R-2021-261 - 9/23/2021 RESOLUTION NO. R-2021-261 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Company, Inc. for the Northeast Downtown Infrastructure Improvements Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 3,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 3 to the Contract with Cash Construction Company, Inc. for the Northeast Downtown Infrastructure Improvements Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of September, 2021. & A / CRAIG 40RGA Mayor City of Round Rckk, Texas ATTEST: 4y1L&e!K Nowlw— MEAGAN SlfyKS, De uty City Clerk 0112.20212,00481329 EXHIBIT Contract Quantity Adjustment/Change Order rrA» rc,mn6 Department: UES Project Name: Northeast DowntownRevitalization Date: 8/30121 City Project Change Order/Quantity )D Number RHB20 Adjustment No. 3 Vendor Cash Construcbon 217 Kingston Lacy Blvd. -Pflugerville,Texas 78660 (512)251-7872 Company Name Address Phone No. lustiRcation Change Order No.3 is for replacing 6-inch wastewater line in Milam Street and in Alley between Mays and Lampasas Street with 8-inch HDPE wastewater line by pipe bursting. Also replace existing 2-inch waterline in alley between Mays and Lampasas Street. SUMMARY Amount Mo Change Original Contract Price: ;7 823 780.00 Previous Quantity Adjustment(s): ;0 00 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): 0.00 Total Contract Price with Quantity Adjustment(s): ;7,823,780.00 Previous Change Order(s): $164,056.70 2% This Change Order: ;227,692.50 3% Total Change Orders)To Date: $391,749.20 5% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustments)Plus Change Order(s)]: ;8,215 529.20 Difference between Original and Adjusted Contract Prices: ;391,749,20 Original Contract Time: 365 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 7 New Contract Time: 372 71reppa.re.d B : Eddie Zapata,Senior Project Manager,City of Round Rock 8 0 21 17 nature Printed Name,Title,Company Date Contractor: , I Michael Stevens Project Manager,Cash Construction g/ gnat Printed Name,Title,Company Date City Manager: er: 4i Eddie Zapata,Senior Pro Manager UZ Signature Printed Name,Title Date Mayor/City Manager Craig Morgan Mayor Signature Printed Name,Title Date 2021-261 Page 2 of 3 Contract QuantityAdiustment Change a Order IM, ALA Project Name: Northeast Dow ntownRevitalization Quan.Adj./Change Order No.: 3 Chame Order Dab contract Time Adiusbnent Item# Item Description Unit Unit Price Amount CO 3-1 Mobilization LS 1 $12,000.00 $12,000.00 7 CO 3-2 Pipe Burst existing 6-inch Wastewater with 8-inch HDPE LF. 1166 $93.75 $109,312.50 CO 3-3 Reconnect to existing wastewater service lateral Ea. 10 $1,500.00 $15,000.00 CO 3-4 Wastewater Service Saddles Ea. 14 125.00 $1,750.00 CO 3-5 Road plate rental for wastewater service laterals Ea. 14 $460.00 $6,440.00 CO 3-6 Traffic Control LS 1 1 500.00 1 500.00 CO 3-7 Demo and remove existing 2"water line LF. 647 $20.00 112,940.00 CO 3-8 Install 6"waterline(Complete in lace LF. 647 $100.00 64 700.00 CO 3-9 Haul off Utility Spoils CY 300 $12.00 $3,600.00 CO 3-10 Temporary Pavement Repair Cold Mix Ton 9 $50.00 $450.00 TOT 227 6 2.50 7 Page 3 of 3 Contract Quantity Adjustment/Change Order �.atilt Project Name: Northeast DowntownRevitalization Quan.Adj./Change Order No.: 3 Quantltv Ad usbment Data Contract Time Adjustment Bid Item Item Description Unit Unit Price Amount TOTALS: