Loading...
CM-2021-196 - 7/9/2021Patpe l ni: M. _1-16 Department: Project Name: City Project ID Number Vendor Contract Quantity Adjustment/Change Order Utilities And Environmental Services Kensington Place Astlestos-Cement waterline Replacement Date: 6 23/21 Change Order/Quantity KENAC Adjustment No. 2 SKE Construction LLC PO Box 1111 Cypress, TX 77410 281-585-41DD Company Name Address Phone Na. ]usdflcation After the job was completed we ended up not using all of the quantities estimated for pay items $250 per Ton and it should have been $5 per Ton so this was corrected. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment. Total Quantity Adjustment(s) Total Contract Price vdth Quantity Adjustment(s;: Previous Change Order(s): This Change Order: Total Change Order(s) To Date - Adjusted Contract Price i.Original Contract Price Plus Quantity Adjustment(sj Plus Change Order{s)): Difference between Original and Adjusted Contract Prices: Original Contract Time. Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order New Contract Time: / } City Project Mayor/City and #30. Also, for pay item #15 the unit price on Quantity Adjustment Change Ordertwas Amount % Change $1,672 874.73 $73,611.58 -$125,886.17 $S2,274.59 $1,620,600.14 0% 0% 0% L $1r620,600.14� -$52,274.59 150 150 Eberhar�resldent/CEO, SKE Construction, LLC _ _ 6f2V 1 Name, Title, Company Date 3�Printed Name, Title, Company Date 41 W coi z_ WWII — PW ±arx Item # Item Contract Quantity Adjustment/Change Order Project Name: Kensington Place Asbestos -Cement Waterline Replacement Quan. Adj./Change Order No. Unit I Qty. I Unit Price I Amount Contract Time Adjustment Fd6v 1 .; 1 1-w _I— m,, owl$ Bid item # Contract Quantity Adjustment/ Change Order Project Name: Kensington Place Asbestos -Cement Waterline Replacement Quan. Adj./Change Order No. 2 Unit vain �AIN MC 1 c JlutVVALK KEHAIRS- REPAIRS SHALL BE PERFORMED PER DETAIL DRAWING NO ST-01 SF REMOVE AND REPLACE CONCRETE CURS 4ND GUTTER LF PERFORM TYPE "C"HOT MIX ASPHALTIC CEMENT (HMAC) ROAD REPAIR USING APPROVED MECHANIZED HMAC LAYOUT MACHINERY TON FOR ALL DEPTHS. REMOVE AND REPLACE EXISTING 8" INLINE DUCTILE IRON FITTINGS, NCLUDING MEGALUG RESTRAINTS TON FOR LALDEPHS, REMOVE AND REPLACE EXISTING 8" NLINE DUCTILE IRON FITTINGS. INCLUDING MEGALUG RESTRAINTS TON -8934 -378.5 -117.54 Amount Contract Time Adjustment CERTIFICATE OF INTERESTED PARTIES FORM 1295 1af1 Complete Nos. 1 - 4 and 6 if there are interested parties. Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. OFFICE USE ONLY CERTIFICATION OF FILING Certificate Number: 2021-770324 Date Filed: 06/23/2021 Date Acknowledged: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. SKE Construction, LLC Cypress, TX United States 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Round Rock 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. 000000 City of Round Rock- Kensington Place A/C Waterline Replacement 4 Name of Interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling I intermediary 5 Check only if there is NO Interested Party. X 6 UNSWORN DECLARATION11 2 My name is \ � i and my dale of birth is La� I 3 My address is (street; tJ I (city) (state) (zip code) (country; declare under penalty of perjury that the foregoing is true and correct. ` Executed in y _ Co-.rnty, State of on the cJ ay of MC 20a (month) ;year] Signa4 r of authorized agent contracting business entity (Declarant Forms proviaea oy I exas Ethics Commission www.ethics.state.tx.us Version V1.1.ceffd98a City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with SKE Construction, LLC for the Kensington Place Asbestos -Cement Waterline Replacement Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/9/2021 Dept Director: Michael Thane, Utilities & Environmental Services Director Cost: Indexes: Self -Financed Water Construction Attachments: CiA-CO No. 2—Partially Signed Department: Utilities & Environmental Services Text of Legislative File CM-2022-196 The Kensington Place Waterline project consisted of replacing approximately 14,000 linear feet of six and eight -inch asbestos -cement (A/C) water mains with eight -inch high -density polyethylene pipe. This project is located in the Kensington Place, South Terrace, and South Park subdivisions. These mains installed in the 1970s had a history of breaks and were near the end of their estimated life expectancy. This project replaced the aging A/C waterlines east of South Mays and south of Gattis School Road. Through careful planning and construction practices, the contractor limited the amount of damage done during construction. This change order will remove the additional sidewalk, curb repair, street repair from the project. The City contracted with SKE Construction, LLC on September 24, 2020, for $1,672,874.73. Change Order No. 1 for $73,611.58 brought the contract to $1,746,486.31. The department requests Change Order No. 2 to deduct $125,886.17, bringing the final contract total to $1,620,600.14. Cost: ($125,886.17) Source of Funds: Self Financed Water Construction City of Round Rock Page 1 of 1