CM-2021-170 - 6/11/2021Page 1 of 3 Contract Quantity Adjustment/Change Order m, ouie Department: Project Name: Northeast DowntownRevitalization Date: 5/24121 Change Order/Quantity RHB20 Adjustment No. 1 Cash Construction 217 Kingston Lacy Blvd. - Pflugerville, Texas 78660 (512) 251-7872 Company Name Address Phone No. City Project ID Number Vendor Justification UES Change Order No. 1 is for abatement of Asbestos Concrete Pipe SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Ad)ustments) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: Amount $7,823,780.00 $0.00: $0.00 t $7,823,780.00 $0.00 $28,489.20 $28,489.20 $7,852,269.20 $28,489.20 % Change 0% 0% 0% New Contract Time: 0 Submitted for Avoroval Prepared BY Eddie Zapata, Senior Project Manager, City of Round Rock 5124121 Si nature Printed Name, Title, Company Date Approvals Contractor: 1 1 1 Michael Stevens, Project Manar_er. Cach f-nn,.tmrtinn -{ ! ., r Printed Name, Title, Company City Proj� Manager: Mayor/City Signature 6&,(,--2-&2J-(-70 Eddie Zapata, Senior Printed Name, Title 6�q (- z 1 P�J!" . , Contract Quantity Adjustment/Change Order -I),*— FFM14*OYI i FhS R . 6VA Project Name: Northeast DowntownRevitalization Quan. Adj./Change Order No. Chanae Order Data Contract Time Adjustment F AC Pipe Re�� F'w 3 of 3 Contract Quantity Adjustment/Change order ■Pl`Ai{Y} '(�5 "w Ouk Project Name: Northeast DowntownRevitalization Quan. Adj./Change Order No.: uantity Adiustment Data Contract Time Adjustment H Z W 2 W Q m a w Z J W Q H Z W 2 W C� O H U) w m a zQ ROUND ROCK City of Round Rock TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Cash Construction for the Northeast Downtown Infrastructure Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/11/2021 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $28,489.20 Indexes: RR Transportation and Economic Development Corporation (Type B); Self -Financed Stormwater Construction; Self -Financed Wastewater Construction; Self -Financed Water Construction Attachments: QA.CO No.1-partially executed, Map Department: Utilities and Environmental Services Text of Legislative File CM-2021-170 In 2016, the City of Round Rock adopted the Downtown Improvement Plan which serves as a planning document for the proposed future downtown roadway and utility infrastructure. Since that time, the City has been undertaking projects based on the Downtown Improvements Plan to improve the downtown area. This project involves the installation of new water and wastewater lines, installation of a new stormwater system, construction of an underground dry utility duct bank, and construction of right-of-way (ROW) improvements needed in the northeast downtown area. The construction of the ROW will be in accordance with the DIP and include roadways, sidewalks, brick pavers, and streetlights. The stormwater system will be constructed northerly on Sheppard Street all the way to Brushy Creek. The project area includes two blocks of East Austin Avenue and East Liberty Street between Mays Street and Sheppard Street. The project also includes Lampasas Street and Sheppard Street between East Liberty Street and East Austin Avenue. The proposed utility and roadway improvements will revitalize the northeast section of downtown Round Rock and support future development. The improvements will also benefit the new library site located in the northeast area with the infrastructure needed to support it. On September 23, 2020, the department received six bids for the Northeast Downtown Infrastructure City of Round Rock Page 1 of 2 Agenda Item Summary Continued (CM-2021-170) Improvements project, and awarded the contract on October 22, 2020 to Cash Construction, Inc. for $7,823,780. Change Order No. 1 is needed for removal and disposal of asbestos -cement (AC) water pipe along Sheppard Street. Change Order No. 1 is in the amount of $28,489.20 which will increase the contract price to $7,852,269.20. Cost. $28,489.20 Source of Funds: RR Transportation and Economic Development Corporation (Type B), Self -Financed Stormwater Construction, Self -Financed Wastewater Construction, Self -Financed Water Construction City of Round Rock Page 2 of 2