Loading...
CM-2021-272 - 10/22/2021I r Page I of 3 Contract Quantity Adjustment/ Change Order m' 01116 Department: TRANSPORTATION ADMINISTRATION Project Name: McNeil at St Willaims _._Quiet Zone Date: 6/16/21 City Project Change Order/Quantity ID Number Adjustment No. SIX 6 Vendor AUS_TIN_ TRAFFIC SIGNAL CONST. CO., IN( PO BOX 120 ROUND ROCK, TX 78680 512-255-9951 Company Name Address Phone No. Justification IDDITIONAL ITMES TO BE REMOVED BECAUSE THE WORK WAS NOT DONE. SUMMARY Amount % Change Original Contract Prke: $419,195A6 Previous Quantity Adjusbnent(s): -$4,965.43 This Quantity Adjustment: -$38,600.00 Total Quantity Adjustment(s): -$43,565.43 Total Contract Price with Quantity Adjus"rit(s): $ 775,629.65 Previous Change Order(s): $100,101.26 27% This Change Order: $0.00 0% Total Change Order(s) To Date: $100,101.26 27% Adjusted Contract Price [Original Contract Pnce Plus Quantity Adjustnwrit(s) Plus Change Order(s)): $475,730.91 Difference between Original and Adjusted Contract Prices: $56,535.83 Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 0 Submitted for APMWI / Collette Phillips, Asst Controller Austin Traffic Signal Cosnt. Co, Prepared By: (� (� Inc. 10/14/21 S;g,fe Name, Title, Company Date 7ted Appr'ovab Contractor: r ^� �' 1 Ed Schroeder, VP Austin Traffic Signal Const. Co., Inc. 10/14/21 Signature Printed Name, Title, Company Date City Project PS �� ryry�� Manager: �[]J�bf--I�� Signature Printed blame, Title Date 01 Mayor/City 00 Z_Z 2 i Manager r`r`e tt re V I Printed Name, Title Date OW ,20 2 (-2 "7 2_ Contract Quantity Adjustment/Change Order +'Y<Yt�Y4f3 v3 w_ 4L'1► Project Name: McNeil at St Willaims - Quiet Zone Quan. Adj./Change Order No.: SIX (6) Chanae Order Data 71 1 1 1 I 1 1'I VIYALIA Page 2 of 3 r Page 3of3 Contract Quantity Adjustment/Change Order �-�- "'"- q■-III, 4 Pro)ect Name: McNeil at St Willaims - Quiet Zone Quan. Adj./Change Order No.: SIX (6) ntlty Adiustment Data wQ W ...� o EW,, cn O d �e o Z F W CALn C7 ~ 4�enb� W Z W U V 0 xy y1�� Q 4 W V Z i3idord Bt d Z Q G LU CO) CID a Z G. F- 0 0 m n LLJ w W LLi Y e� c`a e J tie CA E Y Ssy`d! Ui o �n m m y a LLJ p y — n c9 0 Q oC cn 0 Z H LAA cc f- E �; p s W #- E O Cushing [h — J F- N o Z U $' d 2 -j LLu z N � N Vi .]c W m' Z W Q ~ _ cr. 0ui LAJLL W s v aLJ LLuo m O O Nujlz CJ U V Z cz Z Q �_ap�4gca 3 C Q 3 9 U ui o N c Z z = J A O � W Cocx Q s LL Oy U Oco of h- H� * ao cu W Z � � � y �0a. De LLJ � F J W o YZ =z y 1, 03 s+► �t m Q O ~ d LLI i0 a N W U. -j o Z 0 �' pstr> J�' = J ci — z .r U Q N O m v�`:1oS�sa d LU LU n� Lu a Rd CD J U N d O3: bi C W 3 ii is to Liu Z W? E 'a v %ti / Jy de w j++ ZFi: a ti o v W ?T y� cn W JQ >' c >s z3 ' WU ecr /sue p s[ ir, = E V U U p�yaidoF°� 4�', O d U y� Rocti O` 'o�d4.0 V - 0` vPv 0 3 g a a cr ROUND ROCK TEXAS City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 6 with Austin Traffic Signal Const. Co., Inc. for the Traffic Signal at McNeil and St. Williams - Quiet Zone Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/22/2021 Dept Director: Gary Hudder, Transportation Director Cost: Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA-CO#6_partexec, RR quiet zones ph 1 larger Department: Transportation Text of Legislative File CM-2021-272 Change order # 1 was for the third party inspection required by Union Pacific Rail Road when doing work in their ROW. The Quiet Zone work of installing a traffic signal at St. Williams Street is within UPRR's ROW and does require RailPros Field Services, Inc. The amount of that change order was $36,442.00 for inspection services from April of 2020 through May of 2020. Change Order #2 was for RailPro's Field Services while the City's contractor completed work within UPRR's ROW on St. Williams Street and McNeil Road. This change order is in the amount of $31,363.26. Change Order #3 was for another RailPro's invoice that should cover the last of the work activities on UPRR's rail line for the purposes of installing a traffic signal at the St. Williams crossing. This change order is in the amount of $17,718.00. Change Order #4 was for replacement of the control cabinet for the traffic signal at St. Williams and McNeil Street and the RailPro's Services to perform that work. A vehicle ran the other one over and totaled it therefore the replacement. The cost of this unit installed is $6,432.00. The cost of RailPro's Services is $ 4,982.00. The adjusted contract price will be $516,132.34. Change Order/Quantity Adjustment #S was for the removal and replacement of the tactile strips on the walk way across the railroad tracks and RailPro's services to watch them do the work. The change Order portion is $3,164.00. The Quantity Adjustment portion of this is for over runs on striping and other items that were not used per the contract quantities in the amount of-$4,965.43. The total contract price is now $514,330.91. Change Order/Quantity Adjustment #6 is for the removal of the chain link fence and gate that was to be City of Round Rock Page 1 of 2 Fd Agenda Item Summary Condnued CM-2021-272 installed around the perimeter of Union Pacific's yard off of Burnett and McNeil. This Change in quantity is in the amount of $-38,600.00. The total contract price is now $475,730.91. Cost: RR Transportation and Economic Development Corporation Source of Funds:-$38,600.00 City of Round Rock Page 2 of 2