CM-2021-196 - 7/9/2021Patpe l ni:
M. _1-16
Department:
Project
Name:
City Project
ID Number
Vendor
Contract Quantity Adjustment/Change Order
Utilities And Environmental Services
Kensington Place Astlestos-Cement waterline Replacement Date: 6 23/21
Change Order/Quantity
KENAC Adjustment No. 2
SKE Construction LLC PO Box 1111 Cypress, TX 77410 281-585-41DD
Company Name Address Phone Na.
]usdflcation
After the job was completed we ended up not using all of the quantities estimated for pay items
$250 per Ton and it should have been $5 per Ton so this was corrected.
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment.
Total Quantity Adjustment(s)
Total Contract Price vdth Quantity Adjustment(s;:
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date -
Adjusted Contract Price i.Original Contract Price Plus Quantity Adjustment(sj Plus Change Order{s)):
Difference between Original and Adjusted Contract Prices:
Original Contract Time.
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order
New Contract Time: / }
City Project
Mayor/City
and #30. Also, for pay item #15 the unit price on Quantity Adjustment Change Ordertwas
Amount % Change
$1,672 874.73
$73,611.58
-$125,886.17
$S2,274.59
$1,620,600.14
0%
0%
0%
L $1r620,600.14�
-$52,274.59
150
150
Eberhar�resldent/CEO, SKE Construction, LLC _ _ 6f2V 1
Name, Title, Company Date
3�Printed Name, Title, Company Date
41 W coi z_ WWII —
PW ±arx
Item #
Item
Contract Quantity Adjustment/Change Order
Project Name: Kensington Place Asbestos -Cement Waterline Replacement
Quan. Adj./Change Order No.
Unit I Qty. I Unit Price I Amount
Contract
Time
Adjustment
Fd6v 1 .; 1
1-w
_I—
m,, owl$
Bid item #
Contract Quantity Adjustment/ Change Order
Project Name: Kensington Place Asbestos -Cement Waterline Replacement
Quan. Adj./Change Order No. 2
Unit
vain �AIN MC 1 c JlutVVALK KEHAIRS- REPAIRS SHALL BE
PERFORMED PER DETAIL DRAWING NO ST-01 SF
REMOVE AND REPLACE CONCRETE CURS 4ND GUTTER
LF
PERFORM TYPE "C"HOT MIX ASPHALTIC CEMENT (HMAC) ROAD
REPAIR USING APPROVED MECHANIZED HMAC LAYOUT MACHINERY
TON
FOR ALL DEPTHS. REMOVE AND REPLACE EXISTING 8" INLINE DUCTILE
IRON FITTINGS, NCLUDING MEGALUG RESTRAINTS TON
FOR LALDEPHS, REMOVE AND REPLACE EXISTING 8" NLINE DUCTILE
IRON FITTINGS. INCLUDING MEGALUG RESTRAINTS TON
-8934
-378.5
-117.54
Amount
Contract
Time
Adjustment
CERTIFICATE OF INTERESTED PARTIES FORM 1295
1af1
Complete Nos. 1 - 4 and 6 if there are interested parties.
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
OFFICE USE ONLY
CERTIFICATION OF FILING
Certificate Number:
2021-770324
Date Filed:
06/23/2021
Date Acknowledged:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
SKE Construction, LLC
Cypress, TX United States
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Round Rock
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
000000
City of Round Rock- Kensington Place A/C Waterline Replacement
4
Name of Interested Party
City, State, Country (place of business)
Nature of interest
(check applicable)
Controlling I
intermediary
5 Check only if there is NO Interested Party.
X
6 UNSWORN DECLARATION11 2
My name is \ � i and my dale of birth is La� I 3
My address is
(street; tJ I (city) (state) (zip code) (country;
declare under penalty of perjury that the foregoing is true and correct. `
Executed in y _ Co-.rnty, State of on the cJ ay of MC 20a
(month) ;year]
Signa4 r of authorized agent contracting business entity
(Declarant
Forms proviaea oy I exas Ethics Commission www.ethics.state.tx.us Version V1.1.ceffd98a
City of Round Rock
ROUND ROCK
TEXAS Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 2 with SKE
Construction, LLC for the Kensington Place Asbestos -Cement Waterline
Replacement Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 7/9/2021
Dept Director: Michael Thane, Utilities & Environmental Services Director
Cost:
Indexes: Self -Financed Water Construction
Attachments: CiA-CO No. 2—Partially Signed
Department: Utilities & Environmental Services
Text of Legislative File CM-2022-196
The Kensington Place Waterline project consisted of replacing approximately 14,000 linear feet of six and
eight -inch asbestos -cement (A/C) water mains with eight -inch high -density polyethylene pipe. This project
is located in the Kensington Place, South Terrace, and South Park subdivisions. These mains installed in the
1970s had a history of breaks and were near the end of their estimated life expectancy. This project
replaced the aging A/C waterlines east of South Mays and south of Gattis School Road.
Through careful planning and construction practices, the contractor limited the amount of damage done
during construction. This change order will remove the additional sidewalk, curb repair, street repair from
the project.
The City contracted with SKE Construction, LLC on September 24, 2020, for $1,672,874.73. Change Order
No. 1 for $73,611.58 brought the contract to $1,746,486.31. The department requests Change Order No. 2
to deduct $125,886.17, bringing the final contract total to $1,620,600.14.
Cost: ($125,886.17)
Source of Funds: Self Financed Water Construction
City of Round Rock Page 1 of 1