CM-2021-170 - 6/11/2021Page 1 of 3
Contract Quantity Adjustment/Change Order
m, ouie
Department:
Project
Name: Northeast DowntownRevitalization Date: 5/24121
Change Order/Quantity
RHB20 Adjustment No. 1
Cash Construction 217 Kingston Lacy Blvd. - Pflugerville, Texas 78660 (512) 251-7872
Company Name Address Phone No.
City Project
ID Number
Vendor
Justification
UES
Change Order No. 1 is for abatement of Asbestos Concrete Pipe
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price (Original Contract Price Plus Quantity Ad)ustments) Plus Change
Order(s)):
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
Amount
$7,823,780.00
$0.00:
$0.00 t
$7,823,780.00
$0.00
$28,489.20
$28,489.20
$7,852,269.20
$28,489.20
% Change
0%
0%
0%
New Contract Time: 0
Submitted for Avoroval
Prepared BY Eddie Zapata, Senior Project Manager, City of Round Rock 5124121
Si nature Printed Name, Title, Company Date
Approvals
Contractor: 1 1 1 Michael Stevens, Project Manar_er. Cach f-nn,.tmrtinn -{ ! ., r
Printed Name, Title, Company
City Proj�
Manager:
Mayor/City
Signature
6&,(,--2-&2J-(-70
Eddie Zapata, Senior
Printed Name, Title
6�q (- z 1
P�J!" . ,
Contract Quantity Adjustment/Change Order
-I),*— FFM14*OYI i FhS
R . 6VA
Project Name: Northeast DowntownRevitalization
Quan. Adj./Change Order No.
Chanae Order Data
Contract
Time
Adjustment
F
AC Pipe Re��
F'w 3 of 3
Contract Quantity Adjustment/Change order
■Pl`Ai{Y} '(�5
"w Ouk
Project Name: Northeast DowntownRevitalization
Quan. Adj./Change Order No.:
uantity Adiustment Data
Contract
Time
Adjustment
H
Z
W
2
W
Q
m
a
w
Z
J
W
Q
H
Z
W
2
W
C�
O
H
U)
w
m
a
zQ
ROUND ROCK
City of Round Rock
TEXAS Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 1 with Cash
Construction for the Northeast Downtown Infrastructure Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 6/11/2021
Dept Director: Michael Thane, Utilities and Environmental Services Director
Cost: $28,489.20
Indexes: RR Transportation and Economic Development Corporation (Type B);
Self -Financed Stormwater Construction; Self -Financed Wastewater Construction;
Self -Financed Water Construction
Attachments: QA.CO No.1-partially executed, Map
Department: Utilities and Environmental Services
Text of Legislative File CM-2021-170
In 2016, the City of Round Rock adopted the Downtown Improvement Plan which serves as a planning
document for the proposed future downtown roadway and utility infrastructure. Since that time, the City
has been undertaking projects based on the Downtown Improvements Plan to improve the downtown
area.
This project involves the installation of new water and wastewater lines, installation of a new stormwater
system, construction of an underground dry utility duct bank, and construction of right-of-way (ROW)
improvements needed in the northeast downtown area. The construction of the ROW will be in accordance
with the DIP and include roadways, sidewalks, brick pavers, and streetlights. The stormwater system will be
constructed northerly on Sheppard Street all the way to Brushy Creek.
The project area includes two blocks of East Austin Avenue and East Liberty Street between Mays Street
and Sheppard Street. The project also includes Lampasas Street and Sheppard Street between East Liberty
Street and East Austin Avenue. The proposed utility and roadway improvements will revitalize the
northeast section of downtown Round Rock and support future development. The improvements will also
benefit the new library site located in the northeast area with the infrastructure needed to support it.
On September 23, 2020, the department received six bids for the Northeast Downtown Infrastructure
City of Round Rock Page 1 of 2
Agenda Item Summary Continued (CM-2021-170)
Improvements project, and awarded the contract on October 22, 2020 to Cash Construction, Inc. for
$7,823,780. Change Order No. 1 is needed for removal and disposal of asbestos -cement (AC) water pipe
along Sheppard Street. Change Order No. 1 is in the amount of $28,489.20 which will increase the contract
price to $7,852,269.20.
Cost. $28,489.20
Source of Funds: RR Transportation and Economic Development Corporation (Type B), Self -Financed
Stormwater Construction, Self -Financed Wastewater Construction, Self -Financed Water Construction
City of Round Rock Page 2 of 2