CM-2021-283 - 10/29/2021ti r Page 1 of 3 Contract Quantity Adjustment/Change Order aauwortour rr K.a•. rev, 01/16 Department: Project Name: Lake Geor etown Chemical Feed System Date: 9/15/21 Change Order/Quantity ZEBRA Adjustment No. 2 City Project ID Number Vendor Justification Utilities & Environmental Services Associated Construction Partners, Ltd 215 W Bandera Rd, Suite 114_461, Boerne, Texas 78006210-698-8714 Company Name Address Phone No. ro protect the interior of the CMU walls from staining, to adjust the chemical feed piping route due to the relocation of the chemical feed wilding, and to relocate the fill station to maintain access to electrical equipment. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time (days for final completion): Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time (days for final completion): Submitted for A.,pproval Amount % Change $1,064,900.00 $23,713.55 $0.00 $23,713.551 A W pal $1,088,613.55 $0.00 0% $43,375.92 4% $43,375.92 4° $1,131,989.47 $67,089.47 210 70 196 476 jgse h Jenkins,Senior Client Manager, Walker Partners 9/15/21 Printed Name, Title, Company Date Contractor: n/ 11011VAOVA 9 FMW1 e Printed Name, Title, `o pany Date City Project Manager: Juan Martinez, Engineering Associate 10/14/2021 Sig re Printed Name, Title Date Mayor/City , ��Az�w' �' 0 2�! Manager Signature Printed Name, Title J Date RECEIVED OCT 18 2021 Page 2 of 3 Contract Quantity Adjustment/Change Order R011NP ROdf 1[11I.1 HN, Project Name: Lake Georgetown Chemical Feed System Quan. Adj./Change Order No.: Change Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) RFO #5 - CMU Wall Interior Coating 1 Skilled Labor Daily Rate 3 $394.62 $1,183.85 6 2 Epoxy Block Filler/Prime Coat SF 475 $2.25 $1,068.75 3 Intermediate Coat (Fast -cure Epoxy) SF 475 $0.95 $451.25 4 Topcoat, Gloss White SF 475 $1.10 $522.50 5 Contractor's Overhead and Profit I LS 1 1 1 $322.641 $322.64 RFQ #7 - Chemical Feed Piping 6 Skilled Labor Daily Rate 6 $394.62 $2,367.71 7 Supervision Daily Rate 6 $409.91 $2,459.43 8 General Labor Daily Rate 6 $323.75 $1,942.50 9 Pull Boxes, Pipe, and Fittings LS 1 $9,228.00 $9,228.00 10 Asphalt SF 1 14 $60.00 $840.00 11 Mini Esx 7400-9199 Daily Rate 5 $327.00 $1,635.00 12 Rock Breaker for Mini Daily Rate 3 1 $241,67 $725.01 RFQ #8 - Fill Station 190 13 Skilled Labor Daily Rate 7 $394.62 $2,762.32 14 Supervision Daily Rate 7 $409.91 $2,869.34 15 General Labor Daily Rate 7 $323.75 $2,266.27 16 Pull Boxes, Pipe, and Fittings LS 1 $9,791.36 $9,791.36 17 Mini Esx 7400-9199 Daily Rate 5 $327.00 $1,635.00 18 lRock Breaker for Mini Daily Rate 4.5 1 $290.00 $1,305.00 TOTALS: $43,375.92 196 Page 3 of 3 Contract Quantity Adjustment/Change Order nouNo rtatx n xwti rev, VyA Project Name: Lake Georgetown Chemical Feed System Quan. Adj./Change Order No.: Ouantity Adiustment Data Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment Labor, materials, equipment and services for construction of a Chemical Feed System at the Lake Georgetown Raw Water Intake as depicted and noted in the plans and specifications, including a safety plan, mobilization and demobilization, construction of a sodium permanganate fill station and piping to bulk chemical facilities, bulk chemical structure and facilities, chemical metering building and facilities, chemical tubing and containment piping from chemical metering building to splitter box and three solenoid boxes at the raw water intake pump station, electrical equipment and controls, and related civil and other items necessary for a 1 lcomplete, operational project. LS 0 $1,064,900.00 $0.00 0 TOTALS:TOTALS:J $0.0010 ROUND ROCK as City of Round Rock Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Cha;,ge Order No. 2 with Associated Construction Partners, Ltd. for the Lake Georgetown Chemical Feed System Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/29/2021 Dept Director: Michael Thane, Utilities & Environmental Services Director Cost: $43,375.92 Indexes: Self Financed Water Construction Attachments: QA.CO no.2 ACP signed, Map Department: Utilities & Environmental Services Text of Legislative File CM-2021-283 The City owns a raw water pump station on Lake Georgetown, which supplies water to Round Rock's water treatment plant. In the past several years, invasive zebra mussels have been detected in Lake Georgetown and on the intake structure of the raw water pump station. Zebra mussels have a long history of attaching in massive quantities to raw water intakes and pipelines, thereby damaging the infrastructure and restricting flow to the facility. The purpose of this project is to construct a sodium permanganate chemical feed system at Round Rock's Lake Georgetown raw water pump station. The sodium permanganate system assists with taste and odor issues, provides manganese control, and assists with zebra mussel prevention in the raw water pipelines. The project consists of a chemical fill station, a bulk chemical storage tank, a chemical building, and three chemical feed lines down to the raw water intake. A field adjustment required an internal coating to protect the building from corrosion, relocation of the chemical fill station, and the addition of a solenoid box for the chemical lines. A total of 196 days is being added due to the lead time of materials and construction of solenoid boxes. This additional work outlined in Quantity Adjustment/Change Order(QA/CO) No. 2 will cost $43,375.92. The City awarded Associated Construction Partners, LTD with the contract in June 2020 for $1,064,900. QA/CO No. 1 was $23,713.55 and brought the total contract to $1,088,613,55, With the addition of QA/CO No.'s 1 and 2, the new total contract price is $1,131,989.47. City of Round Rock Page 1 of 2 Agenda Item Summary Continued (CM-2021-283) _ Cost: $43,375.92 Source of Funds: Self -Financed Water Construction City of Round Rock Page 2 of 2 �1 m