CM-2021-211 - 7/30/2021Page 1 of 3 Contract Quantity Adjustment/Change Order -f-11* —,. �' orna Department: UES Project Name: Black to Stone Street Wastewater Extension Date: 6/23/21 City Project Change Order/Quantity ID Number WCNWW Adjustment No. 1 Vendor Patriot Construction, LLC P. O. Box 863 - Liberty Hill, Texas 78642 _ (936) 443-9115 Company Name Address Phone No. Justification :hange Order/Quantity Adjsutment No. 1 Is for manhole coating, water line realignment, driveway removal and haul off, connecting to existing manholes, and bid item djustments. SUMMARY Amount % Change Original Contract Price: $97 774,D0 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $0.00 Total QuantityAdjustment(s): 1 $4,805.00 Total Contract Price with Quantity Adjustment(s): 1 $102 579.00 Previous Change Order(s): $0.00 0% This Change Order: $23,327.00 23% Total Change Order(s) To Date: $23.327.00 23% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: $125 906.00 Difference between Original and Adjusted Contract Prices: $28,132.00 Original Contract Time: 60 Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: 7 New Contract Time: 67 Prepared By: Eddie Za to Senior Project Mana er qq of Round Rock 7121121 Si9.nature J11V Printed Name, Title, Company Date City Project Manauer: Mayor/City Manager Printed Name, Title, Company Laurie Date 11a®r 1 of3 Contract Quantity Adjustment/Change Order Project Name: Black to Stone Street Wastewater Extension Quan. Adj./Change Order No.: Chanoe Order Data Item # Item Description Unit Unit Price Amount Contract Time Adjustment CO 1-1 Epoxy coat ng for existing manhole Ea. 1 $1 472.00 $1,472.00 CO 1-2 Driveway removal and haul off Ea. 1 $2 138.00 $2,138.00 1 CO 1-3 Waterline realignment along Black Street Ea. 1 $7 263.00 $7 263.00 2 CO 1-4 Concrete encase water line along Black Street Ea. 1 $1 657.00 $1 657.00 1 CO 1-5 Installation of wastewater line between gas and electric lines not shown on plans Ea. 1 $1450.00 $1,450,00 CO 1-6 Connect to existing manholes Ea. 2 $2 611.00 $5 222.00 CO 1-7 Install end of line manhole Ea. 1 $2,700.00 $2 700.00 CO 1-8 emove and install storm sewer pipe and header on driveway along Black Street Ea. 1 $1425.00 $1425.00 1 TOTALS:1 $23,327.0t75 Page 3 of 3 Contract Quantity Adjustment/Change Order m, 01/16 Project Name: Mack to Stone Street Wastewater Extension Quan. Adj./Change Order No.: 1 Ouantity Adiustment Data Bid Item # Item Description Unit qtv. Unit Price Amount Contract Time Adjustment 1 Trench Safety Protection LF -700 $1.00 -$700.00 8 6-INCH Geanout Installation Ea. 3 $1 750.00 $5 250.00 1 9 6-Inch Sanitary Sewer Service Connection Installation Ea. 3 $1,285.00 $3 855.00 1 13 Mulch Log LF -600 $6.00 -$3 600.00 TOTALS z Q wde-uosueln�yyti IS iSe1:�787 7��A1Ah 16 75'ellpe1911a+' IZpASdVlyl "{+�—Ig7nostJ F-IIW.S-O Nadi e PCity of Round Rock NDROCK AS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Patriot Underground, LLC for the Black Street to Stone Street Wastewater Extension Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 7/30/2021 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $28,132.00 Indexes: Self -Financed Wastewater Construction Attachments: CO-QA #1- 6.23.2021, BlackToStoneSt_WWextension-Map Department: Utilities & Environmental Services Text of Legislative File CM-2021-211 This Quantity Adjustment/Change Order (QA/CO) No. 1 is for the construction services required for the Black Street to Stone Street Wastewater Extension project. The project included installation of new 12-inch and 8-inch wastewater lines, manholes, and associated wastewater service connections. The proposed wastewater extension provides wastewater service to two city blocks in downtown Round Rock. The project area included the alley south of Main Street between Stone Street and Black Street and along Stone Street and McNeil Road. On January 20, 2021, the department received seven bids for this project. Patriot Underground, LLC was the low bid with a total bid of $97,774. QA/CO No. 1 is for manhole coating, driveway removal and haul off, connecting to existing manholes, and bid item adjustments. OA/CO No. 1 is in the amount of $28,132 which increased the contract price to $125,906. Cost: $28,132 Source of Funds: Self Financed Wastewater Construction City of Round Rock Page 1