Loading...
CM-2021-223 - 8/20/2021Page 1 of 3 Contract Quantity Adjustment/Change Order IrO1WY1100r rr ,a 00, 01116 Department: PARD Project Name: Old Settlers Park Adult Recreation Cam las Basketball Court Project 2021 Date: 8/4/21 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Fazzone Construction 2008 windy Terrace, Cedar Park, Texas 78613 512.289.6399 Company Name Address Phone No..� lustffication rhis change order Includes placement of quarry block stones associated with the roundabout drive monument and conversion of parking spaces a ADA parking spaces. Since Fazzone was already mobilized in the park, it was a cost savings to the City to have Fazzone complete these ;copes of work. Additionally, a mow strip was included in the base bid that was to be installed below a perimeter fence. Since the alternate ncluding the fence was not picked up, the mow strip was no longer needed. SUMMARY Original Contract Price: Previous Quantity Adjustment($): This Quantity Adjustment: Total Quantity Adjustment(s): Total contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Criginal Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Amount % Change 90 days Time Adjustment by this Quan. Adj./Change Order: 5 days New Contract Time: 95 days Signature Printed Name, 0% $17,625.00 11% $17,625.00 11% $172,902.73 $17,625.00 f Signature Printed Name, Title, Company DateCity Project / Manager: ��{ � ra'�� �Q1 +'L ►�. f R / � D-ttk. M1MJ �� ' l �►f 11rrnracu narrrc, ■uc , — Mayor/City �. Jr jn �rMan er 1;;y 4"t lI1' SIQna a nted Name. a+oac Title Date (04 , -,20 2-1— 2 2- � Page 2 of 3 Contract Quantity Adjustment/Change Order -Itn #ft. 0 1: 16 Project Name: Old Settlers Park Adult Recreation Comples Basketball Court Project 2021 Quan. Adj./Change Order No. Chance Order Data Item # Item Description P Unit � Unit Price Amount Contract Time Adjustment D I Installation of Stones for Monument LS 1 $11,620.00 11,6 5 2 Removal of mow strip from scope SF -840 $7.50 -$6,300.00 3 ADA parking space conversion LS 1 $12,305.00 $12,305.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.00 WOO $0.00 $0.00 0 $0.00 $0.001 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of i Contract Quantity Adjustment/Change Order I-01-- IEiN9 4". a1FEa Project Name: Old Settlers Park Adult Recreation Comples Basketball Court Project 2021 Quan. Adj./Change Order No.: Ouantity Adjustment Data Bid item # Item Description Unit Unit Price Amount Contrail Time Adjustment $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $a. 0.00 0.00 $0.00 00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 .00 ROUND ROCK TEXA5 City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No.1 with Fazzone Construction Co., Inc. for the Old Settlers Park Adult Recreation Complex Basketball Court Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 8/20/2021 Dept Director: Rick Atkins, Director Cost: $17,625.00 Indexes: Parks Improvement & Acquisition Fund Attachments: Fazzone Change Order, LAF Fazzone Construction Old Settlers Park Adult Recreation Complex Basketball Court Department: Parks & Recreation Text of Legislative File CM-2021-223 This item will authorize QA/CO #1 with Fazzone Construction. This change order includes placement of quarry block stones associated with the roundabout drive monument and conversion of parking spaces to ADA parking spaces. Since Fazzone was already mobilized in the park, it was a cost savings to the City to have Fazzone complete these scopes of work. Additionally, a mow strip was included in the base bid that was to be installed below a perimeter fence. Since the alternate including the fence was not picked up, the mow strip was no longer needed. As part of the second phase of development at the Adult Recreation Complex at Old Settlers Park, a covered basketball court will be installed. Currently, there isn't a basketball court in Old Settlers Park and very few on the west side of the City are open to the public. This amenity will provide ample space for basketball (both free and league play), as well as other sports such as pickelball and futsol. Previously, Council has approved the purchase and installation of a fabric shade structure to cover the basketball court. In the hot Texas sun, courts with shade coverings are much more functional and provide a better experience for patrons. Additionally, the second phase of development will include an expansion to the HUB building as part of a separate contract. That project is currently under design. Cost: $17,625.00 Source of Funds: Park Improvement & Acquisition Fund City of Round Rock Page 1