CM-2021-203 - 7/23/2021Page i of 3 Contract Quantity Adjustment/ Change Order NyUNO �OOf T1.ifA5 W 01 16 Department: Utilities And Environmental Services Project Name: South Creek AC Waterline Rehabilitation Date: 7 7 21 City Project Change Order/Quantity ID Number SCRK Adjustment No. 1 Vendor SKE Construction LLC PO Box 1111 Cypress, TX 77410 281-585-4100 Company Name Address Phone No. lustification Wing additional line items because the method of construction changed in order to loop the system on South Creek. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 150 150 0% $30,000.00 2% $30,000.00 2% $1,727,337.50 $30,000.00 Prepar Shelly A. Eberhart Presiden CEO SKE Construction LLC 7 7 21 Printed Name, Title, Company Date cantrjp w /- —Shel[ A. Eberhar4 Presides CEO SKE Construction LLC 7 MI igna Printed Name, Title, Company Date City Project Manager: Q i ature Pri Name, Titled ate Mayor/CityTManager 'Yt Cl 1�N•4 !'` %� [/i l f 5 / // (r r —Date � Slgn re Printed Name, Tle Date Pale 2 al' 3 Contract Quantity Adjustment/Change Order —.aM6 Project Name: South Creek AC Waterline Rehabilitation Quan. Adj./Change Order No.: Channe Order Data Item # 1 Item Description Install 6" HDPE Waterline by HDD iti0 Unit price $175.00 Amount $28,000.00 Contract Time Adjustment Da Unit LF 2 Install complete in place 6" wet connection EA 2 $1,000.00 $2,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 T TALS; $0.00 Page -1 of I Contract Quantity Adjustment/Change Order -p-1 I M, mrle Project Name: South Creek AC Waterline Rehabilitation Quan. Adj./Change Order No.: 1 Ouantitu Adjustment Data Bid Item # Item DescriO ion Unit Unit Price Amount Contract Time Adjustment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.001 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TO t s "PIN LD 4 4E 'r IV58 , ' .Yr.r 1 ..� ' , iIV 5- d C'EV&2' V' 25: :k 4000 e ' r PRV ' `� �i k� s►� Gate Valve .i �. IV SouthCreek A/C Waterlines ;f x Waterlines 116 GAT�TIS=SCHOOL-'RD�� T� AV ua[e mvea: ijulzuz1 1:S9 em N South Creek A/C Pipe Bursting I.R run-ft-Om"al- ROUND ROCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with SKE Construction, LLC for the South Creek Asbestos -Cement Waterline Pipe Bursting Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/23/2021 Dept Director: Michael Thane, Utilities & Environmental Services Director Cost: $30,000.00 Indexes: Self -Financed Water Construction Attachments: QA-CO No. 1—Partial Signed, MAP Department: Utilities & Environmental Services Text of Legislative File CM-2021-203 The City of Round Rock has a water main replacement program that targets water mains based on their age, history of leaks, breaks, and other problems. Replacing these aging water mains with modern materials ensures safe and reliable delivery of drinking water to the residents of Round Rock. This proposed project will consist of replacing approximately 14,500 L.F. of 6-inch, 8-inch, and 12-inch asbestos -cement (A/C) water mains with same size high -density polyethylene pipe in the South Creek subdivision. These mains installed in the 1970s have a history of breaks and are near the end of their estimated life expectancy. During construction, it was found that the waterline down Jasmine Path was not fed with two water mains. To meet fire code and ensure adequate water pressure during an emergency, the Utilities and Environmental Services Department will loop the water line down Jasmine Path. This will provide a dual feed, improve water quality, and eliminate the need for the City to flush the waterline monthly. This additional work will consist of boring under South Creek. The addition of Quantity Adjustment/Change Order No. 1 will bring the contract price to $1,727,337.50. Cost: $30,000 Source of Funds: Self -Financed Water Construction City of Round Rock Page I