Loading...
R-2021-183 - 7/8/2021RESOLUTION NO. R-2021-183 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Company, Inc. for the Northeast Downtown Infrastructure Improvements Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Cash Construction Company, Inc. for the Northeast Downtown Infrastructure Improvements Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 5 51, Texas Government Code, as amended. RESOLVED this 8th day of July, 2021. CRAIG MORGA#, Mayor City of Pound 46ck, Texas ATTEST: SARA L. WHITE, City Clerk 0112.20212-1 00475438 EXHIBIT Page I of Contract Quantity Adjustmer*/Change Order rw ot,/16 D"arM*nt: LIES Project Name: Northeast DownWwn Revitalization Date: b' 16121 City Project ID Number RH820 Vendor Cash Construction Company Name Change Order/Quantity Adjustment No. 2 217 Kiln Lacy Md. - Ptlu, r ;Alle, Texas 78660 �512� 251-7872 - -le . e..ss..ewe..�w r •----men. .�®� Address Phone No. JustfAcation Change Order No. 21s for additional Fiber Conduit and Appurtanences SUMMARY Amount % Change original Contract Price: 7 823 780.00 Previous Quantity Adjustment(s): This Quantity Adjustment: Total Qwnbty Adjustment(s). Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Ad)usUnent(s) Plus Change Orders)): Werence between Original and Adjusted Contract Prices: $28,489.20 0% $135,567. 5a 2% $164 056. 70 2% 7 987 836.70 $164,056.70 Original Contract Time: Time Adjustment by previous Quart. Adj./Change Order: Tune Adjustment by this Quan. Adj./Change Order. New Contact Time: 0 Prepared By;`- Eddie Za to Senior Pro Mana r O of Round Rock bI16I21. i`lwwah w Printed Name, Title, Company Date Contractor: Michael Stevens, Projed Managers Cash Constructbn Printed Name, Title, Company City Project - ,�` k, Eddie 2d La Senior Pro Mona r Manager: 519 natu Printed Name, Title Mayor/City �f Manager Cra M Mayor signature Printed Narne, TMe Dim Pagc 2 of 3 Ca trsct Quantity Adjustment/Change Order I !Mcwx� _Www 0" Project Name:. Northeast DowntowanRevitalizabon Quan. Adj./Change Order No.: f ka�s ArfIsr Ast's iteea Item on Unit Unk Price Anount I Contract innw Ad UftM nt Ways CO 2-1 Ductbank LF t85 1210.00 38 850.00 CO 2-2 Fumish and Install 4' X 8' X V CORR Handhole Ea. 3 $12 000.OQ 36 000.00 CO 2-3 Furnish and Install W X 4' X 4' CORR Handhole Ea. 1 5 $9 000.00 "S,000.00 CO 2-4 Furnish and Install CORR Riser Ea. 1 $11w.00 $1,600.00 00 2-5 CO 2-6 Conduit PVC SCH 40 - 4" Conduit PVC SCH 40 - 2" LF. L.F. 660 40 $11.00 $7.00 $7 260.00 $280.00 CO 2-7 Trench Excavation Protection LF. 185 $1.50 $277.50 CO 2-8 3000 PSI Concrete CY. 36 $175.00 16,300.00 Page 3 of 3 Contract Quantity Adjustment/Change Order Project Name: Northeast DowntownRevitalizabon Quan. Adj./Change Order No.: Quantft AddusbIMM i rrr r r rr �rrrrr rrr rrr err rrr� rr rrrr rrr rr r� rr �� rr�