CM-2021-283 - 10/29/2021ti
r
Page 1 of 3
Contract Quantity Adjustment/Change Order
aauwortour rr K.a•.
rev, 01/16
Department:
Project
Name: Lake Geor etown Chemical Feed System Date: 9/15/21
Change Order/Quantity
ZEBRA Adjustment No. 2
City Project
ID Number
Vendor
Justification
Utilities & Environmental Services
Associated Construction Partners, Ltd 215 W Bandera Rd, Suite 114_461, Boerne, Texas 78006210-698-8714
Company Name Address Phone No.
ro protect the interior of the CMU walls from staining, to adjust the chemical feed piping route due to the relocation of the chemical feed
wilding, and to relocate the fill station to maintain access to electrical equipment.
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contract Time (days for final completion):
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time (days for final completion):
Submitted for A.,pproval
Amount
% Change
$1,064,900.00
$23,713.55
$0.00
$23,713.551
A W
pal
$1,088,613.55
$0.00
0%
$43,375.92
4%
$43,375.92
4°
$1,131,989.47
$67,089.47
210
70
196
476
jgse h Jenkins,Senior Client Manager, Walker Partners 9/15/21
Printed Name, Title, Company Date
Contractor:
n/
11011VAOVA 9 FMW1
e
Printed Name, Title, `o pany
Date
City Project
Manager:
Juan Martinez, Engineering Associate
10/14/2021
Sig re
Printed Name, Title
Date
Mayor/City
,
��Az�w' �'
0 2�!
Manager
Signature
Printed Name, Title J
Date
RECEIVED OCT 18 2021
Page 2 of 3
Contract Quantity Adjustment/Change Order
R011NP ROdf 1[11I.1
HN,
Project Name: Lake Georgetown Chemical Feed System
Quan. Adj./Change Order No.:
Change Order Data
Item #
Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
Adjustment
(Days)
RFO #5 - CMU Wall Interior Coating
1
Skilled Labor
Daily
Rate
3
$394.62
$1,183.85
6
2
Epoxy Block Filler/Prime Coat
SF
475
$2.25
$1,068.75
3
Intermediate Coat (Fast -cure Epoxy)
SF
475
$0.95
$451.25
4
Topcoat, Gloss White
SF
475
$1.10
$522.50
5
Contractor's Overhead and Profit
I LS
1 1
1 $322.641
$322.64
RFQ #7 - Chemical Feed Piping
6
Skilled Labor
Daily
Rate
6
$394.62
$2,367.71
7
Supervision
Daily
Rate
6
$409.91
$2,459.43
8
General Labor
Daily
Rate
6
$323.75
$1,942.50
9
Pull Boxes, Pipe, and Fittings
LS
1
$9,228.00
$9,228.00
10
Asphalt
SF
1 14
$60.00
$840.00
11
Mini Esx 7400-9199
Daily
Rate
5
$327.00
$1,635.00
12
Rock Breaker for Mini
Daily
Rate
3
1 $241,67
$725.01
RFQ #8 - Fill Station
190
13
Skilled Labor
Daily
Rate
7
$394.62
$2,762.32
14
Supervision
Daily
Rate
7
$409.91
$2,869.34
15
General Labor
Daily
Rate
7
$323.75
$2,266.27
16
Pull Boxes, Pipe, and Fittings
LS
1
$9,791.36
$9,791.36
17
Mini Esx 7400-9199
Daily
Rate
5
$327.00
$1,635.00
18 lRock
Breaker for Mini
Daily
Rate
4.5
1 $290.00
$1,305.00
TOTALS:
$43,375.92
196
Page 3 of 3
Contract Quantity Adjustment/Change Order
nouNo rtatx n xwti
rev, VyA
Project Name: Lake Georgetown Chemical Feed System
Quan. Adj./Change Order No.:
Ouantity Adiustment Data
Contract
Time
Bid Item #
Item Description
Unit
Qty.
Unit Price
Amount
Adjustment
Labor, materials, equipment and services
for construction of a Chemical Feed
System at the Lake Georgetown Raw
Water Intake as depicted and noted in
the plans and specifications, including a
safety plan, mobilization and
demobilization, construction of a sodium
permanganate fill station and piping to
bulk chemical facilities, bulk chemical
structure and facilities, chemical
metering building and facilities, chemical
tubing and containment piping from
chemical metering building to splitter box
and three solenoid boxes at the raw
water intake pump station, electrical
equipment and controls, and related civil
and other items necessary for a
1
lcomplete, operational project.
LS
0
$1,064,900.00
$0.00
0
TOTALS:TOTALS:J
$0.0010
ROUND ROCK
as
City of Round Rock
Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Cha;,ge Order No. 2 with Associated
Construction Partners, Ltd. for the Lake Georgetown Chemical Feed System
Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 10/29/2021
Dept Director: Michael Thane, Utilities & Environmental Services Director
Cost: $43,375.92
Indexes: Self Financed Water Construction
Attachments: QA.CO no.2 ACP signed, Map
Department: Utilities & Environmental Services
Text of Legislative File CM-2021-283
The City owns a raw water pump station on Lake Georgetown, which supplies water to Round Rock's water
treatment plant. In the past several years, invasive zebra mussels have been detected in Lake Georgetown
and on the intake structure of the raw water pump station. Zebra mussels have a long history of attaching
in massive quantities to raw water intakes and pipelines, thereby damaging the infrastructure and
restricting flow to the facility.
The purpose of this project is to construct a sodium permanganate chemical feed system at Round Rock's
Lake Georgetown raw water pump station. The sodium permanganate system assists with taste and odor
issues, provides manganese control, and assists with zebra mussel prevention in the raw water pipelines.
The project consists of a chemical fill station, a bulk chemical storage tank, a chemical building, and three
chemical feed lines down to the raw water intake.
A field adjustment required an internal coating to protect the building from corrosion, relocation of the
chemical fill station, and the addition of a solenoid box for the chemical lines. A total of 196 days is being
added due to the lead time of materials and construction of solenoid boxes. This additional work outlined
in Quantity Adjustment/Change Order(QA/CO) No. 2 will cost $43,375.92. The City awarded Associated
Construction Partners, LTD with the contract in June 2020 for $1,064,900. QA/CO No. 1 was $23,713.55
and brought the total contract to $1,088,613,55, With the addition of QA/CO No.'s 1 and 2, the new total
contract price is $1,131,989.47.
City of Round Rock Page 1 of 2
Agenda Item Summary Continued (CM-2021-283) _
Cost: $43,375.92
Source of Funds: Self -Financed Water Construction
City of Round Rock Page 2 of 2