CM-2021-201 - 7/16/2021Page I of Contract Quantity Adjustment/Change Order It-- -VI" W. outs Department: 23000 Project Name: Old Settlers Park in a Park Construction Project Date: 6/24/21 City Project Change Order/Quantity ID Number Adjustment No. 1 Partners Remodelling, Restoration, and Vendor Waterproofing 3219 Harpers Ferry Lane Austin, TX 78745 512-297-7032 Company Name Address Phone No. Justification 'tease see attached Change Order Summary Report. SUMMARY Original Contract Price: Previous Quanbty Adjustment(s). This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity AdjuAment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: $0.00 0% $42,560.00 21% $42,560.00 21% $249,334.50 $39,670.00 60 days none 20 days 80 days Prepared By: Rachel Morris Park Development Specialist, CORR apap Printed Name, Tale, Company Date Contractor: _ 1 — 3fE� &l h hylg- , - — SignaturePrinted Name, Tide, Company Date — city Project r Manager. 9-C.." ,r,r;5 pk. -k- 5i re Printed Name, Title Date Mayor/City , Manager �. u �� &l Signature 01M- 2-0 2-1 - 2-C f Page 2 of 3 Contract Quantity Adjustment/ Change Order rrr. 03 - A Project Name: Old Settlers Park in a Park Construction Project Quan. Adj./Change Order No. Change Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 Start Finish Walls - Installation LS 1 $12,600.00 $12,600.00 8 2 Hillside Lounges Adjustments LS 1 $6,760.00 $6,760.00 3 3 Masonry Column Wraps LS 1 $4,400.00 $4,400.00 3 4 Sculpture Piers LS 1 $13,000.00 $13,000.00 3 5 Concrete Stain LS 1 $3,500.00 $3,500.00 1 6 Stucco Finish on Seat/Retaining Walls LS 1 $1,500.00 $1,500.00 1 7 Concrete Panel Replacement LS 1 $800.00 $800.00 0 Page 3 of 3 1-n- Contract Quantity Adjustment/ Change Order et K4'. -e-. 7 L. LF Project Name: Old Settlers Park in a Park Construction Project Quan. Adj./Change Order No. Quantity Adjustment Data Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da s 1 Erosion Control Log LF 710 $5.00 $3,550.00 0 2 Hillside Lounge Base EA 1 $1,200.00 $1,200.00 1 3 Trash Bins EA -2 $1,000.00 -$2,000.00 0 4 Colored Concrete Bands LF -82 $20.00 -$1,640.00 0 5 Bench Swing Installation LS -1 $4,000.00 -$4,000.00 0 TOTAMI _ J Old Settlers Park in a Park Construction Change Order #1 Summary Date: 06/28/2021 Change Order #1 to the contract with Partners Remodeling, Restoration, and Waterproofing includes the following changes and adjustments: CHANGES Add Start/Finish Walls: It was determined the best value for the City to have the Contractor, while already mobilized on -site, to build two (2) quarry block walls to define the Start/Finish area for the high - profile cross-country events held in the area. This work included installing quarry block wall, the requisite equipment for installation, backfilling behind the walls, and drilling holes through the backfill into the ground for signage. Cost: $12,600.00 Changes to Lounges: The ADA inspection report came back after bid and required an ADA accessible lounge. Additional hardscape was needed in order to get users to and around the accessible lounge and the design of the lounge itself had to be adjusted to meet ADA standards. Finally, the City also had the Contractor complete the wood framing on all the lounges. Cost: $6,760.00 Masonry Column Wraps: Masonry column wraps were added after receiving final design of the pergola structure, which was post -bid. Cost: $4,400.00 Concrete Stain: After fully cured, it was determined that the integral -colored concrete was not dark enough and would need to be stained. Cost: $3,500.00 Sculpture Piers: It was determined the best value for the City to have the Contractor, while already mobilized on -site, to drill and construct two (2) piers for the sculpture to be installed in the plaza in August. If this work were not completed prior to opening, it would have required closing the plaza to demo the center area where the sculpture will be installed. Cost: $13,000.00 Stucco Finish: In order to achieve the desired smoothness, a thin layer of stucco was added to the face of the poured -in -place concrete seat/retaining walls. Cost: $1,500.00 Concrete Panel: In order to expedite irrigation installation, a panel of existing sidewalk was removed and replaced by the Contractor. Cost: $800.00 TOTAL CHANGES: $42,560.00 ADJUSTMENTS Erosion Control Log: During the pre -construction meeting, WCID requested additional erosion control log be installed for the project, Cost: $3,550.00 Hillside Lounge: After construction had begun, People and Parks Fund surveyed its supporters and found they wanted additional lounges. In response, PARD added a regular Hillside Lounge base. Cost: $1,200.00 Trash Bins: This item was removed from the scope and trash bins were instead purchased via BuyBoard. Cost:-$2,000.00 Colored Concrete Bands: Once construction started, this item was removed from the scope. Cost:-$1,640.00 Bench Swing Installation: This item was removed from the scope and the bench swings were installed by the fabricator. Cost:-$4,000.00 TOTAL ADJUSTMENTS:-$2,890.00 IROUMID City of Round Rock RO[KXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Partners Remodeling, Restoration and Waterproofing for the Old Settlers - Park in a Park Construction Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/16/2021 Dept Director: Rick Atkins, Director Cost: $39,670.00 Indexes: Parks Improvement & Acquisition Fund Attachments: Change Order #1- Partners, LAF - QA-CO#1 w- Partners Department: Parks & Recreation Text of Legislative File CM-2021-201 This item will authorize the City Manager to execute a Quantity Adjustment/Change Order with Partners Remodeling, Restoration and Waterproofing for the Old Settlers - Park in a Park Construction Project. Please see the attached Summary Report for a breakdown of this Change Order. The vision of Park in a Park is to create a beautiful space for reflection and passive recreation, distinct from the mostly active recreation currently offered by Old Settlers Park. The original contract included sitework, concrete flatwork, a colored concrete and flagstone plaza, concrete seat/retaining walls to create terraces, shade structure piers, and various site furnishings. During construction, it was determined best value to the City to have the Contractor do additional work to bring this vision to life; the details of which can be found the Change Order Summary attached. This project will also serve as a backdrop for high -profile events such as the University Interscholastic League (UIL) State Cross Country Meet. As such, it was determined best value for the City to include aesthetic upgrades to the Start/Finish line which will enhance spectator's experience at these events. Finally, the Park in a Park project will serve as an example and catalyst for future projects intended to elevate and diversify the recreation provided by the parks system. The Park in a Park project will make use of Lower Colorado River Authority (LCRA) funding which was received when the City sold an easement within Mayfield Park for the new high -voltage electrical lines. City of Round Rock Page 1 of 2 Agenda item Summary Continued (CM-2021-201) Because these funds are associated with the sale of parkland, they must be used on park improvements. Cost. $39,670.00 Source of Funds: Parks Improvement & Acquisition Fund City of Round Rock Page 2 of 2