CM-2021-292 - 11/5/2021Page l of 3 -r ... 0-:1- .. rev, 01! 16 Department: Project Name: City Project ID Number Vendor ]ustification Contract Quantity Adjustment/Change Order Utilities and Environmental Services Communications and Water Treatment Plant Control System Improvements Date: 10/14/21 Change Order/Quantity SCADA Adjustment No. 2 Control Panels USA Inc. 16310 Bratton Lane, Suite 100, Austin, TX 78728 512-863-3224 Company Name Address Phone No. )uring stillation of the new wireless monitors it was determined that there was celular issues through the plant. It increase the range and untionality of the new wireless monitors wife rage addaptors were needed. Other minor field adjustments were required to complete I/O :onfiguration. The City also received a dedection for spare parts provided by the City. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Pius Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Juan Martinez Amount % Change $2,495,359.00 $0.00 $2,495,359.00� $89,925.00 4% $29,956.00 1% $119,881.00 5% $2,615, 240.00 $119,881.00 380 70 450 10/20/2021 (/ Signature C/ Printed Name, Title, Company Date Contractor: I + JApprovals ,(, fn �✓' Se 1 Q r .� CO 1 ro P ()( d e 5 "JfT -1,1 c / D Signature Printed Name, Title, Company Date City Project Manager: Juan Martinez 10/20/2021 Sign re Printed Name, Title Date Mayor/City a , , 011(d r� Manager """" Y'^-' (� f L C / _ r Signature Printed Name, Title Date �i 2vz r-"z�7 Z Page 2 of 3 Contract Quantity Adjustment/Change Order LJND ROM rev, 01116 Project Name: Communications and Water Treatment Plant Control System Improvements Quan. Adj./Change Order No.: Chanae Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da s 1 Deduct for spare parts used LS 1 $13,394.00 -$13,394.00 0 2 Additional Inputs for Solids Building and Chlorine Building LS 1 $9,676.00 $9,676.00 0 3 Wi i Addition to improve wireless monitoring LS 1 $32,935.00 $32,935.00 30 4 Celualr Antenna installation LS 1 $2,259.00 $2,259.00 0 5 Stainless Steal Deduct LS -1 $1,520.00 -$1,520.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Control Panels USA Inc. CHANGE ORDER REQUEST 20-2621-02 DATE: October 11, 2021 ATTN: Patrick Moseley COMPANY NAME: Alan Plummer Associates, Inc. PROJECT: City of Round Rock Communications and Water Treatment Plant Control System Improvements DESCRIPTION OF CHANGE: Spare Parts, Additional F'O, WIFI Access Points and Antennas - PCM-02 Patrick, Per your request on PCM-02 for the above mentioned project, CP USA proposes to provide the items as requested in PCM-02 summarized as follows: Item 1 This is to provide a Deduct to supply the difference in spare parts that was required per the specifications from those that are now being recommended per the attached listed included with PCM-02. Item 2 • Add additional I:'O for Solids Building PLC. CP USA will furnish and install the following: o One new 8-Point Discrete Output card, Modicon BMX DRA 0805 o Qry 8 interposing relays o Necessary terminal blocks to wire out the PLC Output card to terminals in the panel o Miscellaneous wire, wire labels, etc. o Field services to install all the above, as well to connect and test the Sludge Blowdown Valves that are to be connected to the new card a Programming services to add the Sludge Blowdown Valves to the programming, as well as all associated field testing o Updated CAD drawings to show new card and new valves Add additional I."O for Chlorine Building PLC. CP USA will furnish and install the following: o One new 8-Point Analog Input card, Modicon BMX AMI 0810 o Qty 8 surge suppressors o Necessary terminal blocks and fuses to wire out the PLC Output card to terminals in the panel o Miscellaneous wire, wire labels, etc. o Field services to install all the above, as well to connect and test the Weigh Scales, Room Temperature, Effluent pH, and Effluent Temperature signals that are to be connected to the new card o Programming services to add the forementioned signals to the programming, as well as all associated field testing o Updated CAD drawings to show new card and new signals Item 3 This includes the cost to furnish and install the below listed WIFI equipment as identified in PCM-02. This equipment is to allow better WIFI coverage throughout the plant. 16310 Bratton Lane' Smle 100 ' Ausbn Texas 78728 ' Phone- (512) 863-3224 ' www.omtralpanetsusa.net Industrial WIFI Access Point, 120VAC & 24VDC, with antenna, Hirschmann BAT- 5 each Gigabit, RJ45 RUSWW9AKC99B07TIS999HZ Omni Directional Antennas, Dual Frequency, 2.4 & 5.0 GHz, 3.5/5.5dBi, includes qty 3 1 meter Hirschmann BAT-ANT-N-MiMoDB-5N-1P65 8 each N-male to N-male cables, qty 3 pigtail with R-SMA Male to N- Female Cable, N-male toN-Female, 15m Hirschmann BAT-CBL-15N 24 each Surge Protector, 5KA Hirschmann BAT-ANT-Protetor M-F 12 each Included in this item is all associated labor to mount the antennas, core drill walls, run and connect coaxial and ethernet cables, mount and wire surge protectors where called for in PCM-02, mounting and wiring of the WIFI access points in the various panels, updating all CAD drawings, etc. Please note that CP USA has NOT included any time to setup or program the WIFI access points, as it is assumed this will be done by Plummer and Associates. Item 4 This includes the cost to furnish and install the previously agreed Cellular Antenna and associated coax cables and surge protectors from the FEP Panel to the outside wall of the Phase 3 Filter building. This was to provide better reception for the remote site access. This work was previously performed and agreed to be included in this change order request. Item 5 This includes a deduct to NOT provide new SS doors for the 4 existing Filter Panels located in Phase V Filter gallery. The pandemic has created an incredibly long lead time and increased cost for these custom doors. As previously mentioned in one of the bi-weekly meetings, CP USA proposes a deduct to NOT provide the custom SS doors, but instead install SS cover plates over the existing holes that will be left when the existing Fans and Filters are removed. Summary CP USA proposes a Lump Sum Contract in the amount of $29,956.00 to provide the equipment and services as identified above. This amount both the cost of all new equipment and work as well as the two mentioned deducts in Items I and 5. We also request adding an additional 30 days to the contract to perform the above requested services, and to account for slow equipment deliveries that have been occurring due to the covid pandemic. Keep in mind lead times are constantly changing; should by the time this Change Order becomes approved, the lead times on equipment do not work with the project schedule in affect at the time of approval, CP USA may ask for additional days at that time. If you have any questions or concerns don't hesitate to contact me. Regards, Martin W. Salyer, PE President msalverirr+controlpanelsusa.net AUTHORIZATION TO PROCEED: By signing below I accept the change order as described above: 10/20/2021 Pre ed Name Date Juan Martinez Authorized Client Signature 16310 Bration Lane' Suite 100 ' Aus in, Texas 78728 ' Phone: (512) 863.3224 ' www controlpanelsusa.net City of Round Rock IROUND ROCK Xp.E Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Control Panels USA Inc. for the Communications and Water Treatment Plant Control System Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/5/2021 Dept Director: Michael Thane, Utilities & Environmental Services Director COSt: $29,956.00 Indexes: Self Financed Water Construction Attachments: QA-CO No. 2—Partial Signed Department: Utilities & Environmental Services Text of Legislative File CM-2021-292 The City of Round Rock's Communications and Water Plant Control System Improvements project involves updating communication infrastructure in Round Rock's water treatment plant (WTP), reuse water distribution system, water distribution system and wastewater collection system. Due to the rapid advancement of technology, the electronic control system infrastructure associated with Round Rock's WTP has either become outdated, reached its design life, or is no longer supported by the manufacturer. This project will reorganize, consolidate controls, upgrade the hardware, and network components to current industry standards. Updating the WTP's hardware also provides the opportunity to switch the WTP's operating platform to match the operating platform currently being installed at the Brushy Creek East Regional Wastewater Treatment Plant. Updating the hardware and using the same operating platform and programming architecture across the entire water and wastewater system provides for operational efficiency and a more maintainable system. This project will update the current field communication network to a modern cellular network. Doing this will allow for increased reliability in the system, the ability to transmit more information and increased ease in adding additional monitoring to the system. City of Round Rock Page I of 2 Agenda Item Summary Continued (CM-2021-292) Change Order No. 2 will deduct stainless steel doors that were required per the contract and spare parts that were provided by the City of Round Rock. This change order also accounts for additional inputs for the Solids and Chlorine Buildings at the water treatment plant. The inputs work was not contemplated in the original contract and will require new discrete output cards, interposing relays, terminal blocks, and other miscellaneous wires. During the installation of the new wireless monitoring system, it was determined that the walls were too thick to allow the tablets to function properly. To improve the tablets functionality, WIN expansion devices were added. The cost for this additional WIFI coverage is also contemplated in Change Order No. 2. On October 8, 2020, the City of Round Rock entered an agreement with Control Panels USA Inc. for $2,495,359.On May 13, 2021, additional site monitoring systems were approved as Change Order No. 1 which added an additional $89,925 to the contract. With the addition of Change Order No. 2 for $29,956 the new contract total will be $2,615,240. Cost: $29, 956 Source of Funds: Self -Financed Water Construction City of Round Rock Page 2 of 2