CM-2021-284 - 10/29/2021Pap I of 3
IPO— Contract Quantity Adjustment/Change Order
m, OUl6
Department: UES
Project
Name: University Water Main Extension Date: 10/20/21
City Project Change Order/Quantity
ID Number UNIVW Adjustment No. 1
Vendor Atlas Construction Corp. 316 Sunset Drive - Granite Shoals, TX 78654 (830) 652-3536
Company Name Address Phone No.
Justification
Quantity Adjustment/Change Order No. i is needed for final quantity adjustments.
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus
Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Orig nal Contract Time:
rime Adjustment by previous Quan. Adj./Change Order:
rime Adjustment by this Quan. Adj./Change Order:
New Contract Time:
Amount
% Change
$632,017.48
$0'0
$2,9131.130
I
9131.130
$634,9D9,281.
yW=A
$0 00
0%
$4,999.23
1%
999.23
9 998.51
1%
$7,981.03
0
0
PmWed Of, Eddie Zapata. Senior Prrlect Manager, C. of Round Rock 10/20121
Printed Name, Title, Company Date
Contractor: AA Erlca Sancht-4 Atlas Construction Corp
Printed Name, Title, Company Date
City Project
Manager: Eddie Zapata, Senior Prcdect Manager
Printed Name, Title Date
Mayor/City WizI(II-�
Mana erLaurie Had Cfty Manager
Printed Name, Title Date
�,M - zozl- 2W
Page 2of3
Contract Quantity Adjustment/Change Order
Project Name: University Water Main Extension
Quan. Adj./Change Order No.
Chance Order Data
Nr
.
M-MM
Contract
Time
Adjustment
.
--
1 11
_--
1 11
Page 3 of 3
Contract Quantity Adjustment/Change Order
Project Name: University Water Main Extension
Quan. Adj./Change Order No.
uantity Adiustment Data
Contract
rime
�w ment
��
a , -
A
0
City of Round Rock
ROB UNOROCK Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 1 with Atlas
Construction, Corp. for the University Boulevard Water Main Extension Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 10/29/2021
Dept Director: Michael Thane, Utilities & Environmental Services Director
Cost: $7,981.03
Indexes: Self -Financed Water Construction
Attachments: Map, QA.CO no.1-Atlas signed
Department: Utilities & Environmental Services
Text of Legislative File CM-2021-284
This item is for the construction services that were required for the University Waterline Extension project.
The project consisted of approximately 3,880 linear feet of 16-inch waterline, 72 linear feet of 6-inch
waterline, 30 linear feet of 30-inch steel encasement by jack and bore, 160 linear feet of 30-inch steel
encasement by open cut, 8-inch meter vault, backflow vault, and appurtenances. The University 36-inch
Waterline was completed in 2015 and was constructed along University Boulevard from AW Grimes
Boulevard east to the future intersection of the Kenny Fort Arterial A roadway. This project extended a
16-inch waterline from the termination of the waterline at Arterial A roadway location approximately
4,000 feet east to County Road (CR) 110.
As part of a wholesale customer agreement with Jonah Special Utility District, the waterline will serve as an
interconnect to the Jonah water system. Based on the agreement between the City and Jonah, the City will
obtain the water Certificate of Convenience and Necessity (CCN) for the property west of CR 110. This
waterline extension along University Boulevard will assist with providing water service to these future City
of Round Rock utility customers.
On March 3, 2021, the Utilities and Environmental Services Department received 12 bids for the University
Waterline Extension project. Atlas Construction, Corp. was the low bid with a total bid of $632,017.48.
Change Order/Quantity Adjustment (CO/QA) No. 1 includes adding bollards to protect water valve covers
and bid item adjustments. CO/QA No. 1 is in the amount of $7,981.03 which increased the total contract
City of Round Rock Page 1 of 2
Agenda hem Summary Condgued (CM-2021-284)
price to $639,998.51.
Cost: $7,981.03
Source of Funds: Self -Financed Water Construction
City of Round Rock Page 2 of 2