Loading...
CM-2021-197 - 7/9/2021SUPPLEMENTAL AGREEMENT NO. 1 TO "CITY OF ROUND ROCK AGREEMENT FOR DEMOLITION AND CONCRETE WORK AT FRONTIER PARK WITH PEREZ CONSTRUCTION. LLC" CITY OF ROUND ROCK § STATE OF TEXAS § COUNTY OF TRAVIS § COUNTY OF WILLIAMSON § KNOW ALL BY THESE PRESENTS: THIS SUPPLEMENTAL AGREEMENT NO. 1 to "City of Round Rock Agreement for Demolition and Concrete Work at Frontier Park with Perez Construction, LLC," called "Supplemental Agreement No. 1," is made by and between the CITY OF ROUND ROCK, TEXAS, a home -rule municipality, with offices located at 221 East Main Street, Round Rock, Texas 78664-5299, hereinafter called the "City" and PEREZ CONSTRUCTION, LLC whose offices are located at 1205 Power Road, Georgetown, Texas 78628, hereinafter called the "Services Provider." WHEREAS, the City and Services Provider previously executed the referenced "City of Round Rock Agreement for Demolition and Concrete Work at Frontier Park," hereinafter called the "Agreement" in the amount of $10,643.50.00; and WHEREAS, the City desires to amend the Scope of Services and Contract Amount to add additional services and costs; and WHEREAS, it is necessary to amend the Scope of Services and increase the Contract Amount provided in the Agreement by $2,600.00 to a total of $13,243.50 as set forth herein; NOW THEREFORE, in consideration of the mutual promises and obligations in the Agreement and this Supplemental Agreement No. I, the City and Services Provider agree that said Agreement is amended and supplemented as follows: I. Section 4.01 of the Agreement is hereby amended to read as follows: 4.01 SCOPE OF SERVICES Services Provider shall satisfactorily provide all goods and complete all services described in Exhibit "A," and the Addendum to Exhibit "A," attached hereto and incorporated 004758271ss2 0A1"2-2! -I GIB herein. This Agreement shall evidence the entire understanding and agreement between the parties and shall supersede any prior proposals, correspondence or discussions. Services Provider shall satisfactorily provide all deliverables and services described in Exhibit "A" of the Agreement and the attached Addendum to Exhibit "A" within the contract term specified. A further change in the Scope of Services must be negotiated and agreed to in all relevant details, and must be embodied in a valid written Supplemental Agreement executed by both parties. II. Section 5.01 of the A reement is hereby amended to read as follows: 5.01 CONTRACT AMOUNT In consideration for deliverables and services related to the deliverables, the City agrees to pay Services Provider Ten Thousand Six Hundred Forty -Three and 50/100 Dollars ($10,643.50) in accordance with Exhibit "A" of the Agreement plus an additional Two Thousand Six Hundred and No1100 Dollars ($2,600.00) in accordance with the attached Addendum to Exhibit "A," for a total not -to -exceed amount of Thirteen Thousand Two Hundred Forty -Three and 501100 Dollars ($13,243.50) for the goods and services set forth in Exhibit "A" of the Agreement and the Addendum to Exhibit "A." This Supplemental Agreement No. I shall amend the original Agreement only as set forth herein with no other changes in terms or conditions of the original Agreement. [Signatures on the following page.] 2 IN WITNESS WHEREOF, the City and Services Provider have executed this Supplemental Agreement No. I to be effective as of the last date of due execution by both parties. CITY OF ROUND ROCK, TEXAS By: Lr Printed Name; C Title: _ �r— Date Signed: --Zj ATTEST: By: *Lff-, fl—% - - - - - Sara L, White, City Clerk FOR CITY, APPROVED AS TO FORM: By: • S*Sheets, City Attorney PEREZ CONSTRUCTION, LLC By: Printed Name: Title: Date Signed: Page t Qf, , tnwn ADDENDUM TO EXHIBIT "A" 2.oru Department: 23000 Project Name: _ Frontier Park Playground Area ConstrucWn Date: 61 28/21 City Project Change Order/Quantity ; 10 Number Adjustment No. 1 Vendor Perez Construction LLC 1205 Power Rd, Georgetown, TX 78628 512-804-8236 Company Name Address Phone No. Justification xisting seatwall concrete will require sawcuttrng not Included in the original scope of the protect. Seatwall on further inspection was not built Koording to construction standards and is Plated ontop of concrete flatwork with no joints, separating flatwork and the seatwall will require thl Iddltional sawcutting. SUMMARY Amount %Change OFIginN COCOW Prrce' $10,6A3.50 Prewous Quantity Adtugnxnt(s)- $0.00 This Quantity AdM9me+V. S0.00 Total Quantity AdAnbnent(s)' $0.00 Total Contract Price with Quantity Adtustment(s) $10,643.50 Previous Change Order(s) $0.00 0% This Change Order: $2,600.00 24% Total Change Ordet(s) To Date: $2,600.00 24% Adjusted Contract Price (Ongrnal Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]' $13,243.50 Difference between Original and Adjusted Contract Prices: $2,600,00 Original Contract Time: 30 days Time Adjustment by Dm+ous Quan. Adj.lChange Order none Tirne Adjustment by this Quan AdjjCharW Order. none New Conlract Time. 30 days Submitted t'br App"wal Prepared By: Chau Park Development 5 Irst CORR 6/23121 �&4Michael Strand Printed Name, Title, Company Date TOM$ Contractor: `RED �wi�cr YQ c �1 W-Z8) S tur Printed Name, Title, Ca pany Date City Protect Manager: Michael Chau Park Devel nt Specialist, CORK 613121 Slgnat re Printed Nance, Title Date Mayor/Csty Manager 5�gnature Printed Name, Title Date Zj u Page 2 of 3 Contract Quantity Adjustment/Change Order wT, c"16 Project Name: Frontier Park Playground Area Construction Quan. Ad)JChange Order No.: Chanee Order Data Contract Time Adjustment Item # Item Descriotion Unit OW. Unit Price Amount I rnmww i Page 3 of Z Contract Quantity Adjustment/Change Order toll". n 01 IL Project Name: Frontier Park Playground Area Construction Quan. Adj./Change Order No.: uantity Adiustment Data Contract Time Adjustment Item Description s ROUND RDCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Agreement No. 1 to "City of Round Rock Agreement for Demolition and Concrete Work at Frontier Park with Perez Construction, LLC" Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/9/2021 Dept Director: Rick Atkins, Director Cost: $2,600.00 Indexes: CD8G HUD Entitlement Grants Attachments: Perez Construction, LLC Supplemental Agreement No. 1 Frontier Park (Signed) (06 30 21) (00475830xA08F8), LAF- Suppl No. 1 to Perez Construction, LLC Frontier Park Demo and Concrete (06 30 21) (00475832xA08F8) Department: Parks & Recreation Text of Legislative File CM-2021-197 This item will authorize City Manager to execute Supplemental Agreement No. 1 to "City of Round Rock Agreement for Demolition and Concrete Work at Frontier Park with Perez Construction, LLC. Additional sawcutting is required to complete construction per plan. Footers on existing seatwalls were discovered to not be built per existing plans and did not follow standard construction practices. To separate the seatwall and concrete, additional sawcutting will need to be added to the scope of work. The original agreement began with a Request for Quote was sent out on May 24th, 2021 and Perez Construction, LLC was found to be the low bidder. The Frontier Park Playground Area Construction project will include the demolition of existing concrete and playcurb, site preparation, construction of concrete flatwork, concrete playcurb, and construction of ADA playground ramps. PARD's Park Development Team held open houses with the adjacent neighborhood to develop a site plan. The final plan presented to the neighborhood received overwhelmingly positive feedback and residents expressed excitement about the redevelopment and much needed renovation of this park. The park improvement will be funded through CDBG HUD Entitlement Grants. Cost: $2,600.00 Source of Funds: CDBG HUD Entitlement Grants City of Round Rock Page 2