Loading...
CM-2021-285 - 10/29/2021i Per 1 of 3 �. cress Department: Project Name: City Project ID Number Vendor ]union Contract Quwaft Adjwdwwnt/Chanpa Order Utilities and Environmental Services Chisholm VaW Watery Wastewater, and Storm Drain Improvernerus Area 3 Date. 10/ 1921 Change Order/Quantlty CVD+PS Adjustment No. 1 Ra�raI Vista, Inc. 350 Co Rd. 260, tberty Hip, Tx, 7W2 (512)515_-6824 Company Name Address Phone No. There were unexpected oonflkis with other utility lines that required adjustments to avoid them. SUMMARY Orly ul Ombad Rice: PreNaes Quantity Adjusbnert(s): "Qom► nt Total QuarM AdXdwnerd(s): Total Contract Rios wlih Quantity Ad)jAnre it(s): Pmvioas Charge ordw(s): This Change OW w. Total Change Order(s) To Date: Acted CmIn d R'109 [Orlgft Gonhatt Price Pho Quantity A*fift9t(s) Plus Charge Order(s)I: Meience beb veer OrWal and Adjuseed Cw&ad Prices: Origin Contract Tkne: Time A*nuv d by p wkK s Quen. MWChirge Order: TbM Adjustnwt by this Quart. Adj g:h rge Order. 300 Amount %Cbere4a CPA $0.00 0% $0.00 i1l6 42,034 702.90 $47,205.90 New Contract Tkne: 300 Prepared S+: Printed Name, Title, Company Date 11 .OM-4f S weture Printed Name, Title, Company �W - 2-0Z(r 2 T 5 Page 2 of 3 Contract Quantity Adjustment/Change Order I.w orrti Amod Now. Chisholm Valley Water, Wastewater, and Storm Drain Improvements Area 3 Qtw. Adj jChange Order No.: Chaeo a Order Data 1 1'1 71 1'1 1 1'1 _- EMU, lu Ili 71 1'1 Page 3 of 3 It— Contract Quantity Adjusdnent/Chwgis Order moult Projed Name: Chisholm Valley WaW, Wash waW, and Storm Drain Improvements Area 3 Quan. Adl4Chmr p Order No.: Oiratgltor Adfustm mt Data •--�=-���•!��'-'---��'�7-.7r.�_. '. �i�7--�q������ —---,��--law_—�� LW17i::--• :�r--aIC1YiY:�:WI� ��� OUT,MhKl-1 � .�_-.........�_� 1.1 �T� iy: PIPE 8", CLASS ,D. (ALL DEPTHS), I IMF 1 "JIM4TAT 0 r 9 0 Jrf T.LL • r • 0 } • WIN :•r 11 GiglCt 11 01 r � • r � r • , 1 1 Yf 1�1 �- •1 rl 7i i 1 71 I-1 71 1 1 71 1"1 ! ti 5 MAYS ST IL 0 # .fiup t a r!S 4 !+ + firm' �JL . �• t ' . ► A f r 'Ali City of Round Rock 1PROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Royal Vista, Inc. for the Chisholm Valley Water, Wastewater and Storm Drain Improvements Area 3 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/29/2021 Dept Director: Michael Thane, Utilities & Environmental Services Director Cost: $47,205.90 Indexes: 2014 Drainage Revenue Bonds; Self -Financed Water Construction Attachments: QA.CO no.1-CV 3, Map Department: Utilities & Environmental Services Text of Legislative File CM-2021-285 The Chisholm Valley Water, Wastewater, and Storm Drain Improvements Area 3 project involves replacing aging water and wastewater infrastructure, and placing new drainage infrastructure to help alleviate the overwhelmed existing systems. This Quantity Adjustment/Change Order(QA/C0) No. 1 includes the cost of additional waterline materials, the replacement of existing storm sewer inlets, changing a proposed section of storm sewer from 30-inch to 18-inch pipe, and additional curb and gutter repair. During construction, electric and telecom utility lines were found to be in conflict with the new proposed systems. To avoid these conflicts, systems were either re-routed to go around them or downsized to go in between the lines. These changes required additional waterline materials and downsizing sections of the storm sewer line. In addition, upon a closer inspection of the existing inlets, many of them were found to be damaged and in need of replacement. QA/CO No. 1 is for $47,205.90. This includes the cost of labor, additional materials, and equipment for the work. The total contract amount will be adjusted to $2,034,702.90. Cost: $47,205.90 Source of Funds. 2014 Drainage Revenue Bonds and Self -Finance Water Construction City of Round Rock Page I