Loading...
CM-2021-220 - 8/13/2021Page 1 of 3 Contract Quantity Adjustment/Change Order rev, outs Department: Project Name: McNeil at St Willaims - Quiet Zone Date: 6/16/21 Change Order/Quantity Adjustment No. FIVE (5)Revised AUSTIN TRAFFIC SIGNAL CONST. CO., IN( PO BOX 120 ROUND ROCK, TX 78680 512-255-9951 Company Name Address Phone No. City Project ID !Number Vendor justification TRANSPORTATION ADMINISTRATION FINAL QUANTITIES - RESOLVE OVER AND UNDER BID ITEMS SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Signature 004,2021-2 2-0 Amount $419,195.08 -$4,965.43 -$4,965.43 $414,229.65 $96,937.26 $3,164.00 $100,101.26 $514,330.91 $95,135.83 0 Submitted for Approval Collette Phillips, Asst Controller Austin Traffic Signal Cosnt. Co, Tnr Printed Name, I ltle, umpany Approvals Ed Schroeder, VP Austin Traffic Printed Name, Title, Company % Change 6/16/21 Date Printed Name, Title Date 23% 1% 24% Page 2of3 Contract Quantity Adjustment/ Change Order Project Name: McNeil at St Willaims - Quiet Zone Quan. Adj./Change Order No.: FIVE (5) Chance Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da s CO 05 RAIL PRO INVOICE #AT2724620210423 1 LS $998.00 $998.00 CO 05-1 ADA RAMP DETECTOR REMOVALS 2 EA 360.00 $720.00 CO 05-2 ADA RAMP UPGRADE -SURFACE MOUNT 2 EA $723.00 $1,446.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order rft OVA Project Name: McNeil at St Willaims - Quiet Zone Quan. Adj./Change Order No.: FIVE (5) Ouantity Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 14-0000 CONDUIT (PVC SCH 80) 3 IN BORE LF -32 $72.00 -$21304.00 29-0000 REF PVMK (TY I-W) 4 IN SOLID LF 1254 $5.80 $7,273.20 30-0000 REF PVMK (TY 12 IN) LF -119 $10.00 - 1,190.00 34-0000 REF PVMK (TY Y 4in) LF -209 $3.00 -$627.00 35-0000 REF PVMK (TY Y 12in) LF -8 $21.00 -$168.00 36-0000 PAVEMENT SEALER 4 IN LF -209 $0.55 -$114.95 37-0000 PAVEMENT SEALER 12 IN LF -119 $2.20 -$261.80 38-0000 PAVEMENT SEALER 24 IN LF -8 $4.30 -$34.40 39-0000 ELIMINATE EXISTING PVMK 4 IN LF -160 $9.00 -$1,440.00 40-0000 PAVMENT SURFACE PREP 4 IN LF -209 $0.01 -$2.09 41-0000 PAVMENT SURFACE PREP 12 IN LF -119 $6.00 -$714.00 42-0000 PAVMENT SURFACE PREP 24 IN LF -8 $0.12 -$0.96 85-0000 ALUMINUM SIGNS (TY A) SF -63 $32.00 -$2,016.00 90-0000 REF PVMK (TY I-W) 4 IN SOLID LF 50 $6.00 $300.00 91-0000 REF PVMK (TY I-W) 8 IN SOLID LF 103 $8.00 $824.00 92-0000 REF PVMK (TY I) 12 IN SOLID LF -2 $11.00 -$22.00 93-0000 REF PVMK (TY I) 24 IN SOLID LF -58 $20.00 -$1,160.00 96-0000 REF PVMK (TY I) RR XING 100M EA -2 $800.00 -$1,600.00 97-0000 REF PVMK (TY Y) 4 IN SOLID 100M LF 509 $3.00 $1,527.00 98-0000 REF PVMK (TY Y) 24 IN SOLID 100M LF -11 $21.00 -$231.00 99-0000 PAVEMENT SEALER (4 IN) LF -610 $0.55 -$335.50 100-0000 PAVEMENT SEALER (8 IN) LF -420 $1.20 -$504.00 101-0000 PAVEMENT SEALER (12 IN) LF -2 $2.00 -$4.00 102-0000 PAVEMENT SEALER (24 IN) LF -100 $4.00 -$400.00 103-0000 PAVEMENT SEALER (ARROW) EA -1 $99.00 -$99.00 104-0000 PAVEMENT SEALER (WORD) EA -1 $200.00 -$200.00 105-0000 PAVEMENT SEALER (X ING) EA -2 $215.00 -$430.00 106-0000 ELIMINATE EXISTING PVMK 4 IN LF -95 $9.00 -$855.00 107-0000 ELIMINATE EXISTING PVMK 24 IN LF -6 $26.00 -$156.00 108-0000 PAVEMENT SURFACE PREP (4 IN) LF 1829 $0.01 $18.29 109-0000 PAVEMENT SURFACE PREP (8 IN) LF 103 $0.02 $2.06 110-0000 PAVEMENT SURFACE PREP (12 IN) LF -69 $0.12 -$8.28 113-0000 PAVEMENT SURFACE PREP (12 IN) FA -2 $10.00 -$20.00 114-0000 PAVEMENT SURFACE PREP (12 IN) FA -2 $6.00 -$12.00 $0.00 .431 0 Id}y WJ o Jay O w AD� a Z W � w W z tit 0 U o u Q .� W L, z OVad 8hd Z Q � Y t7 U = a z a a s n LLJ LAB m J �-y Y O ai c _ 'lot 0 1 -' m Lei 'moo UjZ $ C M� + °n = > r a �- O i� W ino y z to w o C7 C W Q � CD F- ' � `� W E oo r,4shLngt„ ? F' y o _Eft z U z $`� �a = ..� WZ co 3�y cr '" ly CL y z W co Q = ui ' p Q m U Y a Z CC O o a G 2 y p S a� jXW o e y'' U cc to mq = J 0 � C? z p Ix � $apfktrcu U Q rn 4 z W O qC m J� n m p L> O W 8 An 7 z x = _j `� a CO p N W �140,3s- -- 3 N `J y x o- L& U p IDi LU E Ya rz °, p3 So%* _ a = } W Lu70 assd C'J R W J C=i 5 C� ? Z Y 4?6% pV¢ a 4 ac v� Y c, sus ; > O V) �,et W �p a �vss m a W W cs s H LLA mco U W �� cr 3`',V a m rn W } W m Mr.G E Q b� co)fib 0UL `'tlo�u. !-z W W 3 v ��'s'f W U O be E 0 U a v+ a V OO a v Vio�0+ 'O. Now c-) C? cr Ate` O, Jai' Z co �y; {jack Dr 0 o 3: ar d. IExUND ROCK .A5 City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. S with Austin Traffic Signal Const. Co., for the Traffic Signal at McNeil and St. Williams - Quiet Zone Project. Type: City Manager Item Governing Body: City Manager Approva; Agenda Date: V13/2011 Dept Director: Gary Budder, Transportation Director Cost: Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QACO#5_revised, RR quiet zones ph 1 larger Department: Transportation Text of Legislative File CM-2021-220 Change order # 1 was for the third party inspection required by Union Pacific Rail Road when doing work in their ROW. The Quiet Zone work of installing a traffic signal at St. Williams Street is within UPRR's ROW and does require RailPros Field Services, Inc. The amount of that change order was $36,442.00 for inspection services from April of 2020 through May of 2020. Change Order #2 was for RailPro's Field Services while the City's contractor completed work within UPRR's ROW on St. Williams Street and McNeil Road. This change order is in the amount of $31,363.26, Change Order #3 was for another RailPro's invoice that should cover the last of the work activities on UPRR's rail line for the purposes of installing a traffic signal at the St. Williams crossing. This change order is in the amount of $17,718.00. Change Order #4 was for replacement of the control cabinet for the traffic signal at St. Williams and McNeil Street and the RailPro's Services to perform that work. A vehicle ran the other one over and totaled it therefore the replacement. The cost of this unit installed is $6,432.00. The cost of RailPro's Services is $ 4,982.00. The adjusted contract price will be $516,132.34. Change Order/Quantity Adjustment #5 is for the removal and replacement of the tactile strips on the walk way across the railroad tracks and RailPro's services to watch them do the work. The change Order portion City of Round Rock Page 1 of 2 Agenda Item Summary Continued CM-2021-220 is $3,164.00. The Quantity Adjustment portion of this is for over runs on striping and other items that were not used per the contract quantities in the amount of-$4,965.43. The total contract price is now $514,330,91, Cost:-$1801.43 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock Page 2 of 2