Loading...
CM-2021-210 - 7/30/2021Paget of 3 1-1101 Contract Quantity Adjustment/ Change Order rev, Ole16 Department: Transrtation Project Name: Logan Street (Greenlawn Boulevard to A.W. Grimes Boulevard) Date: 7/15/21 City Project Change Order/Quantity 1D Number Adjustment No. i Vendor James Construction Group 222 Pennb ' ht Drive Suite 230 281-35D-3500 Company Name Address Phone No. Justification SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Amount % Change $0.00 0% -$41,315.31 -2% -$41315.31 -2% $2 023 598.90 -$41,315.31 300 0 0 300 Su,�nitted�for.A val Steven Gutierrez, Project Mangager, James Construction Group 711512 Printed Name, Title, Company Date Contractor: '4n-4 Steven Gutierrez, Project Manaager, James Conspvton Group 7 15 21 Sign Printed Name, Title, Company Date City Project Manager: gnature Printed Name, T?tI4 Date Mayor/q ?A( ,,,W �/� j /: 1t Manager- �'it' }` 1 . (. 'L i�U Signature Printed Name, Title Harp Contract Quantity Adjustment/Change Order Ibl.o.oa • i .. r{Y 61,16 Project Name: Logan Street (Greenlawn Boulevard to A.W. Grimes Boulevard) Quan. Adj./Change Order No. Chance Order Data Page 2 of Item # Item DescriAtion Unit Unit Price Amount Contract Time Adjustment D 618 6023 CONDT (PVC) SCH 40 2) LF 1614 $15.40 $25,779.60 618 6070 CONDT RM 2') LF -1674 $23.11 -;38,686.14 2606002 LIME HYDRATED LIME(SLURRY) TON $166.54 416,320.92 2606009 LIME TRT EXST MATL 10") SY -4374 $5.79 - 75,325.46 436 )0= P.C. CONCRETE VALLEY GUTTERS SF -380 $6.47 -$2,458.60 4796001 ADJUSTING MANHOLES EA 1 $733.81 $733.81 5296008 CONC CURB & GUTTER (TY-II) LF 119 $28.90 $3,439.10 5296039 CONCRETE CURB (RIBBON LF 426 $19.99 $8,515.74 2004 6001 DECOMPOSED GRANITE 3 DEPTH SY 213 $14.12 $3,007.56 $0.00 0.00 ;0.00 $0.00 0.06 $0.00 $0.00 00 $0.00 $0. 00 ;.0 $0.00 $0.00 $0.00 $0.00 a ti.WIN WIVE FENS r Page 3 of lon- Contract Quantity AdjusWent/Change Order W.o<<a Project Name: Logan Street (Greenlawn Boulevard to A.W. Grimes Boulevard) Quan. Adj./Change Order No. UanUF,V AO ustmem pate Bid Item # Item Description Unit W.Y. Unit Price Amount MUM Time Adjustment (Days) $0.00 0 0.00 0 $0.00 0 $0.00 0 0o o $0.00 0 $o.ao 0 $0.00 0 $0.00 0 0.00 0 $. 0 $0.00 0 .00 0 $0.00 $0.00 00 $0.00 $0.00 0.00 $0.00 0.00 $0.00 $0.00 $0.00 City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with James Construction Group for the Logan Street - Greenlawn Boulevard to A.W. Grimes Boulevard Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/30/2021 Dept Director: Gary Hudder, Transportation Director Cost: Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QACO#1, Location map Department: Transportation Text of Legislative File CM-2021-210 This QA/CO consists of the subtraction of steel conduit, hydrated lime slurry, lime stabilization and concrete valley gutter. There is also the addition of PVC conduit, concrete curb and gutter, concrete ribbon curb and decomposed granite. This work is being modified because we decided to use PVC conduit instead of steel, concrete curb and gutter where there was a need to replace existing failed infrastructure, and ribbon curb/granite at a location where we needed to remove and relocate the existing trail to accommodate a more gradual transition. This QA/CO would provide funds to allow better use of materials and accommodate for substantially improved infrastructure. The previous contract price was $2,064,914.21 along with this QA/CO of-$41,315.31 will make the new contract price $2,023,598.90. Cost:-$41�,31S.1 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock Page 1 of 1