CM-2021-203 - 7/23/2021Page i of 3
Contract Quantity Adjustment/ Change Order
NyUNO �OOf T1.ifA5
W 01 16
Department: Utilities And Environmental Services
Project
Name: South Creek AC Waterline Rehabilitation Date: 7 7 21
City Project Change Order/Quantity
ID Number SCRK Adjustment No. 1
Vendor SKE Construction LLC PO Box 1111 Cypress, TX 77410 281-585-4100
Company Name Address Phone No.
lustification
Wing additional line items because the method of construction changed in order to loop the system on South Creek.
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change
Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
150
150
0%
$30,000.00 2%
$30,000.00 2%
$1,727,337.50
$30,000.00
Prepar Shelly A. Eberhart Presiden CEO SKE Construction LLC 7 7 21
Printed Name, Title, Company Date
cantrjp w /- —Shel[ A. Eberhar4 Presides CEO SKE Construction LLC 7 MI
igna Printed Name, Title, Company Date
City Project
Manager: Q
i ature Pri Name, Titled ate
Mayor/CityTManager 'Yt Cl 1�N•4 !'` %� [/i l f 5 / // (r r —Date �
Slgn re Printed Name, Tle Date
Pale 2 al' 3
Contract Quantity Adjustment/Change Order
—.aM6
Project Name: South Creek AC Waterline Rehabilitation
Quan. Adj./Change Order No.:
Channe Order Data
Item #
1
Item Description
Install 6" HDPE Waterline by HDD
iti0
Unit price
$175.00
Amount
$28,000.00
Contract
Time
Adjustment
Da
Unit
LF
2
Install complete in place 6" wet connection
EA
2
$1,000.00
$2,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
T TALS;
$0.00
Page -1 of I
Contract Quantity Adjustment/Change Order
-p-1 I M, mrle
Project Name: South Creek AC Waterline Rehabilitation
Quan. Adj./Change Order No.: 1
Ouantitu Adjustment Data
Bid Item #
Item DescriO ion
Unit
Unit Price
Amount
Contract
Time
Adjustment
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.001
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TO t
s "PIN
LD
4
4E 'r
IV58 , ' .Yr.r 1
..� ' , iIV 5-
d C'EV&2'
V' 25:
:k
4000
e ' r
PRV
'
`�
�i
k�
s►�
Gate Valve
.i
�.
IV
SouthCreek A/C Waterlines
;f x Waterlines
116
GAT�TIS=SCHOOL-'RD��
T�
AV
ua[e mvea: ijulzuz1 1:S9 em
N
South Creek A/C
Pipe Bursting I.R
run-ft-Om"al-
ROUND ROCK
TEXAS
City of Round Rock
Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 1 with SKE
Construction, LLC for the South Creek Asbestos -Cement Waterline Pipe Bursting
Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 7/23/2021
Dept Director: Michael Thane, Utilities & Environmental Services Director
Cost: $30,000.00
Indexes: Self -Financed Water Construction
Attachments: QA-CO No. 1—Partial Signed, MAP
Department: Utilities & Environmental Services
Text of Legislative File CM-2021-203
The City of Round Rock has a water main replacement program that targets water mains based on their
age, history of leaks, breaks, and other problems. Replacing these aging water mains with modern
materials ensures safe and reliable delivery of drinking water to the residents of Round Rock. This
proposed project will consist of replacing approximately 14,500 L.F. of 6-inch, 8-inch, and 12-inch
asbestos -cement (A/C) water mains with same size high -density polyethylene pipe in the South Creek
subdivision. These mains installed in the 1970s have a history of breaks and are near the end of their
estimated life expectancy.
During construction, it was found that the waterline down Jasmine Path was not fed with two water mains.
To meet fire code and ensure adequate water pressure during an emergency, the Utilities and
Environmental Services Department will loop the water line down Jasmine Path. This will provide a dual
feed, improve water quality, and eliminate the need for the City to flush the waterline monthly. This
additional work will consist of boring under South Creek.
The addition of Quantity Adjustment/Change Order No. 1 will bring the contract price to $1,727,337.50.
Cost: $30,000
Source of Funds: Self -Financed Water Construction
City of Round Rock Page I