c �• w y .¢.'Y � L i f: