Loading...
R-2021-285 - 10/28/2021RESOLUTION NO. R-2021-285 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with DeNucci Constructors, LLC for the University Boulevard Widening — IH 35 to Sunrise Road Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 5, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 5 to the Contract with DeNucci Constructors, LLC for the University Boulevard Widening — IH 35 to Sunrise Road Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of October, 2021. CRAGtound OR AN, Mayor City of ock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.20212; 00484018 EXHIBIT A Page I of 3 Contract Quantity Adjustment/Change Order lee, 0�/Ib Department: Transportation Project Name: 13001.01 University Blvd Widening Date: 9/24/21 City Project Change Order/Quantity ID Number 13001.01 Adjustment No. S Vendor DeNucd Constructors LLC 8310 Capital of TX Hwy N Ste 275 Austin TX 78731 512-335-0600 Company Name Address Phone No. lusttilcation 1. Added install/remove tublar delineators per REV 12 per COP 10 (attached) 2. Added FHs per CoRR directive. (1) —STA 666+10 University Blvd. in front of CVS, (2) -STA 661+25 at SE corner of University Blvd. and Sunrise Rd. COP ii (attached) 3. NW corner of University Oaks Blvd and University Blvd, removal and relocation of BOVA double water service in conflict with University Oaks Blvd proposed cross street roadway section. COP 12 REV I (attached) 4. (4) added 6" GVs due to failed shutout at FH STA 652+00 COP 14 (attached) Item #870. Quantity bust in temp arrows (16 already Installed and not billed, 48 remaining = 64) Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 760 24 12 796 $203,091.07 2% $58,346.19 0% $261,437.26 2% $12,374,757.31 $345,844.31 City Project Signature Printed Name, Title Date ] Manager: Q tLj11k SAcJoiel��. i -9A • 2 / Mayor/City Manager Signature Printed Name, Title Date Contract Quantity Adjustment/Change Order M, ouLe Project Name: 13001.01 University Blvd Widening Quan, Adj./Change Order No. Change Order Data Page 2 of 3 I Contract Time AdJustment � I I a •GI .: ea " r Contract Quantity Adjustment/Change Order ev 01,16 Project Name: 13001.01 University Blvd Widening Quan. Adj./Change Order No antlity Adjustment Data Page 3 of 3 DescriptionContract Time Adjustment Item 1 11 MONOMER 1 1 11 _- oil IMMOMEM_- 1 m ONENNOMM SOMEONE ENEMIES! __- _- / 91 IMMEMME IMEMEMOM 1 t1 SOMEONE IMMEMMIN 1 1•< _- TI 1 I IMMEMMIN ONE 11 121 U101, I Ivl