Loading...
R-2021-284 - 10/28/2021RESOLUTION NO. R-2021-284 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Aguirre & Fields, LP for the Old Settlers Extension Project, and WHEREAS, Aguirre & Fields, LP has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services and to increase the compensation, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with Aguirre & Fields, LP, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract with Aguirre & Fields, LP, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of October, 2021. CRAIG �GIORG, Mayor City of Round ck, Texas ATTEST: .•. L. "ITE, City Clerk 0112.20212; 00484001 EXHIBIT "A" STATE OF TEXAS COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: Aruirre & Fields, LP ("Engineer'?} ADDRESS: 12708 Riata Vista Circle, Suite A-109, Austin, TX 78727 PROJECT: old Settlers Extension This Supplemental Contract No. l to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Aguirre & Fields, LP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 13th day of February, 2020 for the Old Settlers Extension Project in the amount of $532,331.53; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $934,919.70 to a total of $1,467,251.23; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 1, City Services and Exhibit A. City Services shall be amended as set forth in the attached Addendum To Exhibit A. Article 2. Engineerinp, Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4, Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $934,9 l 9.70 the lump sum amount payable under the Contract for a total of $1,467,251.23, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Re %-.06A & 0199 20202, 0048.2365 942 7­5 AGUIRRE & FIELDS, LP AGUIRRE, LLC - GENERAL PARTNER By:lr� /iff 1/1.1 Christine R. Crosbv. Vice -President Octnht-r 1. 2021 Date Supplemental Contract Rex.0616 019920202.00482565 84275 CITY OF ROUNDROCK APPROVED AS TO. FORW By: Craig Morgan, Mayor Stephan L. Sheetsg City Attorney. Date Supplemental Contract R.c%-.06/16 .0199 20202. 0048256.3 84275 ADDENDUM TO EXHIBIT A City Services Attached Behind This Page AGUIRRE & FIELDS, LP CONTRACT: SWA01TOWA01 ADDENDUM TO EXHIBIT A — SWA 01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION FROM N RED BUD LN TO CR 110 PS&E/CONSTRUCTION SERVICES CITY OF ROUND ROCK OLD SETTLERS EXTENSION SERVICES TO BE PROVIDED BY THE CITY The City of Round Rock will provide the following Items/information for the Engineer under this agreement: 1) ROUTE & DESIGN STUDIES (FC 110) i) Provide available plans and/or data for adjacent projects, including the adjacent N Red Bud Ln improvements and CR 110 South schematic. ii) Attend Design Concept Conference with The Engineer to discuss revisions to the design prior to development of the 60% plans. iii) Provide review/approval of pavement design 2) RIGHT OF WAY DATA (FC 130) i) Assist with Rights -of -Entry (ROE) for all adjacent properties if initial request is denied. ii) Conduct all ROW appraisals and acquisitions. iii) Coordination for any temporary construction easements. iv) Coordination for any drainage easements. v) Assist with coordinating utility adjustments and proposed relocation plans by utility owners. 3) ROADWAY DESIGN CONTROLS (FC 160) i) Assist with the coordination and procurement of design files for adjacent projects, including the adjacent N Red Bud Ln improvements and CR 110 South schematic. ii) Provide a PS&E checklist and preferred plan set go-by (if applicable) for use by the Engineer. iii) Provide example Estimates and hard copy documentation for the Engineer's use in preparing the Estimate, General Notes and Specifications. iv) Provide direction for the creation of Design Cross Sections. 4) PROJECT MANAGEMENT & ADMINISTRATION (FC 164) Q Provide time confirmation for milestone submittals. ii) Provide the Engineer with timely reviews/decisions to maintain the project schedule. iii) Provide agreements with property owners for all necessary off -site improvements. Consultant to develop utility agreements with utility provider's and City oversight. iv) Meet with the Engineer on an as -needed basis. v) Provide payment of all associated application and review fees required for jurisdictional approval of the project. AG U I RRE & FIELDS, LP CONTRACT: SWA01TOWA01 ADDENDUM TO EXHIBIT B - SWA 01 ENGINEERING SERVICES ODD SETTLERS EXTENSION FROM N RED BUD LN TO CR 110 PS&E/CONSTRUCTION SERVICES CITY OF ROUND ROCK OLD SETTLERS EXTENSION This contract consists of providing engineering services required for the preparation of plans, specifications and estimates (PS&E) and related supporting documents for the construction of Old Settlers Blvd in Round Rock, TX on new location. The project limits will begin at N Red Bud Ln and end at CR 110, with transitions as necessary beyond those intersections to accommodate the traffic control plan or other miscellaneous work. Old Settlers Blvd will consist of an average 110-foot right-of-way, 68 feet of pavement, twin bridge structures, retaining wails, corridor fencing, curb and gutter, and a sidewalk/shared use path on each side of the road. These services include preparing roadway design, hydrologic and hydraulic design, structural design, signal design, waterline design, geotechnical investigation, supplemental survey, utility coordination, and attendance at the city's monthly utility coordination meeting as necessary. FC 110 - ROUTE & DESIGN STUDIES 1. DATA COLLECTION & FIELD RECONNAISSANCE a. Aguirre & Fields, LP ("the Engineer") shall collect, review, and evaluate the data described below. The City of Round Rock (City) will be notified in writing whenever the Engineer finds disagreement with the information or documents. The Engineer shall: i. Review plans and/or data from the City, including the adjacent N Red Bud Ln improvements and CR 110 South schematic. ii. Review supplemental survey and topographic file. iii. Conduct field reconnaissance and collect data including a photographic record of any changes since the 30% schematic submittal. b. The Engineer shall collect data to support the finalization of the traffic report and signal design: L Obtain Weekday 12- Hour Turning Movement Counts at the following intersections CR 110 at Porano Circle. ii. Obtain 24-hour tube counts on one Weekday on CR 110 south of Porano Circle. iii. Obtain Traffic Impact Analysis (TIAs) for Siena MUD Subdivision and other new approved developments in the area. iv. Conduct field reconnaissance to observe existing traffic pattern and existing conditions for signal and illumination design. 2. DESIGN CRITERIA a. The Engineer shall schedule and attend one Design Concept Conference with the City once the Public Involvement and Outreach Process (Open House #2) has been completed, and public comments and attendance are documented. The purpose of this meeting will be to discuss any necessary revisions or updates to the design prior to developing the 60% plans. The Engineer shall create and distribute meeting notes for concurrence by the City. b. The Engineer shall update the design summary report (DSR) and project notebook to document design decisions as necessary. c. Deliverables: AGUIRRE & FIELDS, LP CITY OF ROUND ROCK CONTRACT: OLD SETTLERS EXTENSION SWA 01 TO WA 01 L Design Concept Conference Notes for approval ii. Design Summary Report (DSR) 3. GEOTECHNICAL INVESTIGATION & FIELD WORK a. The Engineer shall determine boring locations for retaining wall structures. b. The Engineer shall perform borings and obtain soils samples. Borings are estimated to consist of the following: i. 2 retaining wall borings to a depth of 20 feet within the at -grade or fill areas at 200-foot maximum intervals. The boring depths may be reduced when encountering rock' and shall have a S-foot minimum penetration into rock. ii. Borings shall occur within the limits of the future retaining walls. c. The Engineer shall obtain two Scour analysis hand samples. d. The Engineer shall perform laboratory testing to classify soil strata, evaluate plasticity and shrink/swell potential and evaluate the compressive strength. Typical Tests include moisture contents, Atterberg Limits, unconfined compressive strengths, sieve analyses, sulfate content tests, and grain size distribution curves with D50 value. e. The Engineer shall prepare/update a signed, sealed, and dated Geotechnical Report to include the summary of field investigations, laboratory testing results and recommended retaining wall design. f. Deliverables: L Signed/Sealed Geotechnicai Report ii. goring Logs 4. TRAFFIC ENGINEERING & OPERATIONS a. The Engineer will update signal warrant analysis at the intersection of Old Settlers Blvd and CR 110. The Engineer shall: I. Estimate projected turning movement volumes at the future intersection of Old Settlers Blvd Extension and CR 110 using new turning movement counts at CR 110 and Porano Circle. ii. Conduct signal warrant analysis at the future intersection of CR 110 and proposed Old Settlers Blvd Extension following methodology found in Chapter 4 of the Texas Manual on Uniform Traffic Control Devices (TMUTCD). Warrant 3 (Peak -Hour Volume) will be analyzed using projected turning movement counts. TMUTCD Warrant 2 (Four -Hour Volume) and Warrant 8 (Daily Volume) will be analyzed using 12-hour roadway segment counts collected in Task II and traffic volume projections. iii. Summarize findings of the traffic study in a technical memorandum. b. Deliverables: I. Updated Signal Warrant Study Technical memorandum FC 120 — PUBLIC INVOLVEMENT 1. RIGHT OF WAY MAP a. The Engineer's subconsultant will provide public involvement during this phase to keep stakeholders updated on design progress, answer questions, and support the team with stakeholder communications. CD&P will schedule and facilitate meetings with affected property owners as circumstances require and document meeting outcomes. CD&P will provide updates to project materials and content for updates to the City of Round Rock project webpage. CD&P will update the project database with stakeholder contact information and communications. AGUIRRE & FIELDS, LP CONTRACT: SWA. 01 TO WA 01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION b. Deliverables: i. Stakeholder database ii. Coordinate, attend, and document up to 8 stakeholder meetings iii. Respond to stakeholder inquiries and provide project email updates iv. Update project materials (fact sheet, maps and FAQs) v. Provide content updates for City of Round Rock project webpage FC 130 — RIGHT of WAY DATA 1. RIGHT OF WAY MAP a. The Engineer will finalize proposed Right of Way (ROW) and easements. The Engineer shall: 1. Review Survey ROW documents. ii. Review SUE data and utility conflicts. iii. Refine the 3D roadway model to establish construction limits for proposed easements. iv. Update ROW and easement iinework in CARD for the PS&E. b. The Engineer's Surveyor shall prepare proposed ROW documents: i. Preparation of Right of Way (ROW) Document (Meets & Bounds). c. The Engineer's Surveyor shall set ROW Monumentation: L The Engineer's Surveyor will set Yvinch iron rods with caps at PCs, PTs, angle points and at no greater than 1,000 foot intervals along tangents on the proposed ROW line. 1/2-inch iron rods with caps will be set at property line intersections with the new right -of- way line. d. Deliverables: i. One legal description for each parcel (signed and sealed). Up to five (6) exhibits. ii. One individual survey plat on 81/2"x11" for each parcel (signed and sealed). iii. One set of area computation sheets for legal descriptions and plats and ROW maps for all parcels. iv. Digital files will be uploaded onto ProjectWise for the ROW base file and reference files in MicroStation (.dgn) format. 2. SUBSURFACE UTILITY ENGINEERING (SUE) a. The Engineer will provide Subsurface Utility Engineering (SUE) as described below: L The Engineer shall perform Quality Level-B and Quality Level -A SUE. ii. As necessary: in accordance with Cl/ASCE 38-02 `Standard Guideline for the collection and depiction of existing subsurface data.' The Quality Level-B investigation will encompass the portion of the project area east of McNutt Creek to the eastern limit of the project at CR 110. The Quality Level -A investigation assumes up to 15 test holes to be used as necessary and invoiced to the City for each hole conducted. This standard defines the following quality levels: 1. Quality Level-B: Information obtained through the application of appropriate surface geophysical methods to determine the existence and approximate horizontal position of subsurface utilities. Quality Level-B data should be reproducible by surface geophysics at any point of their depiction. This information is surveyed to applicable tolerances defined by the project and reduced onto plan documents. 2. Quality Level -A: Precise horizontal and vertical location of utilities obtained by the actual exposure for verification of previously exposed and surveyed utilities) and AGUIRRE & FIELDS, LP CITY OF ROUND ROCK CONTRACT: OLD SETTLERS EXTENSION SWA 01 TO WA 01 subsequent measurement of subsurface utilities, usually at a specific point. Minimally intrusive excavation equipment is typically used to minimize the potential for utility damage. A precise horizontal and vertical location, as well as other utility attributes, is shown on plan documents. 3. UTILITY COORDINATION (UC) a. The Engineer shall provide Utility Coordination for the project as described below: i. The Engineer shall maintain a Utility Contact List, Utility Conflict Matrix (UCM) Spreadsheet and Conflict layout Exhibit. ii. The Engineer shall maintain a 2D Conflict Layout Exhibit in the MicroStation/GeoPak SS10 version used by the City of Round Rock. The exhibit shall include existing utilities which are to remain in place or be abandoned, and adjusted utilities. This layout will be utilized to monitor the necessity to evaluate alternatives. Facilities in conflict with the proposed project that are to be relocated. Facilities to be abandoned in place. Facilities to remain in service and in place. iii. The Engineer shall facilitate utility conflict identification and review of resolutions for utilities conflicts to be adjusted, relocated, or accommodated in the public right of way. Iv. The Engineer shall review the utility's proposed adjustments and coordinate compliance with local, state, and federal utility accommodation rules. v. The Engineer shall prepare for and attend up to twelve (12) coordination meetings with individual utility owners including transmission line power provider and two (2) coordination meeting with the City. vi. The Engineer shall coordinate distribution of NOPC letters (Notice of Proposed Construction) and NORA (Notice of Required Accommodation) letters. vii. The Engineer shall coordinate Utility Certifications and/or Special Provisions for any utility adjustments not fully completed by the time of the project letting phase. vii i. Deliverables: 1. Quality Level-B 2D Utility Designation will be 11-in. x 17-in. SUE plan sheets depicting the findings of the investigation. 2. Quality Level -A Test Hole excavations will be an 8.5-in. x 11-in. Test Hole Data Form for each Test Hole performed indicating depth, size, location, and other notable characteristics of the utility. Electronic files will be provided in MicroStation format along with PDFs and photos. 3. Utility Contact List 4. Utility Conflict Matrix Spreadsheet S. Utility Conflict Layout Exhibits 6. Meeting Minutes (delivered electronically) 7. Utility Certificates 8. Electronic CAD files FC 131- UTILITIES 1. UTILITIES a. Halff shall design approximately 4,030 linear feet of new waterline to be constructed within the ROW of the Old Settlers extension. The proposed waterline will connect to the CORR's existing system at two points, at the intersection of Old Settlers Blvd and Red Bud Ln and at an existing stub out from Pauling Loop, and terminate at CR 110. The connection to the water system off of Pauling AGUIRRE & FIELDS, LP CONTRACT: SWA01TOWA01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION Loop will require a dedicated utility easement on CORR property. b. Diameter of proposed main will be selected by CORR based on digital water modeling. c. Horizontal alignment will account for extension to the parcels south of Old Settlers ROW. If required, a minimum of two roadway crossings will be included in the design to allow for connection to the water system by the south parcels. d. Design shall conform to the CORR's utility criteria and standards. e. Plan Preparation I. Project Layout will show limits of waterline installation (one sheet at 1"=200') ii. Utility Notes applicable to this project provided by the City of Round Rock. iii. Project Specific Notes iv. Utility Plan & Profile (1"=40' horiz) v. City of Round Rock Standard Utility Details vi. Special details, as necessary f. Easement Documentation I. Halff shall prepare an easement document containing a metes and bounds description for a waterline easement that will encompass the proposed waterline from the edge of the Sienna development (Pauling Loop) to the new Old Settlers ROW. FC 150 — SURVEY 1. SURVEY a. The Engineer's Surveyor shall provide Supplemental Design Surveys as described below I. The Surveyor shall collect supplemental data for a typical design and topographic survey. Process data for DTM & Triangle Irregular Network (TIN) (2D & 3D), including but not limited to chains and points; planimetric maps (2D) & topographic maps, cross sections and/or drainage analysis and other needs as detailed below. ii. Typical DTM & topographic data includes but is not limited to: natural ground (NG), roadway surfaces, edge of pavement (EP), centerline, grade breaks, striping, driveways and side streets (determine driveway/side street radii), curb, ditches, culverts, headwalls, drainage structures, channel(s), riprap, power poles, signs, delineators, luminaries, fences, manholes, sewer lines, telephone boxes, junctions, etc., water valves, fire hydrants, pipeline crossings, gas meters, gas valves, etc., and any other visible utility. 1. Driveway and street/county road data collect type of surface (asphalt, concrete, seal coat, gravel, dirt, etc.), with or without culvert, type of culvert pipe, size, length, with or without Safety End Treatment (SET) for a distance of 200' beyond the existing 0ld Settlers Blvd. ROW. 2. Cross road structures data (includes culverts and bridge class structures), collect type, size, end treatment, etc., and profile for crossroad structure. 3. Bore Hole locations 4. Identify and photograph features (signs, mail boxes, etc.). S. Trees- all trees of 8" diameter or greater shall be located and tied in. Information needed is trunk size, tree type and limits of canopy (size). 5. Develop pavement centerline alignment of existing pavement(s). 7. Run existing cross sections as a back check for errors in data or processing 8. Utility locations- Behind curbs, tie visible utility locations, including ties to above- ground features, such as power poles, valves, and other utility features to the right- of-way line either found by our surveyors or located for us by utility companies AGUIRRE & FIELDS, LP CITY OF ROUND ROCK CONTRACT: OLD SETTLERS EXTENSION SWA01TOWA01 and/or other agencies. One -call will be notified prior to acquisition of survey. The Engineer shall not be liable for utilities not identified as part of the one -call at the time of survey. Note: does NOT include tying irrigation heads; irrigation heads are often below the grass and not readily visible/locatable. 9. The Texas Excavation Safety System, DIGTESS one call system (phone number 1-800- DIG-TESS) shall be notified for utility locations and prior to drilling, setting or driving anything including property corners or control monuments below 16" depth, as detailed by DIGTESS (http://www.digtess.org), which may impact or be impacted by the existence of any underground utility, whether visible or not. Note that some local or city utilities may not be a part of the DIGTESS system and may require separate notification. 10. Perform a bathymetric survey of McNutt Creek from face of dam to ± 200 feet north and merge data with DTM. Note: this information is necessary for bridge scour analysis. 11. As built survey of McNutt Creek bridge crossing to include: Top of road, top of rail, bottom chord, abutments, and bent locations for using in LOMR application package. b. Specifications & Standards for the Work: i. The Engineer's Surveyor shall perform all work in accordance with the contract and the provisions, standards, specifications, manuals (City of Round Rock Transportation Criteria Manual, ROW- Vol. 1, Procedures Preliminary to Release, et al), methods, procedures, deliverables, deliverable format and any other information contained within or referenced to in the contract as previously agreed to by both parties. c. Field Surveying Deliverables: L Data 1. Raw field data 2. Processed field data 3. Project digital pictures (delivered in .jpg format) 4. 3D & 2D Topo (.dgn) processed files in MicroStation/GeoPak SS10, with all chains and points included on the 30% existing survey. ii. Signed Right of Entry forms if ROE is acquired. iii. ROW Products 1. .dgn of Proposed and Existing ROW 2. Reference Deeds, support documents, scanned and in .pdf format. iv. Survey Control - Survey Control shall be furnished in two (2) forms- 1. The City's Control Sheet(s) format, which consists of: a. A Control Layout index map, which contains an overall view of the project area with the locations of primary and secondary control identified and labeled. b. A Horizontal and Vertical Control Sheet(s), which contains monument sketches of primary and secondary control points. Monument sketches shall tie monuments to a minimum of three existing features. c. Survey Control Sheet(s) information shall include the NGS or other basis monument(s) name or identification number, Texas Coordinate System (TCS) zone information, Grid and Surface values in X, Y, & Z coordinates, the Combined Adjustment Factor or Surface Adjustment Factor, and project AGUIRRE & FIELDS, LP CONTRACT: SWA 01 TO WA 01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION station and offset. d. Survey Control Sheet(s) shall be delivered as an 11" x 17" sized sheet as a Microstation dgn and as a PDF. 2. An individual 8 %" x 11" Control Point Data Sheet for each primary control monument (delivered as original, interactive PDF file). v. All delivered control documentation shall be signed with a date of signature and sealed by a Texas RPLS. vi. Provide information on cross -sections used as a back check for errors in data or processing. vii. Raw GPS files. viii. For static GPS sessions, in RiNEX format. Ix. For RTK GPS, furnish reports of network information. x. ASCII file(s) of final position information. xi. MicroStation/GeoPak SS10 file (.dgn) of all drawings. 1. Shall include within the drawing file: Company name, address, telephone number, Surveyor's name, date(s) of survey and survey datum information. 2. Shall follow the naming convention "MDF "_Logical Name.dgn 3. E.g. `"MDF212104065—Topo.dgn" xii. .gpk, .prj, .tin and .dat files that are compatible with MicroStation/GeoPak SS10 format. xiii. Upload all files to ProjectWise in appropriate folder. xiv. Preliminary Deliverables shall be delivered as scheduled, in full, to include all items as listed above. xv. Final Deliverables shall be delivered as scheduled, in full, to include all items as listed above no later than 15 days after the return of corrected Preliminary deliverables from the City to the consultant. FC 160 — ROADWAY DESIGN CONTROLS 1. ROADWAY DESIGN a. Horizontal Design —The Engineer shall refine the horizontal design for the Old Settlers Extension Project as described below: i. Refine and extend alignments for Old Settlers Blvd and Porano Circle (after supplemental survey is obtained). ii. Design ultimate configuration for the intersection at Old Settlers Blvd and CR 110. iii. Create horizontal alignment for reconstruction of Porano Circle at CR 110 (after supplemental survey is obtained). iv. Add driveway access to the City -owned parcel on the west side of McNutt Creek. v. Update OpenRoads design files, gpk, and Microstation base/sheet files as necessary. b. Vertical Design —The Engineer shall refine the vertical design for the told Settlers Extension Project as described below: i. Refine Old Settlers profile at creek and Siena MUD to minimize the need for proposed retaining walls. ii. Create profile for Porano Circle at CR 110. iii. Create profile for proposed driveway west of McNutt Creek. iv. Create profile for proposed sidewalk that ties to existing sidewalk at the Siena Park. v. Profile adjustments as necessary for storm sewer design. vi. Update OpenRoads design files, gpk, and Microstation base/sheet files as necessary. 7 AGUIRRE & FIELDS, LP CONTRACT: SWA01TOWA01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION c. Review/Incorporate design for adjacent projects — The Engineer shall review and incorporate the design files for adjacent projects (including N Red Bud Ln and CR 110 South improvements) as described below: i. Organize and import design files into ProjectWise. ii. Update horizontal/vertical/cross sectional design of Old Settlers Blvd as necessary. iii. Update OpenRoads design files, gpk, and Microstation base/sheet files as necessary. d. 3D OpenRoads Model - The Engineer shall refine the 3D OpenRoads Model as the project design progresses and will perform the following tasks: i. Update 3D OpenRoads model to reflect roadway design changes (horizontal/vertical/cross sectional) as necessary. This also includes (but is not limited to) model revisions for the shared use path/sidewalk, retaining walls, site grading, cross culverts. ii. Create 3D OpenRoads model using latest design files for the adjacent N Red Bud Ln project. This model will be used as future existing ground for the N Red Bud Ln intersection, where Old Settlers Blvd will tie into. iii. Create 3D OpenRoads model for Porano Circle at CR 110 (after supplemental survey is obtained). iv. Create proposed surface and .tin file. e. Proposed Cross Sections —The Engineer shall produce proposed cross sections at 50-foot intervals to submit with the 60% Plans. The Engineer shall: i. Obtain/calculate cut and fill quantities - existing and proposed cross sections at 50 foot intervals will be created to determine cut and fill quantities. OpenRoads will be used to calculate quantities. ii. Cut cross sections using OpenRoads. iii. Create cross section plan sheets (11x17). This includes creation of a project specific sheet border, cross section annotation, and sheet clean up. iv. Design cross sections will be plotted on sheets and submitted separately. f. Cross Section Updates - The Engineer shall produce updated cross sections to submit with the 9S% and Final Plans. 2. PLAN SET DRAFTING a. The Engineer shall produce 60%, 95% and Final plans for the Old Settlers Extension Project: i. Title Sheet - will include project name and number; site location; project limits, design speed, signature blocks, and logos as directed by the City. ii. Index of Sheets iii. Project Layout (1"=200') iv. Typical Sections 1. Proposed typical section and existing typical section at tie in point. 2. Sections will include proposed pavement width, travel lanes, pavement structure, sidewalk location and typical cross slope requirements. 3. Typical section will depict typical right of way width. V. General Notes (provided by the City of Round Rock) vi. Removal Layout (1"=50) vii. Horizontal Alignment Data viii. Roadway Plan & Profile (1"=50') ix. Intersection Layout (1"=20') X. Proposed Grading (1"=50) A. Roadway, Sidewalk, & Driveway Details AGUIRRE & FIELDS, LP CONTRACT: SWA01TOWA01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION xii. Roadway Standards b. The Engineer shall prepare/assemble 60%, 95% and Final plans, to be submitted in electronic and hard copy (11"x17") formats. This includes general CADD tasks related to the development of the Plans, Specifications, and Estimate, including supporting documentation. i. File management for CADD, plan set, and supporting documents ii. Create and maintain PSET, pen tbl, resource files iii. Create base files (sheet border, clip shapes) iv. Set up motif/master container files for plan sheets V. Incorporate subconsultant sheets into plan set vi. Compile and PDF plan set, supporting documentation, design calculations vii. Print hard copies for submittal viii. Sign/seal final plan set c. Deliverables: L 60% PS&E Package 1. 60% Plan Set, Specifications, and Construction Cost Estimate ii. 9S% PS&E Package 1. 95% Plan Set, Specifications, and Construction Cost Estimate iii. Final PS&E Package 1. Final Signed/Sealed Plan Set, Specifications, and Construction Cost Estimate 2. All Open Roads, GEOPAK, and Microstation project files (.dgn, .gpk, .tin) iv. Deliverables will be submitted in both electronic and hard copy formats 3. QA/QC a. The Engineer shall submit QA/QC documentation of 60%, 95% and Final plans for the Old Settlers Extension Project. FC 161-- DRAINAGE 1. DRAINAGE a. Bridge Scour Analysis —The Engineer shall perform a scour analysis of the proposed bridge crossing and provide the scour envelopes for use in the plans. The Engineer will also update the drainage report. L Perform a scour evaluation for the proposed bridge structure over McNutt Creek for 60%, 95% and final bridge plans. ii. Scope assumes the Engineer will provide two channel bed sieve analysis iii. Provide the potential scour depths, envelope, and recommended countermeasures, if needed. iv. The scour analysis report will be prepared as a separate document and may be included in the Final Drainage Report as an appendix. b. Final Drainage Report —The Engineer shall update the drainage analysis prepared during the schematic design phase. L Update Drainage Report to reflect final design plans ii. Submit draft Drainage Report to City for review and approval iii. Scope assumes one (1) Drainage Report meeting with the City Floodplain Administrator. c. Conditional Letter of Map Revision (CLOMR) Submittal i. Prepare CLOW submittal package for McNutt Creek for the 10-year, 50-year,100-year, 9 AGUIRRE & FIELDS, LP CONTRACT: SWA01TOWA01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION 500-year, and Ultimate 100-year frequency storm events based on the Upper Brushy Creek preliminary FEMA models provided by the City. These models are considered to be the best available data at this time. ii. Prepare effective, corrected effective, pre -project, and post project hydrology (if needed) and hydraulic models, and run cHECk-RAS for all HEC-RAS models. iii. Prepare exhibits and tables showing floodplain tie-in points upstream and downstream of the proposed project. iv. Update flood profiles, hydrology (if needed) and floodway data tables in the FIS as needed. V. Prepare MT-2 FEMA forms for CLOMR submittal to City and FEMA. vi. Environmental Assessment to be included with the CLOMR submittal. vii. Final proposed plans to be included with the CLOMR submittal. viii. Submit CLOMR to City Floodplain Administrator for review and approval. This scope assumes one (1) CLOMR meeting with the City Floodplain Administrator. ix. Submit CLOMR to FEMA for review and approval. A FEMA review fee is required upon submittal to FEMA and will be submitted on the Engineer's invoice as a pass -through expense to be paid by the City. X. Coordinate up to two (2) iterations with FEMA reviewers. d. Letter of Map Revision (LOMR) Submittal L Prepare LOMR submittal package for McNutt Creek for the 10-year, 50-year,,100-year, 500- year, and ultimate 100-year frequency storm events based on the Upper Brushy Creek preliminary FEMA models provided by the City. These models are considered to be the best available data at this time. ii. Prepare effective, corrected effective, pre -project, and post project hydrology (if needed) and hydraulic models and run cHECk-RAS for all HEC-RAS models. iii. Prepare exhibits and tables showing floodplain tie-in points upstream and downstream of the proposed project. iv. Update flood profiles, hydrology (if needed) and floodway data tables in the FIS as needed. v. Prepare MT-2 FEMA forms for LOMR submittal to City and FEMA. vi. Final as -built plans signed and sealed by a licensed engineer to be included with the LOMR submittal. vii. Submit LOMR to City Floodplain Administrator for review and approval. This scope assumes one (1) LOMR meeting with the City Floodplain Administrator. viii. Submit LOMR to FEMA for review and approval. A FEMA review fee is required upon submittal to FEMA and will be submitted on the Engineer's invoice as a pass -through expense to be paid by the City. ix. Coordinate up to two (2) iterations with FEIVIA reviewers. e. Storm Drain Facilities i. Any proposed public drainage system will be designed to the twenty-five (25) year frequency storm based on fully developed conditions as appropriate. The one hundred (100) year frequency storm event will be designed to be contained within public rights of way or drainage easements as outlined in the latest City Drainage Criteria Manual. ii. The Engineer shall prepare existing and proposed drainage area maps, hydraulic link calculations, inlet calculations and quantity and cost estimates for all proposed storm drain facilities, not including the proposed bridge crossing. iii. Storm Sewer plan and profile sheets along with standards will be included in plan set. City standards will be used. TxDOT standards will be used for all design features which do not have 10 AGUIRRE & FIELDS, LP CONTRACT: SWA01TOWA01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION an applicable City standard. iv. Culvert plan and profile sheets along with standards will be included in plan set. TxDOT standards will be used for all design features which do not have an applicable City standard. Scope assumes one culvert extension at Porano Circle and CR 110. v. This scope assumes storm drain design of the realignment of N Red Bud Ln and Old Settlers Blvd improvements west of Red Bud are to be performed by others. vi. Proposed detention facilities design or analysis of the City Regional Stormwater Management Program (RSMP) are not included in this scope. It is assumed detention facilities will not be required based on time frequencies of the proposed improvements relative to the overall basin timing for the creek. If the City requires install detention facilities or conduct a timing analysis for the RSMP, a Supplemental agreement may be required. vii. Deliverables: 1. 11X17 construction plans sheets for proposed storm drain infrastructure, storm and inlet calculations, culvert calculations and construction details. a. Existing and proposed drainage area maps including hydrology calculations (25 and 100-YR events) b. Storm drain plan and profile to include 25 and 100-YR HGL & Q,V,D talcs per conduit link c. Lateral profiles to include 25 and 100-YR HGL & 0,V,D talcs per conduit link d. Hydraulic calculation sheets (25 and 100-YR storm events) e. Inlet calculation sheet(s) (25 and 100-YR events) f. Standard detail sheets g. Custom detail sheet(s), as necessary h. Proposed culvert extension plan and profile, calculations, and construction details. L Quantity Summary Sheet j. Cost Estimate (60%, 95%. Final) FC 162 —SIGNING. P"EMENT MARKINGS, & SIGNALS I. SIGNING & PAVEMENT MARKINGS a. The Engineer will develop a design for signing and pavement markings along the Old Settlers Blvd Extension. b. The Engineer will prepare plans for signing and pavement markings at a scale of 1"=50' and will include the following: 1. Signing & Pavement Marking Layouts 2. Small Sign Details 3. Summary of Small Signs Sheet 4. Standard Sheets using City of Round Rock and/or TxDOT Standards 2. SIGNAL DESIGN a. Signal Design Plans: The Engineer will develop plans to install new traffic signal at the future intersection of CR 110 and Old Settlers Blvd. The Engineer will also develop sheets for signal modifications at CR 110 and N Red Bud Lane. For this scope, the Engineer has assumed that the modifications will be limited to pedestrian equipment (ped-pole, push buttons and associated wiring) relocation only and does not include any plans to install new traffic signal poles and signal 11 AGUIRRE & FIELDS, LP CONTRACT: SWA 01 TO WA 01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION cabinet. b. The signal plans will be prepared at a scale of 1"=40' and will include the following sheets. L Signal Layout sheet will show the locations of proposed signal poles, pedestrian poles, signal heads, communication equipment, electrical conduits, ground boxes, signal cabinet, new electrical service, existing utilities, right of way, and proposed roadway improvements. Locations of pedestrian poles and pedestrian access ramps will be designed in conformance with ADA requirements. Due to lateral and vertical clearance required from an overhead electric line (per the State law), the Engineer will coordinate with the City before finalizing locations of signal poles, where applicable. H. Signal Elevation sheet will show placement of signal heads on a mast -arm and vertical clearance required for the mast -arm. III. Conduit Chart and Electrical Wiring sheet will show the type and number of electrical wires in each conduit run. A new electrical service will be designed to support total electrical load due to the new traffic signal and safety lighting at the intersection. The electrical service will Include two separate circuits for traffic signal and illumination. At the 60% field review meeting, the Engineer will coordinate with the City and local electric service provider to determine location of new electrical service. iv. Phasing & Detection sheet will show the proposed phasing at each intersection. Phasing and signal -heads for left -turn movements will be designed in conformance with 2011 Texas MUTCO. Video detection details for each movement will also be shown. v. APS load switch assignment sheet A. Quantities sheet will be provided for the intersection. c. The Engineer will use latest general notes issued by the City and update appropriately as required for traffic signals. d. Deliverables.- 1. 60% Plans Submittal 1. Existing Conditions 2. Proposed Signal layout 3. Signal Elevation 4. Opinion of Probably Construction Cost Estimate ii. 95% Plans Submittal 1. General Notes 2. Proposed Signal layout 3. Signal Elevation 4. Electrical Wiring S. Phasing and Detection 6. Estimated Quantities 7. City/TxDOT Standards (including Traffic Control Plans standards) 8. Opinion of Probably Construction Cost Estimate iii. Final Plans Submittal 1. Address any comments to plan sheets from 90% submittal 2. Issue signed and sealed plan sheets 3. Final cost estimate FC 163 - MISCELLANEOUS (ROADWAY 1. TRAFFIC CONTROL 12 AGUIRRE & FIELDS, LP CONTRACT: SWA 01 TO WA 01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION a. Traffic Control Plans - The Engineer will develop Traffic Control Plans (TCP) for the Old Settlers Blvd Extension at N Red Bud Ln, Porano Circle, and CR 110 with accordance with the latest edition of the TMUTCD. The Engineer will: i. Provide a written narrative of the construction sequencing and work activities per phase and determine the existing and proposed traffic control devices (regulatory signs, warning signs, guide signs, route markers, construction pavement markings, barricades, flag personnel, temporary traffic signals, etc.) to be used to handle traffic during each construction sequence. ii. Develop each TCP to provide continuous, safe access to each adjacent property during all phases of construction and to preserve existing access. The Engineer shall notify the City in the event existing access must be eliminated and must receive approval from the City prior to any elimination of existing access. iii. Prepare each TCP in coordination with the City. The TCP must include interim signing for every phase of construction. Interim signing must include regulatory, warning, construction, route, and guide signs. The Engineer shad interface and coordinate phases of work, including the TCP, with adjacent Engineers, which are responsible for the preparation of the PS&E for adjacent projects. iv. Describe the type of work to be performed for each phase of sequence of construction and any special instructions (e.g. storm drain, culverts, bridges, railing, illumination, signals, retaining walls, signing, paving surface sequencing or concrete placement, ROW restrictions, utilities, etc.) that the contractor should be made aware to include limits of construction, obliteration, and shifting or detouring of traffic prior to the proceeding phase. v. Include the work limits, the location of channelizing devices, positive barrier, location and direction of traffic, work area, stations, pavement markings, and other information deemed necessary for each phase of construction. b. Deliverables: i. Traffic Control Plans (1"=50') ii. Traffic Control Narrative iii. Standard Sheets using City of Round Rock and/or TXDOT Standards 2. ILLUMINATION DESIGN a. Illumination Design Plans -The Engineer will develop illumination plans for continuous lighting along Old Settlers Blvd from N Red Bud lane to CR 110, The Engineer will: i. Coordinate with the City to confirm preference on height and aesthetics for the light poles. ii. Develop a photometric model using lighting software AGi 32 to determine pole spacing such that minimum "Illuminance" requirements are satisfied per AASHTO guidelines. iii. Conduct electrical and voltage drop calculations to determine wire and conduit sizes, and number and details of electrical services required along the project corridor. iv. Coordinate with ONCOR and City staff to determine locations to draw power and set electrical services. v. Prepare layout sheets at appropriate scale to show location of poles, conduits, and wiring. The plans will also include conduit and wire charts, details on electrical services, and quantity summaries. vi. Develop opinion of probable construction cost (OPCQ at the 95°Y and prior to final PS&E submittal. 13 AGUIRRE & FIELDS, LP CONTRACT: SWA 01 TO WA 01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION b. Deliverables: 1. 60% Submittal -- Photometric Layout ii. 95% Plans Submittal 1. Proposed Illumination Layout z. Electrical Wiring & Conduit Charts 3. City/TxDOT Standards (including Traffic Control Plans standards) 4. Quantity Summary Sheets S. Opinion of Probable Construction Cost Estimate 3. EROSION CONTROL a. The Engineer shall develop Storm water Pollution Prevention (SW3P), on separate sheets from (but in conformance with) the TCP, to minimize potential impact to receiving waterways. The SW3P shall Include text describing the plan, quantities, type, phase, and locations of erosion control devices and any required permanent erosion control. b. The Engineer shall develop SW3P plans for Old Settlers Blvd, N Red Bud Ln, Porano Circle, and CR 110. This includes: I. Proposed erosion control design ii. Storm Water Pollution Prevention Plan (SW3P) sheets at 1"=50' 3. Standard Sheets using City of Round Rock and/or TxDOT Standards c. Deliverables: I. SW31P Layout Sheets ii. SW31P Standards 4. COMPUTE & TABULATE QUANTITIES a. The Engineer shall compute and tabulate quantities for all applicable pay items. b. The Engineer shall document assumptions and calculations for each pay item. c. Deliverables: i. Quantity Summary Sheets ii. Quantity Calculations and Assumptions 5. CONSTRUCTION COST ESTIMATE a. The Engineer shall provide a construction cost estimate with unit prices and bid schedule with each submittal (60%. 95%. and Final Plans). b. The Engineer shall provide a basis of estimate to detail assumptions made for bid item prices and formulas used (if applicable) for each bid item. c. Deliverables: i. Construction Cost Estimate ii. Basis of Estimate 6. SPECIFICATIONS & GENERAL NOTES a. The Engineer shall compile General Notes, Specifications and Special Provisions as needed. b. The Engineer shall prepare the Project Manual (Bid Documents), including a signed & sealed Cover Page, Bid Addenda, Bid Form, Technical Specifications, Plan Drawings, and Geotechnical Report. b. Deliverables: i. General Notes Sheets ii. List of applicable project Specifications and Special Provisions FC 164 - PROTECT MANAGEMENT & ADMINISTRATION 14 AGUIRRE & FIELDS, LP CITY OF ROUND ROCK CONTRACT: OLD SETTLERS EXTENSION SWA 01 TO WA 01 1. PROJECT MANAGEMENT & ADMINISTRATION a. Meetings L The Engineer has provided for four design meetings and six stakeholder meetings at two hours each. b. General Contract Administration i. Prepare invoices and monthly written progress reports for the project. ii. Project coordination with the City to include documenting correspondence and meeting minutes. iii. Project Coordination with Sub -Consultants to include documenting correspondence and meeting minutes. iv. Prepare, distribute and file both written and electronic project correspondence. v. Update project schedule as necessary. vi. Direct Expenses for travel and copies is included in the fee. FC 170 — STRUCTURAL 1. BRIDGE LAYOUT a. Bridge Layout - The Engineer shall comply with all relevant sections of the latest edition of the State's LRFD Bridge Design Manual, Bridge Project Development Manual.. Bridge Detailing Guide and AASHTO LRFD Bridge Design Specifications and respective checklists to prepare Bridge Layout (1"=40' scale) and Typical Sections for approval before proceeding to detail design. Additional Bridge Layout requirements for waterway structures include: L Design and 100-year peak discharges ii. Design and 100-year high water (HW) and any recorded HW data available iii. Natural and through bridge velocities for design and 100-year floods iv. Calculated backwater for design and 100-year floods v. Direction of flow for waterway crossings vi. Contours for water crossing b. Deliverables: L Bridge Layout Sheets 2. BRIDGE DETAILS & DESIGN a. Bridge Details & Design -The Engineer shall prepare final details and design calculations in accordance with standard requirements of the State as listed above. Specific bridge items relevant to this project include: i. Soil boring data will be utilized for foundation design and details. ii. Scour data will be incorporated in bent and foundation design. iii. Deck drains, as necessary. iv. Bridge lighting, as necessary. v. Sidewalks or shared -use path shall be included along each side of the bridge. TxDOT combination bridge railing with a minimum height of 42" shall be selected for use. vi. Non-standard bridge aesthetics are anticipated in lieu of standard TxDOT rectangular cap bents with circular columns. The level of effort in the detailing process is expected to be above that associated with a standard TxDOT bridge project. The Consultant will work with the City to develop the project aesthetic details. 15 AGUIRRE & FIELDS, LP CONTRACT: SWA01TOWA01 CITY OF ROUND ROCK OLD SETTLERS EXTENSION vii. Applicable TXDOT Standards will be printed by the Consultant for inclusion in the plan set. (Any TxDOT Standards modified by the Consultant will be signed and sealed for the modification.) b. Deliverables: ii. Bridge Detail Sheets iii. Bridge Standards 3. RETAINING WALLS a. Retaining Walls - The Engineer shall prepare plans, details and standards for up to eight (8) retaining wall locations. Fill embankment MSE walls are anticipated along each side of each approach to the bridge. Other retaining wall types such as spread footing, soil nail, or drilled shaft will be considered as appropriate although not anticipated at this time. Typical retaining wall layout (1"=50' scale) requirements include: i. Plan View 1. Designation of reference line 2. Beginning and ending retaining wall stations 3. Offset from reference line 4. Horizontal curve data 5. Total length of wall 6. Face of wall 7. All wall dimensions and alignment relations (alignment data as necessary) 8. Soil boring locations 9. Drainage, signing, lighting, etc. that is mounted on or passing through the wall. 10. Subsurface drainage structures or utilities which could be impacted by wall construction. ii. Elevation View 1. Top of wall elevations 2. Existing and finished ground line elevations 3. Vertical limits of measurement for payment 4. Type, limits and anchorage details of railing (only if Traffic Railing foundation standard is not being used on this project) 5. Top and bottom of wall profiles plotted at correct station & elevation. 6. Retaining Wall Details: As required for non-standard elements such as drilled shaft wall details or transitions from one wall type to another. 7. Retaining wall Aesthetic details: The Engineer shall provide details for, but not limited to, coping, fascia, rip rap and railings. 8. Limits of temporary shoring. 9. Underdrains 10. Soil improvement, if applicable. 11. Drainage, signing, lighting, etc. as noted above 12. Drainage structures and utilities as noted above iii. Typical Section 1. Reinforced Volume 2. Underdrain location 3. Soil improvements, if applicable. b. Deliverables: i. Retaining Wall Layouts 16 AGUIRRE & FIELDS, LP CITY OF ROUND ROCK CONTRACT: OLD SETTLERS EXTENSION SWA01TOWA01 ii. Retaining Wall Standards FC 309 — CONSTRUCTION PHASE SERVICES 1. CONSTRUCTION PHASE SERVICES a. The Engineer shall provide Construction Phase Services at the written request of the City's Project Manager. The written request shall include a description of the work requested, a mutually agreed upon time limit, and any special instructions for coordination and submittal. These services shall include, but are not limited to the following: i. Review and approval of Contractor Submittals, shop drawings, and forming details. ii. Attend pre -construction and pre -bid meetings. iii. Attend up to three (3) field meetings to discuss pole locations. iv. Respond to requests for information (RFls). v. Provide clarification as requested. vi. Provide corrected plans for any Change Orders. vii. Provide as -built plans upon completion of the project. viii. Review signal timing plans during construction. SUMMARY OF DELIVERABLES 1. FC 110— ROUTE DESIGN & STUDIES a. Design Concept Conference Notes for approval b. Design Summary Report (DSR) c. Signed/Sealed Geotechnical Report d. Boring Logs e. Updated Signal Warrant Technical Memo 2. FC 130 — RIGHT OF WAY DATA a. Legal description for each parcel (signed and sealed). Up to six (5) exhibits. b. Survey plat on 81/2"x11" for each parcel (signed and sealed). c. Area computation sheets for legal descriptions and plats and ROW maps for all parcels. d. SUE plan sheets e. Test Hole Data f. Utility Contact List g. Utility Conflict Matrix Spreadsheet h. Utility Conflict Layout Exhibits I. Utility Meeting Minutes j. Utility Certificates k. Electronic CAD Files 3. FC 131— UTILITIES a. Project Layout b. Utility/Project Specific Notes c. Utility Plan & Profile Sheets d. Standard Detail Sheets e. Special Detail Sheets (as necessary) 17 AGUIRRE & FIELDS, LP CONTRACT: SWA 01 TO WA 01 4. FC 150 — SURVEY CITY OF ROUND ROCK OLD SETTLERS EXTENSION a. Signed Right of Entry forms if ROE is acquired b. Reference Deeds, support documents, scanned and in .pdf format. c. Control Layout index map d. Horizontal and Vertical Control Sheet e. Survey Control Sheet f. Control Point Data Sheet g. 3D & 2D Topo (.dgn) processed files in MicroStation/GeoPak SS10, with all chains and points included on the 30% existing survey. S. FC 160 — ROADWAY DESIGN CONTROLS a. Title Sheet b. Index of Sheets c. Project Layout Sheets d. Typical Section Sheets e. General Notes Sheet f. Removal Layout Sheets g. Horizontal Alignment Data Sheets h. Roadway Plan & Profile Sheets i. Intersection Layout Sheets j. Proposed Grading Sheets k. Roadway, Sidewalk, & Driveway Detail Sheets I. Roadway Standards 6. FC 161— DRAINAGE a. Existing and proposed drainage area maps including hydrology calculations (25 and 100-YR events) b. Storm drain plan and profile to include 25 and 100-YR HGL & Q,V,D calcs per conduit link c. Lateral profiles to include 25 and 100-YR HGL & Q,V,D calcs per conduit link d. Hydraulic calculation sheets (25 and 100-YR storm events) e. Inlet calculation sheet(s) (25 and 100-YR events) f. Standard detail sheets g. Custom detail sheet(s), as necessary h. Proposed culvert extension plan and profile, calculations, and construction details. i. Quantity Summary Sheet j. Cost Estimate 7. FC 162 — SIGNING, PAVEMENT MARKINGS, & SIGNALS a. Signing & Pavement Marking Layout Sheets b. Small Sign Details c. Summary of Small Signs Sheet d. Signing & Pavement Marking Standards e. Existing & Proposed Signal Layout Sheets 8. FC 163 — MISCELLANEOUS (ROADWAY) a. Traffic Control Narrative b. Traffic Control Plan Sheets 18 AGUIRRE & FIELDS, LP CONTRACT: SWA01TOWA01 c. Traffic Control Standards d. Illumination Layout Sheets e. Illumination Standards f. Electrical Wiring & Conduit Charts g. Erosion Control Sheets h. Erosion Control Standards i. Quantity Summary Sheets J. Construction Cost Estimate k. Basis of Estimate I. List of applicable Project Specifications m. Project Manual 9. FC 164 — PROJECT MANAGEMENT & ADMINISTRATION a. Monthly Progress Report and Invoices b. Project Documentation and Meeting Minutes 10. FC 170 —STRUCTURAL a. Bridge Layout Sheets b. Bridge Detail Sheets c. Bridge Standards d. Retaining Wall layouts e. Retaining Wall Standards 11. FC 309 — CONSTRUCTION SERVICES a. Bridge Layout Sheets b. Bridge Detail Sheets c. Bridge Standards CITY OF ROUND ROCK OLD SETTLERS EXTENSION 19 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page 10 'ask Name Work Days 1 Old Settle. Preliminary Design Schedule 389 days 45 Old Settle. P$41E IS"gn and Construction 651 drys Schedule 46 Project setup 7 days 47 NTP for SWA02 0 mys 48 Projea setup & subconsultant agreements 7 days 49 Supplemental Survey 30 drys s0 Mobilization S days si Fieldwork IS days 52 Processing 20 days 51 ROW 20 der 54 Prepare ROW DOCvments 20 days 55 W%PS&E 90 days 56 60% design 35 days 57 Finalize easement limits 15 days 5a Design Concept Conference 0 days 59 Update Sign Warrant Tech Memo 30 days 60 Geotechnlcal Field Work 8 days 61 Geotechnical Laboratory Testing 20 days 62 Update Geotechnical Report 5 days 53 Update Environmental Reports 23 days 64 60% OA/OC(Internal) Idamn 65 Address t2A/OC Comments 5 days 66 Submit 60% PS&E Deliverables to A&F 3 days 67 Submit 60%PS&E to City 0 dark 68 60% PS&E Review IEy CUty) 15 days. 69 Finalize Bridge Deslgn/H&H 10 days 70 slnallze t meironmeMl Reports 13 days 71 Flood Plain Study 10 days 72 CLOMR 120 days 73 Prepare CLOMR Submittal 10 days 74 CtOMR Package Review (by Chyl 20 days 7S Submit CLOMR to FFW 0 days 76 CLOMR Review 90 days 77 95% PM 65 days 78 ".A di"r 40 days 79 95% OA/aC (Internal) 3 days 8o Address CU/OC Com menu S days $1 Submit 95% PS&E Deliverables to A&F 0days 82 submit 95% PS&E to city 0 days 83 95% PS&E Review (by City) ' Oar: 8A Final PS&E 56 days 8s Swal deign 35 days 66 Finalize Drainage Report 30 days Task Project OLD SETTLERS EXT split Date' Mon 9/27/21 I Milestone Summary Sun Thu 2/27/20 Tue 11/2/21 Tue 11/2/21 've 11,01YD %* 1:; 2/21 Thu 11/11/21 Thu IllIV21 Thu 11/18n1 Thu 12/9/21 Tue IIM/11 Tue I V23121 Tue 11/2/21 Tue 11/2/21 Tue IIt2121 Mon iln2/21 Thu 11/11/21 Thu 11/11/21 Thu 12/2/21 Thu 12/30/21 Tue 11/23/21 Tue 114122 Fri 1/7/22 Fn 1/24122 Tue 1/1a/22 1aa 1118122 Tue 2/8J22 Tue 2/8/22 Tue 2n2/22 Tue 310/22 Tue 3/8n2 Tue 3/W22 Mon 4/4/72 Tue 4/5/22 Tue 2AI22 Tue 2/9122 Tue 4/5/I2 Fri 419/22 Fri 4/1S/22 Tue 4/39/22 Tue 5110/22 Tue 5/IO/22 Tue 5/10/22 Pmjw Summary ...... ..... 1n 0,. Task ♦ Inan"Mllestone �1 I..." Summary �Finsh Thu 6n6/21 Tue 4/30/24 Wed 11/20/2I Tue :5.2'2'. Wed 1litoflI Wed 12/22/21 Wed 11/17/21 Wed 12/8/21 Wed 22/22/21 Mon "PI Mon 12/20/21 Mon 3/7/22 Mon 12/20/21 Mon 11/22/21 V11 --I Wed IU22121 Mon 11/22/21 Wed 12/29/21 Wed 1/5/22 Thu 17/23/21 Thu 116/22 Thu 1/13/22 Fri U 407..7 Tue 1/1a/22 Mon 2/21/22 Mon 2/21/22 Mon 3/7/22 Mon a/8/22 Mon 3/21/22 Mon 4/4/22 Man 4/4/22 Mon 8/8/22 Mon 5/9/22 Mon 4:4/22 Thu 417/22 Thu 4114/22 Fn 4/15/22 Tue 4/19/22 Tut 7126/22 Mon 6/27n2 Mon 6/20/22 ADDENDUM TO EXHIBIT C - SWA01 �f—L-m � A_LM �_.l�l—A S_�9��1 C �F M_LA�M_L! JJ._A _ S _ O�.N—LD_._J Prtdecesson, HA 1. Z022 Maltt 1427 aMlt 7, Z423 akaeL 1#1 no 1. JUA 0 _. _ F ld r1 0YY11/2 47 P 48 48 so 51 F�1 57 47 f�tia� 47 57 4= I lin 48 1611111111111111111 48 dilik 64�2 61 t $7 64 � tfl4 a Vie 68 68 69 71 73 44 74 75 68 68 79 • 4/15 ♦ 4/19 5. 83 83 83 I I Manual Task stanchly C 0-91no DuM-1, Finidrordv 3 Progress Marwai Summary Rollup [eternal Tasks Marwal Progress Manual Summary I�'� (Menial M,1.1-e Page 1 of 1 ask Name 67 Finalize Geotechnical Report 88 Final CA/QC llnternalj 89 Address QA/QC Comments 90 Prepare Project Manual 91 Submit Final PS&E Dellwrables toA&F 92 Sia"A Final PS&E W City 93 Final PS&E li— (by Gty) 94 Biddblg a Construction 95 r0RR Process,ng 96 et1mg 97 :.nostrum Project 98 As -Built Survey 99 Issue As -bulk OrawlrW 100 Prepare LOMR Submittal 101 LCMR P"Itsipe Review Iby City) 102 Submit LOMR 103 LCMR R"M 104 Project Closeout Task Project OLD SETTLERS EXT split Oate: Mon 9/27/21 Milestone Summary ADDENDUM TO EXHIBIT C - SWA01 Days Start Finish P.edecessoo Half 1. 2022 HW 2. 2022 HAM 1, 2023 Half Z. Z023 H.Pam O N D J F M A Ys 1 1 S C N D 1 F M A M 1 1 A S 0 N 0 ! M IO day. Tart S/10(22 Mon 6/20/22 63 � 3 days Wed 6/22/22 Fri 6/24/22 F S days Mon 6/27/22 Fri 7/1/22 a8 20 days Tue 6/28122 Mon 7/25/22 BS 0 days Fri 711/22 Fyf ?W2 7/1 1 day Tu4 7/5/22 Tw 71'L/12 15 days Wed 7/6/22 Tue 7/26/22 92 4S7 days Tue 111/9/21 Tue 4IW24 20 days Tue 8/9/22 Mon 9/5/22 76 1 day Tue 9/6122 Tue 916/22 95 2W days Wed 9/7/22 Tue 8/22/23 96 10 days Wed 8/23/23 Tue 9/S/23 97 10 days Wed 9/6123 Tue 9/19/23 96 30 days Wed 9/20/2.3 Tue 10/3123 99 10 days Wed 10/4/23 Tue 10/17/23 100 0 days Tue 10/17/23 Tue 10/17/23 101 ♦1'� lOy/T 120 days Wed 10718/23 Tut 4/2124 ID2 20 days Wed 4/3/24 rue 4/30124 103 ! Prp)m Summery Talk ♦ Inacthe Milestone inactive Summery 1 i Manual Task Start anM C Deadllne 41 Durauorronly, Finish -only ] Progress Manual Summary Rolkrp External Tasks Manual Progress Manual Summary Eatemal Mile — Page 2 of I AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT D - SWA 01 CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP PROJECT NAME: OLD SETTLERS EXTENSION TASK TOTAL TOTAL PRIME OTHER SUBCONSULTANTS TOTALS LABOR HOURS LOADED LABOR COST DIRECT COSTS FC 110 ROUTE & DESIGN STUDIES 194 73,900.00 $21964.40 $25,864.40 FC 120 PUBLIC INVOLVEMENT 92 $9,470.00 $9,470.00 FC 130 RIGHT OF WAY DATA 787 $3,780.00 $113,437.00 $117,217.00 FC 131 UTILITIES 275 $40,501.00 $40501.00 FC 150 SURVEY 171 $24,260.00 $24 260.00 FC 160 ROADWAY DESIGN CONTROLS 975 $107,880.00 $107,880.00 FC 161 DRAINAGE 1204 $164,270.00 $164,270.00 FC 162 SIGNING, PAVEMENT MARKINGS, & SIGNALS 353 $19,820.00 $26,490.00 $46,310.00 FC 163 MISCELLANEOUS (ROADWAY) 693 $62,380.00 $26,545.00 $88,92S.00 FC 164 PROJECT MANAGEMENT & ADMINISTRATION 311 $37,520.00 $20,836.60 $58,356.60 FC 170 STRUCTURAL 1236 $175,845.00 $175,845.00 CONSTRUCTION PHASE SERVICES 198 $14,660.00 $14,980.00 $29,640.00 LFC309 ES OTHER DIRECT EXPENSES $46,380.70$46 380.70 AND TOTAL: 6489 $42S,785.00 $46,380.70 $462,754.00 $934,319.7a Page 1 of 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT D - SWA 01 CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP PROJECT: OLD SETTLERS EXTENSION METHOD OF PAYMENT: LUMP SUM PRIME PROVIDER: AGUIRRE & FIELDS, LP COMPANY FEE % OF TOTAL FEE AGUIRRE & FIELDS, LP $426,470.80 46% HALFF ASSOCIATES $399,744.00 43% FORESIGHT PES $20,747.60 2% KIMELY HORN $74,788.10 8% CD&P $13,169.20 1% TOTAL $934*919.70 100.00% FUNCTION CODE TASK NAME AFLP HALFF FORESIGHT KIMLEY HORN CD&P TOTAL FC 110 ROUTE & DESIGN STUDIES $3,900.00 $13,804.40 $8,160.00 $25,864.40 FC 120 PUBLIC INVOLVEMENT $9,470.00 $9,470.00 FC 130 RIGHT OF WAY DATA $3,780.00 $113,437.00 $117,217.00 FC 131 UTILITIES $40,501.00 $40 501.00 FC 150 SURVEY $24,260.00 $24,260.00 FC 160 ROADWAY DESIGN CONTROLS $107,880.00 $107..880.00 FC 161 DRAINAGE $164,270.00 $164,270.00 FC 162 SIGNING, PAVEMENT MARKINGS, & SIGNALS $19,820.00 $26,490.00 $46,310.00 FC 163 MISCELLANEOUS ROADWAY 62 380.00 $26,S45.00 $88,925.00 FC 164 PROJECT MANAGEMENT & ADMINISTRATION $37,520.00 $9,396.00 $2,690.60 $5,600.00 $3,150.00 $58,356.60 FC 170 STRUCTURAL $175 845.00 $175,845.00 309 CONSTRUCTION PHASE SERVICES $14,660.00 $8130.00 $6,850.00 $29,640.00ES kFC OTHER DIRECT EXPENSES 5685.80 $39 750.00 $4 252.60 $1143.10 $549.20 $46 380.70 TOTAL $426,470.80 $399 744.00 $20*747.60 $74,788.10 $13,169.20 $934,919.70 PAGE 2 Of 19 AGU FIRE & FIELDS, LP ADDENDUM TO EXHIBIT 0 - SWA 01 CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP ASK DESCRIPTION PROJECT PROJECT ENGINEER ENGINEER IN IN TRAINING SENIORCADD ENGINEER TEENMOAN OPERATOR CLERICAL I TOTAL LABOR HOURS R com ISD-ROUTE A D®fil SIUOIES DATA COLLECTION • FIELD RECONNAISSANCE REVIEW AS BUILT R EITY PROVIDED PLANS REVIEW SUPPIEMEN7Al SURVEY 1 2 2 2 7 VISIT A FIEND RECONNAISSANCE 2 2 2 S DESIGN CRITERIA DESIGN CONCEPT CONFERENCE 2 2 DESIGN SUMMARY REPORT 1 2 3 HOURSSUB•TOTAL$ 6 I2 6 2 0 0 26 NTRACT RATE PER HOUR 5200.00 S1SOD0 S110.01) $62C 3O So= swDO OTAL LABOR COSTS SL200D0 $I,BW.W 5660D0 S240.00 $D.DD $000 S31900D0 DISTRIBUTION OF STAFFING i3.I% 46.2% 23.1% 7.7% OD% Mm BTOTAL(a 110) SSy0000 ASK DESCRIPTION PROJECT ENGINEER ENGINEER IN TRAINING SENOR ENGINEER TEOINICIAN CARD OPERATOR ADMM / CLERICAL, TOTAL LABOR HOURS R COSTS IM • SMU OF WAY DATA idE4 0/ WAY MAP INAUn PROPOSED RIGHT OF WAY A CONSTRUCTION EASEMENTS 4 4 9 REVIEW SURVEY Row DoNMENTS 2 4 EVIEW UTILITY CONFLICTS 6 COORDINATE WIL.7Y 4 22 OURS SUBTOTALS 7 10 B 0 0 0 2.5 NTRALY RATE PER HOUR 5200.00 $150.00 5110.00 $12000 Sw= W.00 OTAL LABOR COSTS SL"m S1.SO000 SWAG $ODD SO.w SOLID 3,7B0D0 DISTRIBUTION DF STAFFING 280% 40.0% 32A% 0D% DD% 00% .TAN I. UOI S3,7B000 PAGE 3 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXWB(T D-SWA 01 CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP uF RQY-9111 NAUF• AGI112IF A FIFL119_ ID ASK IHSCRIPDON PROJECT MANAGER PROJECT ENGINEER ENGINEER IN TRAINING SENIOR ENGINEER TECFINJOM U.DD OPERATOR ADMIN/ CLERICAL TOTAL LAWN ATM 1e0-ROADWAY 0lf0NN 1004FIR04S AY DESIGN HON20NTAL DESIGN 2 14 24 40 RTICAL DESIGN 2 14 24 40 REVIEW/INWPORATF ADIACE NT PROJECT DESIGN 1^ 95%.6 FINAL) a 1 24 32 a a 76 D OPENROADS MODEL 40 40 PROPOSED CROSS SECTIONS 150'INTERVALS) 1 12 30 4 $2 79 CROSS SECT)ON UPDATES I9S%, R FINAL) 1 12 30 4 32 79 PLAN S[T DRAFTING PROJECT TITLE$MEET 1 1 2 9 12 INDEX 1 1 4 a 1A PRDIFtt lAroU711'•2ar1 1 4 B 13 PROPOSEDLEXISTING MICAL SECTIONS 1 4 74 48 77 REMOVAL WYOUTI]-•50'1 2 a 24 34 AI AL4NMEM DATA 1 4 4 9 Y PLAN 6 PROFILE 1-=50'1 2 2 32 48 24 LTION LAYOUT (1'-2011 1 2 24 24 61 ED GRADING Il'FSD'1 a 17 3I S3 AY, SIDEWALK R ORNLWAY DETAINS 1 8 i 32 49 AY STANDARDS2 2 12 17 E/ASSEMBNE PSAE W%, 95 A FINALI 2 12 24 6 3I 76 w M QA/OC FOR SUBMITTALS 160%,95%. R FINA 12 40 40 92 U&TOTALS 33 200 366 22 3S2 0 975CT RATE PER HOUR Sm.00 $150.OD 511DA0 $220.00 $a0A0 swm 'LABOR COSTS 56.600/Xi S3D.000AO $40.4 M $2 640.00 SU,160.01) $0.00 31D7,BQOLD DISTRIBUTION OF STAFFING 3A% 203% 37.7% 23% 36.1% DR% PUlITOTAL LFC 1W) S3Q7A0A0 [AIPTIDN PROJECT NIANAGEA PROTECTIN ENGINEER ENGINEER TRAINING SENIOR TFCHN ENGINEER GOD OPERATOROPERATDR PDMIN/ CLERICAL TOTAL IABOR�URS PAVDADR •SWO" A ►AVEMENT MARKINGS 6 PAVEM ENT MARRING LAYOUT Tl'•50') 1 24 40 S6 321 GN DETAILS 1 4 16 e e 37 F SMALISISNS LL-00A 1 4 4 2 11 AVEMENT MARRINGSTANOAROS 1 2 4 e 15 r TOTALS 4 34 64 a 74 0 1B4 LT RATE PER HOUR S20DA0 SIS0.00 S110AD S120.00 510.00 Sa0.00 eOR COSTS Sa00A0 SS,100.00 S7,04D.00 5960D0 SS.920.00 50.00 $19A20�0 AUT10NOf STAFFING 19% 163% 30.9% 38% 11.6% D. L WC 1621 S7l i2DA0 PAGE 4 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT 0 - SWA 01 CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA Ol AGUIRRE & FIELDS, LP oMMC »nvin[% NAMF• A1211111IF A FIFL[Il_ 1 ASK DESCRIPTION PROJECT MANAGER PROJECT ENGINEER ENGINEER IN TRAINING SENIOR ENGINEER TECHN93M UOD OPERATOR ADM1N / CLERICAL TOTAL LABOR HOURS &COSTS In. MMORLANEXIM POADWAn K CONTROL FICCONTROLNMRATIVE 2 4 4 4 14 FIC CONTROL LAYOUT(1'•501 1 16 40 46 105 CP STANDMOS 1 3 B 4 15 NCONOIOL WPL,.AVO,0 1'•SO'.I 1 16 32 48 97 P3 STANDARDS 7B 4 14 MPUTE & TABULATE QUANTITIES MPUTE TCP QUANTITIES (60%, 95%, & FINAU 1 4 B 13 EVELOP TC►SUMMARY SHE F73 4 4 4 12 MPUTE REMOVAL QUANTITIES 60%, 95%& FINAL) 4 4 B EVE LOP REMOVAL SUMMARY SNEETS 4 4 4 12 MPUTT ROADWAY QUAMrMES:W%, 9ST(& FINAL) 1 4 24 29 DEYELOP ROADWAY SUMMARY SHEETS 4 B 4 is MPUTE SIGNING & P0.YEMEHT MARKING QUANTITIES ;60%, 9S%. &FINAL) 4 12 16 DEVELOPSMNING& PAVEMENT MARKING SUMMARY SHEETS 1 4 4 4 13 MPUTE SWP3 QUANTITIES (60%, 9S%, & FINAL) 1 4 B 13 EVE LOP SWP3 SUMMARY SHEETS 4 4 4 12 NFTREKTION COST ESTIMATE W%, 9S%. & ESTIMATE 6 16 14 46 BASIS OF ESTIMATE 2 4 4 10 OFKA7IOA4 &GENERA! NOTES PECIFICADONS & SPECIAL PROVISIONS 4 6 4 74 fN iFAL NOTES 4 4 4 12 PRf►ARE PROJECT MANUAL 6 32 16 54 NOURSSUB•TOTALS 31 242 224 0 12B O S25 NTRACT RATE PER HOUR $2DOAX $150D0 $11000 5120.00 $60.OD $110.00 T'I LABOR COSTS S6,200.90 S21.30000 $24.64000 $OJJO $20.74000 S000 561,3BD00 DISTRIBUTION OF STAFFING 145% 68.3% 107.7% D.0% 615% DAM BTOTAL (FC 1631'�-� PAGE 5 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT D - SWA OI CITY OF ROUND ROCK CONTRACT; FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP ASK DESCRIPTIONMANAGER PROJECT PROJECT ENGINEER ENGINEER TOBNG M SENIOR TECHN ENIN MID OPERATOR ADMN I CLERICAL TOTAL O SRS LABOR COSTS 154- /RDIELT YANAG72MDff & ADBOm1MTTOR ENEMARA ADMINISTTION ROACT MANAGEMENT L COORDINATION WITH CORR EI4 MOWHS) 1B 14 TO ROIECT MANAGEMENT& COORDINATION WITH SUB CONSULTANTS J14 MONTHS) S6 14 70 -PARE WJOICES & MONTHLY PROJECT PROGRESS REPORTS (14 MONTHSI la 1 14 70 ITFHD& PREPARE FOR FOUR(4) DESIGN MEETINGS I 1B 16 TTENO L PREPARE FOR UP TD SIY [6) STAKEHOLDER MEETINGS 12 12 24 NWRS SUB -TOTALS 146 4a 0 0 0 14 201 WMR RATE PER MDUR $200.00 $150.00 1110.00 $120,00 SB0.00 $BOw DTAL LABOR COSTS S29.200A0 $7.200.00 $0.00 50.00 SOAO $1120.00 $37,520-00 DISTRIBUTION OF STAFFING 70.2% 23.11L OA% 0,0% OD% 6.7% BTOTAL IK u41 S37A10.00 PAGE 6 OF 19 AGU FIRE & FIELDS, LP ADDENDUM TO EXHIOTT D - SWA 01 CITY OF ROUND ROCK CONTRACT- FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP PRIME PRMRDER NAME- AGUIRRE & FIELDS. LP ASK OES wnON SENIOR STRUCTURAL ENGINEER STRUCTURAL ENGINEER ENGINEER IN TRAINING TECH CAOD OPERATOR ADMOf/ CLERICAL TOTAL LABOR HOURS &COSTS FICIM-STRUCTUNJUL SJUDGE LAYOUT BRIDGE LAYOUTS (1'"V—le) US & WS Brio 150%, 959C FINAL) 12 22 22 8 8 72 BRIDGE OYPICAL SECTIONS IEB& WSB ef)(W%, 95%, FINAL) 2 12 10 4 4 32 LOG SHEETS (95%, FINAL) 1 9 a 3 3 24 ETAAS&DESIGN ED BRIDGE QUANTITY SUMMARY & BEARING SEAT ELEVATIONS 16D%, 95%, FINALI 6 2B 22 a a 72 FIDGEORING NT DETAILS(60%,951L FINAL) 12 Sa 44 LS i5 144 AILS 60%. 9514. FINA 12 sa as 15 1s PLAN (60%, 9S%. FINAL) 4 16 12 4 4 40 ONCRETE GIRDER UNIT PLAN (601L SIM NNAM 6 24 1B 6 6 60 ONCRETE GIRDER UNIT TYPICAL SECTION 60%, 9%%, FINAL) 6 24 111 6 6 6D BRIDGE AESTHETIC DETAILS95W FINAU 3 14 11 4 4 1 36 IGND DETAILS& GIRDER DE51GN(60%, 95%, fINAtl 2 12 10 4 A 32 PREPARE TXDOT STANDARDS 3 9 6 3 1 24 REVIEW GENERA. NOTES. SPECIFICATIONS & PROVISIONS 4 6 10 20 COST ESTIMATES (WY, SSA. FIMR 2 4 10 i6 COMMENT RESPONSES 16M 95%1 a B REVIEW MEETINGS 160%95%1 9 & FOR 601A, 9S%, & FINAL SUBMITTALS 20 4D 6O IRI.PARE FINAL BRIDGE CALCULATIONS PDF 2 4 20 16 ID & PRE.CONSMU[TION MEETINGS aINING [C WADS ALIGNMENT DATA SHEETS 1 9 B 3 3 24 LAYOUTS (1'•40' uak 60%. 95%, FINAL) 14 Sa M 14 14 144 T1'PIEAL SEC'DON5160%.95%. F11uLL1 5 19 14 5 S AB ING LOG SHEETS (95%, FINAL) l 9 B 3 3 24 ALL AESTHETIC DETAILS 195106, FINALI 3 14 12 4 4 36 ESTINMTEO SLIM MAM OF RETAINING WALLS 3 14 11 4 4 36 RW MSE{ID0)DESIGN DATA u4RF Cowdlm nwRh Geo h 9S%, FINAW 1 9 a 3 3 24 PREPARE TKDOT STANDARDS 3 9 6 3 3 24 152 492 365 219 20 0 1136HOUR M..STAFFi $210.00 S360.00 5115.00 5125.00 SBSDO SWDO $31,920D0 S76,960DD $42,97SD0 SL4,575.00 S1Q125D0 som S17S,U5.00 TAFFING 123% 399% 29.9% 9A% 99A OD% pMAL RFC 170) 5175A4SD0 PAGE 7 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT D - SWA OS CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 03 AGUIRRE & FIELDS, LP AnuRRP R. aotnc Io CR1nON PROJECT MANAGER PROJECT ENGINEER TRAINING SENIOR TECHNICIAN CADD OPERATOR ADMIN/ CLERICAL TOTAL LA�COS16 ONSEL ICTION PHASE SERVICES CNON SERVICES NOORECONSTRUCTONiPREi10 MEETINGS O 6 6 32 APPgOVAL Of SHOP DRAWINGS (heama, ptMh. oinD, Iolms. MSC wall t It 30 NENGINEER TO REQUESTSFOR I14FORMAT'ON RFI) 4 16 S 28 CLARIFICATION AS REQUESTED 4 4 8 16 LK THROUGH & PUNCH UST 4 4UB•TOTALS 24 S4 16 0 0 0 94 T PATE PER HOUR S200D0 $1S0.00 S110.00 $120.00 SSD.00 S80.66 BOR COSTS $4,WO.00 54100.00 51.76D.00 $0.00 50.00 $OJ30 $14,IW40 BUTION OF STAFFING 115% 26A% 7.7% 0.0% 0J71A OA% &TOTAL ITC 309) 1 1 $34.6w.D0 1OTALMIFSYFC WTALCOSTS&v C 11E & DESIGN STUDIES F0 ROUT 26 S3.900.00 PC IM RIGHT Of WAY DATA 25 S331101W FC 160 ROADWAY DESIGN CONTROLS 97S SID7,mDw FC 162 • SIGNING. PAVEMENT MARKINGS. & SIGNALS 164 S29A2DDD FC163 MISCELLANEOUS(ROADWAY 525 'OO FC 164 PROJER MANAGEMENT i ADMINISTRATION 208 S3I.S2DA0 FC 170 STRUCTURAL I236 537SAASM FC309 CONSTRUCNONPHASESERVICES 94 S14,660.00 RTOTAL LABOR UKNSES 3173 W5,13&.00 @fl{Si3 EJMR &OF OIQIS C06T MJk ]D miles RT a 101H mar 1B0 50-% SIO0.S0 Phot—pea 8/W III 1/2' X I " each 200 50.15 $30.00 Phi vp-BMJ '.1lo X 17•) IW%. 9S%, FINAL Su mNtr�,WU'G 0—faChl each IWO SO.25 S4+D.DO Plots Color on bond E,NdDFT4 --- --- tf 50 1.75 5105)10 [SUBTOTAL DIVER EXPENSES Sol" DIAL COSTS. PRIME ONLY S425.785 NON -SALARY OTHER DIRER EXPINSW FOR PRIME ONLY 685.80 RAND TOTAL FOR PRIME Si2i,470J0 PAGE 8 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT 0 - SWA 01 CITY OF ROUND ROCK CONTRACT: FEESCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP ASK UESCRI/TION SENIOR PPLS SURVEY TECH 2-MAN SURVEY CREW TOTAL LABOR HOURS L COSTS 1l0. MWOF WAY DATA RIGHT OF WAY LAM R4iNT Of WAY VERIFICATION B 16 20 44 RIGHT Of WAY DESCRIPTIONS/EXHIBITS I51 12 96 106 RIGHT OF WAY MONUMENTATION it3ol 2 16 40 Sa OC/fINALOELNERABLES B 4 L2 HOURSSM70TAL5 30 L32 60 122 HTRACT RATE PER HOUR S390.00 5110L0 S170.00 OTAL LABOR CASTS 55,70040 S1S,040DO S10.700110 SSL740100 OWRIDUTION OF STAFFING 135% 59.S% 27.0%, TOTAL (FC 13D1 S311.74040 ASC OESCAIPTION SENIOR ENGINEER IFTIIITY MANAGER UTILITY COORDINATOR SUE CREW MAkAGER 2 PER SUE / SURVEY CREW CARD/GK TECH MNTRACTAD A N SPECIALIST ADMIN ASSlSTAM TOTAL LABOR OURS A COSTS FC 1W- RIGHT OF WAY DATA UUURFACE UTILITY ENGINEERING ISUn E Lv18 4 1 10 is B i 2 36 SUE LVL A ILABOR ONLYI 2 7 16 4 24 XPENSES FOR TEST HOLL PERMIT O TRAFFIC CONTROL RELATED TO LVL A SUE) 0TAL5 6 1 2 26 14 8 1 2 W PLATE PER HOUR S195.00 S215.00 5160<!O S350�0 $170A0 595.00 SOS.OD S65.00 EMALMABORC-OST-S SL170.OD S215AD $320.00 S3,900.00 523W.00 5760E10 SO5.00 $W"N OE STAFFING 10.0% 1.M 33% 433% 233% 133% 1.M 33% .I Ss - PAGE 9 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXNI8TF D - SWA 01 CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP ASK DESCRIPTION SENIOR PROIEP MANAGER SENIOR ENGINEER PROIER ENGINEER GRAOUATE ENGINEER JUT) � MANAGER UTILITY COORDINATOR ryUDD/G6TECH ADMIN ASSISTANT TOTAL TABOR HOURS & COSTS FICIP-RMITOFWAYDATA UOUTY OMRDIMLTKM TUC) INITIAL PROJECT PLANNING 4 4 4 4 A 20 COORDINATION ACTIV17IES L MEETINGS :R 8 80 104 ISSUE NOPC/ RfCFNE NOPC RESPONSES 1 16 17 CONFLICT ANALYSIS UCM& EXHIBITS- EXTERNAL ENTITIES 1c 4 RO 2A 124 REVIEW OF UTIUT'f5 PROPOSED ADJUSTMENTS/COORDINATE COMPLIANCE 2 46 48 ISSUE NORA/RECEIVE NORA RESPONSES 16 2 6 24 PREPARE PROPOSED UTILITY LAYOUT MODEL 8 8 2 8 1S 46 UTILITY CERTIFICATION / SPECIAL PROVISIONS 2 24 26 REVIEW OF FINAL RE LOCATION PLANS &PERMITS 4 36 40 CLOSE OUT 1 10 4 B 6 1 31 HOURS SUS -TOTALS 7 4 10 1 66 29 308 1 S4 2 480 CONTRACT RATE PER HOUR 5250101) S795.00 5171m S117.00 5215.00 5160D0 595.00 SfSm OTAL LABOR COSTS SL750m 5780m S 710m S7,727m 56,235m 549.28040 55,130m 5ll0DO 57L737.00 DISTRIBUTION OF STAFFING 13% 01% 2.1% 131% 6D% 64.2% 113% 0.4% URTOTAL (FC L40) $7X737.00 ASK DESCRIPTION REVIEW ENGINEER ENGINEER SENIOR ENGINEER GRADUATE ENGINEER((TT) 5EXIORSURVEY MGR RPLS SURVET TECHNICIAN CADD/GISTECII CONTRACTADMIN SPECIALIST ADFAN ASSISTANT TOTAL LABOR HOURS &COSTS I.A. umMU UTILITIES WATERLINE DESIGN 9E 161 2$J ONOC B 6 ATERUNE EASEMENT DOCUMENT PREPARATION 2 B 10 HOURSSU&TOTAIS 1 94 163 2 8 27S CONTRACT RATE PER HOUR S220 D0 $296.00 5117.00 5190.00 S12D.00 OTAL LABOR COSTS S7,760m S18,330m 5291071m S380m $960m $40,501m DISTRIBUTION OF STAFFING 2.9% 34.2% S93% 0.7% 2.9% UR70TAL IfC 131) $40,501.00 PAGE 10 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT D - SWA 01 CITY OF ROUND ROCK CONTRACT. FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, UP ASK DESCRIPTION SENOR RP4 5uwev TEaF 2-MAN 9JRYEY CREW TOTAL LAWR NOURS &COSTS 1N-$LIIIVEV URVU ESTABUSH HORIZONTAL A, VERTICAL COMROL 4 40 10 54 TOPOGRAPHIC DESIGN SURVEYING 1 70 12 33 [SUE SUPPORT 1 1 B 10 BATHYMETRKC SURVEY 20 20 41 BUILT BRIDGE SURVEY 112 12 8 21 OA/OC FINAL DCUVERABLES 4 B 12 101 SB in HOUR M 5190.00 5120.00 $170.00 713DJ70 $12,770»0 S9,B60110•MmTAFFING 710% S9.1% 339% UBTOTAI IFC 130) 524,260.00 TASK DESCRIPTION SR. PROTECT AANAGER SR REVIEW ENGINEER SENIORENGINEER PROJECTENGINEEA IUNIORENGMEER GRADUATE ENGINEER(EfY) CADD/GISTECH AD&PHASSISTANT TOTAL LABOR HOURS &COSTS FC 363-DRAINAGE DRAINAGE BRIDGE SCOUR J 40 25 T2 FINAL DMINAGf REPORT 9 60 40 109 CLOMR 1 16 BS 60 362 LOMR 3 36 60 45 222 STORM DRAIN DESIGN (60%. 9S%, FINAL 10 36 175 360 120 721 QQQC FINAL D(WERABLES 16 is HOURS SUBTOTALS 12 66 36 175 24S 550 120 0 72D4 CONTRACT RATE PER HOUR S2S0.00 S220.00 519SD0 S172,00 S339.00 S117M $95.00 563m DIAL LABOR OOSTS 53,000.00 S14.=110 $7,020A)0 S2992500 S34,DSS.0D S64.3%.00 SI3Amm $0.00 $164.270.00 DISTRIBUTION OF STAFFING 1.0% SS% 3A% 14S% 2031E 45.7% 10.0% 020% uno7u tFc 162) S1E4.270.00 PAGE 11 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT 0 - SWA01 CITY OF ROUND ROCK CONTRACTFEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP TAU DESCRIPTION SR PROJECT MANAGER PROJECT ENGINEER CONTRACT ADMIN TOTAL LABOR HOURS i COSTS 11CM-PROSECTMANIAGOIRIENT AUN04STPATI M ENEBAL ADMINISTRATION PROJECT AOMWKTRATION i MANAGEMENT ITMONTHS 4 12 30 MONTHLY PROGRESS REPORTS i INVOICING 17 MONTHS) 7 T 14 PROJECI COORDINATION MEETINGS (14 BI-WEEKLY C 30 MIN, 30 1.5ITR) T 12 18 HOURS SUB TOTALS 14 31 7 52 CONTRACT RATE PER HOUR $2501011 S171A0 S4SA0 oTALLASORCOSTS S3,50000 SS,301.OD S59S.00 S9A%JA DISTRIBUTION OF STAFFING 26.9% 59.5% 135% 6TOTAL (FC 164) DESCRIPTION SR PROJECT MANAGER PROJECT ENGINEER GRADUATE ENGINEER(EIn CONTRACT AOMIN SPECIALIST TOTAL LABOR COSTS i COSTS CO46TB0[TI011 MWfE SO M OIS SERVICES AOMINi MANAGEMENT 12 MONTHS 6 12 16 INWOICE5 i MONTHLY PROJECT PROGRESS REPORTS 12 MONTHS 6 :1 1S hlWOJCZ5 AL SUBMIRALRMIEW BTOT 4 16 20 T FOR INT-0RMATION (AFh) I2 TOTAL) 2 610 UBTOTALS 6 5 42 12 CT RATE PER HOUR S195AO 5171,00 S117.00 5BS.00 ABOR COSTS $2,170OD SL026.00 S4,914D0 $2.02000IBUFION OF STAFFING 9.1% 9.1% 63.6%AL (PC 309I PAGE 12 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT D - SWA 01 CITY OF ROUND ROCK COACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA OS AGUIRRE & FIELD$, LP DESCRIPTION TOTAL MH RY K TMALCOMBYK FC 330• RIGHT OF WAY DATA 762 S1I3AP= FC III • UTILITIES 275 5i0'SQ1D0 FC 250•SURVEY 171 $24260.00 K 161 • DRAINAGE 1204 $164170DO K 16i • PROJECT MANAGEMENT & ADMINISTRATION S2 S9196DD K0UCN 13DO WIXOilwESEYCES 0 S69 WE OOFUWn OMT SUE LVL A (Uo m IS t N0k5) FA i5 SI,500.ODO S22.500.00 SUE CORR ROW PERMIT EA 1 SIDOODO $% DO SUE CERTIFIED TRAFFIC CONTROL DAY 1 Si.600D0 51.60DD0 IDDE1tSE FEMA ONLINE CLOMR FEE EA 1 S6,SOODO S DO FEMA ONLINE LOMR FEE EA 1 5B.000DO$&,000DO COURRIER FEE EA 2 75.00TAL OOIECT EXPENSES $39,7SOD0 1.A0.00. CO5T5 FOR SUB CONSULTANT NOFISAURY OTHER DIRER EXPENSES FOR SUB CONSULTANT 539,99L.0 VAM0 TOTAL FR SUOONULTAM M PAGE 13 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EILHI&T 0 • SWA 01 CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGU FIRE & FIELDS, LP SUR PROMOFR NAMF: FORESIGHT FES ASK OESCAIPTION PROJECT MANAGER PROJECT ENGINEER ENGINEER IN TRAINING SENIOR ENGINEER TECNNICIAN CADD OPERATOR ADMIN/ CLERICAL TOTAL LABOR HOURS &COSTS PC 11D • R011TEDeam aSTUM EOTECNNICAL INVESTIGATION & FIELD WORK STAKE BORE HOLES 4 4 UTEUTY CLEARANCE M411) 1 i1 ROE COORDINATION WAANOLORD 0 PREPARE PRELIMINARY PUNS OF BORINGS FOR RMPN 1 1 3 4 DRILLING COORDINATION & LOGGING 1 2 16 19 REVIEW FIELD LOGS 1 1 2 4 ASSIGN LABORATORY TESTING 1 1 2 4 LABORATORY DATA REVIEW 1 1 i 3 BORING LOGS PREPARATION 1 1 4 6 RETAINING WALL ANALYSIS (REVIEW LAYOUT. M DEVELOP $OIL PARAMA'ERS) 1 1 4 6 RETAINING WALL DESIGN IPROVIDE GLOW STANUTY& EMRWLL STABIUTY PESJLTSI 2 3 12 17 DRAFT REPORT PREPARATION 3 4 I3 2S FINAL REPORT PREPARATION 2 2 12 16 OC 3 6 1 9 HOURS SUBTOTALS 17 23 78 0 0 0 218 OMTMCT RATE PER HOUR S203.17 $142.77 $90.60 $6589 OTAL LABOR COS" $3,40.0 S1283.71 57M6M SODO SOAR $0.00 S13.664A0 DISTRIBUTIONOF STAFFING IAA16 19.5% 66.2% OD% 0.0% 00% ISUSTOTALIFC 110) s13,M►.40 PROJECT MANAGER PROJECT ENGINEER ENGINEER IN SENIOR ENGINEER TFCHNIC4W CAOD OPERATOR AOMIN; CLERICAL TOTAL UBORXURS71WNING COSTSOW MANAGEMMT iAOMINIFMTIGI{ & M15C COORDINATION 1 S NVOICES& MONTHLY PROJECT PROGRESS REPORTS4 IO EDESMPTIONAIPTKIN BTOTALS 1D 0 0 0 0 10 20 T RATE PER HOUR 6203.1T $IA2 77 590.60 S6S.OR COSTS 53A327D 50.00 SOAO SODO SD.oD S65B90 $2UTIONOFSTAFHNG S00% DD%IFO 161I{ 5261oa PAGE 14 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXNIBR 0 • SWA 01 CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA01 AGUIRRE & FIELDS, LP 11.11"DpN TOTAL MN SY FC TOTAL COM Sr FC T{330- ROUTE OEUGN& STUDIES 116 S1111104.40 FC 164 PROrtCf MANAGEMENT & ADMINISTRATN)N �'�'� .TOTAL 1.41110111 ERRENSES 139 SIGAm 0 OIFOQlS uwr ROFUNM C06T 2-Reulnl Wal. Borinp p20' I Bon Rock forul w/o TCF(<6D ft.l It 0 WAD SOm co I B4rir�dRxa Co with TCP{<60ft.) N 40 $35.00 S1.400m I BonnTJReek Co with TCP t> 0 ftJ R 0 S40.00 SO•D Buehok Grout) B.Mo A. chip. B 40 S8.00 S32am OnB Crrw MopllNxlon mile 20 SS.00 $1Wm UtKonflnetl Carnbretttue St Sale exh ♦ S65.00 S26Dm Compe11 St mNih (Rock) each a $8500 SOW Soluble SuMate Content of Salk exh 1 SSS.00 SSSm DetermineLiquid Limit of Solis exh S S42.00 $210.00 Dett-Ine Plestk Um4 of Soh exh S 542.00 $210400 DelermWnB 0* Amount of Materul in So Is Nlet than Me 78 at tnsmeter(Minus S 200; each 7 MAO $350m P&Mede Stre Ara of Solh exh 4 570.00 SMOG Del—ini-8 the Mobhee Content In Solo exh 12 $1300 $156m M.df*d Procbr Ten exh 0 S300A0 $0.00 Dymmk Cone Penetrometer exh a S30m m St.nd,ard Ten Method for Moisture. Ash, and Ong— Maaer of Peat & Othe OeBank Seth exh 0 S120100 Sam Ume 5e - ra-121-E Part 1 exh 0 51SOD0 $am As0ME Patch exh 0 WAD $0.00 W e Mlle 20 SO-S6 S11.60 raHk Cantral5tmces. 4rr4w Bdrds6 Aaenuator Tru[ks Med,uro Fro)M:lnWdn Nbor. Wpmmt fuel{ DaY O 51.730Dt1 $Om ne Olrn-sloMl ConFWlNden each 2 S450A0 $9wm ffomta Bea ""*(SI immi p without MD Curve) each O S300m Sam —M U.TOTAL 01RECT wits S I i I I I humm— OTAL COST$ FOR SUB CONSULTANT W... NON-SALARY OTHER DIRECT ER►ENSTf FOR SUB CONSULTANTRAND TOTAL FOR SUbM011SULTANT S PAGE 150E 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT D-SWA Ol CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP SENIOR ►ROFE4gNAL 11 SENIOR PROFESSIONAL PROFESSIONAL ANALYST AOAUN/ CIfWAL AL LABOR T"OURS & COSTS bElR i D Pf1LLECTION i FIPA RECONNAISSANCE TE WITH SLBCONSULTANT TO OBTAIN TRAFFIC COYMS 1 2RCKGROUNa TIA FROM CPT 2 4 3 1 6 kV:W fMG WfF]IINGOPERATIONSBUTE E!<ISTING&PRIMER FUTURE TRAFFIC VOLUMES 1 2 4AR ANAYSIS2 4 8AL MIMO 2 4 30 16U6-TOTALS 0 9 17 34 0CT RATE PER NOVA $155.00 $220A0 SIR0.00 $11C.D0 S95.00 B011 COSTS SD.00 $L9B0I10 53.D60D0 53.120.00 $Q00 $8,260.00 01STRIBUTION OF STAFFING D1FIi I&O'A 1 34.0% 48.0% 0.0% Al (K 31% fR 1fOL0 SCRPTFON SENIOR PROFESSIONALHPROFESSIONAL SENIOR PROfES5M7NAl ANALYST ADMIN/ CLfRWAL TOTAL R HOURS IABOrimi t70S15 PAVtlfPME •9011ALS DEWNLAYOUT SHEET 4 10 2S 39 ELEVATION SHEET 1 3 6 10CAL WINING& CONDUIT CHARTS 2 4 6 uG2 KTA.L.RCOM 4 7ERMINATION3 6 30 ITIES & GENERALNOTES 2 4 6 RE081/O NNE SIGNAL FED- POLE NMOIFICATIONS • B 20 3ITALS(60IE 95%. fiNAL1 B ES 30 53 SUBTOTALS 0 23 49 97 0 169 CI RATEP" HOUR S255.00 $220.00 SI80.00 SM.00 S95.00 LABOR COSTS 50.00 SSA60.00 58.820.00 512,610.00 $0.00 S26.490.00 DISTRIBUTIONOF STAFFING RO% 11.7% 29.3% .7% DA% AL (K 1621 S26AW" PAGE 16 OF 19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT0 - SWA 01 CRY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA Ol AGUIRRE & FIELDS, LP S11R PROVIDER NAME. CIMLE9 NORM T. pE5CA1POOF1 SENOR MOFE5501 NALR PROF NESSONAL OR PROfE550NA1 ANALYST ADUM TOTAL W00. MOORS L COSTS ail-M7ECLLAWA6 ANA110N DESIGN PHOTOMETRIC MODELING 3 4 6 20 32 ILWMINATION LAYOUT SHEETS 4 10 24 40 ELECTRICAL VOLTAGE OR04'CALCS J 6 SD 19 [ONDUAi WIRING CHARTS J 4 17 is F5 2 4 B 14 BMTTTALS(60%. 951S. FINAO 2 6 12 2S 45 AS SU4ICTALS 3 27 42 99 0 ILi NTPACT PATE PER HOUR $2t10D $22.0.00 S30-0E %W 00 S95.00 OTAL LABOR COSTS S1.275.00 54B4pm $7.$W.00 S3.ixmw SOm $26,545,00 DISTRIBUTION Of 57APWG 3.0% 13.1% 2SA% 58.996 00% bUNTOTAl. (FC 101 $7i36S-Oo —I- IPTION SENIOR PROFESSONALR SENIOR MCFESSONAL' PROFESSONAL ANALYST ADMW/ CLERICAL TOTAL LABOR HOURS i BUSTS MXT MANAmmff i ADMIEB1FIYlT10N WATRND TWO 7 PROGRESS MEETINGS OROINATION, PREPARE INVOICES L PROWESS REPORTS 10 S 4 4 23 Ll..EFW.n-END TOTALSO 14 9 4 4 31 TE PERHOUR 5255.00 $220.00 $160.00 SL30.00 595.00 RCOSTS $0.00 $3,o80m SL620.00 S520m $380.00 55.600mON OF STAFFWG CA% 45.2% 29.01E 12.9%1291E.16q PAGE 17OF19 AGUIRRE & FIELDS, LP ADDENDUM TO EXHIBIT D -SWA 01 CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA 01 TO WA 01 AGUIRRE & FIELDS, LP .—I. nuIFN NnaN SENIOR PROFESSIONAEII PROFENIOR ESSIONAL' PRpfESSIDNAI, ANALYST C�CII TOTAL N600.MOUa(vrlKanuanN rwDasavlmCT10N SERVI[6I FIELD MEETINGS 6 6 12 TO 3 RFIS LAIKDESCRIPnONCRIPf10N S CONTRACTOR SUBMRTALSj. TO S SHEETSFOR CO 14 6UI TOTALS G 14 U 11 O 3& CT RATE PER HOUR S2S5.00 $22D.00 SIM-00 5130A0 SSS.00 ROR COSTS SOAO S3ARO.00 52,W.DD SIAXOO 50.00 S6AS0J)D RUTION OF STAFFING 00% 45.2% 419% 355% aim (FC 3" $$ASDAD DESCRUMON 7DTAL MN 6Y FC TOTAL OOSTS {Y K 110 ROUTE & DESIGN STUDIES SD SR'160.00 K 162 SIGNING, PAVEMENT MARKINGS. & SIGNALS l69 76 90A0 FC163 MISCELIANEOVSJROADWAYI 166 $26.545.00I KIN-►ROJECT MANAGEMENT& ADMINISTRATION 31 SS,SOODO K 309 COMUM-MN PHASE SERVICES 38 S6.E5D.00 TAL LA&OR E UPENSES i i I 1 1 4S6 DOOn6 LRAET 0DIUNE71 emr MI 16--4FRTLIW I IO.S1 537.1D D/W Ir K1Y IAT 90%SuEmitnq ..h 60 SO.10 $12.00 TMRCCa MWKCo US, eAdl I11K100 l7O0A0 AL DIRER DES 53.141.10 PERMITS FOR SUR COMULTAM 573,64S. SALARY OTHER DIRER DIPFINSES1 FOR SUN CONSUL ANT 21,143.10 PIANP TOTAL FOR S36CONSULTANT $74.7" PAGE 18OF19 AGUIRRE 6 FIELDS, LP ADDENDUM TO EXHIBIT D - SWA 01 CITY OF ROUND ROCK CONTRACT: FEE SCHEDULE OLD SETTLERS EXTENSION SWA Ol TO WA Ol AGUIRRE & FIELDS, LP SIA PAEIVInFB NAAAF• f v TASK DESCRIPTION PROTECT MANAGER SENIOR PUBLIC INVOLVEMENT $PEOALIST GRAPHIC DESIGN L WEB DEVELOPER PUBLIC INVOLVEMENT SPECIALIST JUNIOR PUBLIC INVOLVEMENT SPECIAUST TOTAL LABOR HOURS 6COSTS PC 12 0 - PUBLIC IPOWMYlkI OUTtlA01 M)*XDFA COMMUNICATIONS L UPOATDS UpdaLe geYeAolder m m A B 11 SUItcholder mmmuwAti— 12 6 6 24 Cnordl bo, Wlttlt ,Mtl OPCunenOnao oT meeli VrNR sbkehydenT MSS 16 e A 2E U M. RuurHls fact IIIee6, FACII) 2 6 A 12 C.n .uAamM webpm 2 2 HOURS SUB -TOTALS 30 16 0 20 B 7E NTRACT RATE PER HOUR $175.00 5125.0p $100.00 595.00 $6S.O0 TAL LABOR CASTS SS,250.00 $ZODO.DD S0A0 SL7W.OD S5m.00 59,470.01) DISTRIBUTION OF STAFFING 405% 2LS-A CAN 27.0% 10.8% ITDTAI (K 1101 $9.670A0 ASK pESCRIPTgM PROJECT MAHAGFR SENIOR PUBLIC INVOLVEMENT SPECIALIST GRAPHIC DESgNi INEe t)E /LIMPER PUBLIC INWLVEMtl:M SPECIALIST JVNIOR PUBLIC INVOLVEMENT SPECIALIST TOTAL LABOR HOURS 8C0S73 PC 1"- PROJECT R IMA66�IDR kAUhMMS MTM "[PARE FOR/AT7ENO TWO 2 PROGRESS MEETINGS 12 22 PROJECT ODORDINAnON, PREPARE INVOICES L PROGRESS RE PORTS 5 6 HOURS SUBTOTALS JL 0 0 0 0 1R NTNACT RATE PER HOUR S375.00 S375.00 S10O.DO $85.00 $65.00 OTAL LABOR COSTS $SAW-00 SOAO SOAO $0.00 $O.DO 53,150.00 DISTRIBUTION OF STAFFING 100.0% 0.0% OAK 0.0% 0.0% AL IK 164I �'�'m TOTAL LAN IV K TOTAL COSTS n PC FC lm PUBUCIMVOEVEMENTLOUTREACN 74 S9,470M FC 166 PROIECTMANAGEMENTLADMANISTRATION 1a 53150m A/LABOR mv6ES 92 212.6m.00 13 @ I UNIT I BR WRIS I a= 1 e eO—WF ATee mlk 320 S0.56 1 1 51M.m 500 5058 It 5290A0 —"letter PRm"Vples oelor (I 11r X 1111 Puh 100 SEOAO holdW wl. 11'X 1T !ITCH 50 >P AO u DIRER EXPENSES OTu COSTS FOR SUB CONSULTANT $116m. wSLLARV IOTHER DIRECT EXPENSES FOR SUB CONSULTANT f19.m rGIULND TOTAL FOR SUBCONSULTANT SE3.7N.20 PAGE 19 OF 19