CM-2021-300 - 11/12/2021STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HALFF ASSOCIATES INC. ("Engineer") ADDRESS: 9500 Amberglen Boulevard, Building F. Suite 125, Austin, TX 78729 PROJECT: Wyoming Springs Segment 1 This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Halff Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 22nd day of August, 2019 for the Wyoming Springs Segment I Project in the amount of $546,776.54; and WHEREAS, the City and Engineer executed Supplemental Contract No. I on January 14, 2021 to amend the scope of services and to increase the compensation by $1,641,846.00 to a total of $2,188,622.54; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $42,481.75 to a total of $2,231,104.29; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. Article 2, En ineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Supplemental Contract Re%-.06116 0199 1931.4863-2003-3025 64275 (?Al - 202 (- 2(7r,, Article 4, Compensation and Exhibit D,_ Fee Schedule shall be amended by increasing by $42,481.75 the lump sum amount payable under the Contract for a total of $2,231,104.29, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract 0199 1931 . 4863-2003-3025 Rc%-.06! 16 84275 HALFF ASSOCIATES, INC. By: — PlG Mq Date Supplemental Contract Rev,06/16 0199.1931,4963-2003-3025 84275 CITY ROUND ROCK APP ED AS TO FORM: By: ci Laurie H dley, City Manager Stephan ,. Sheets, City Attorney I& Date Supplemental Contract Re,,-.06f 16 0199 1931,4863-2003-3025 842?5 ADDENDUM TO EXHIBIT A City Services WYOMING SPRINGS SEGMENT 1 FINAL DESIGN AND PERMITTING FROM CREEK BEND BLVD/ BRIGHTWATER BLVD TO SAM BASS ROAD The City will furnish to the Engineer the following information and/or perform the following tasks: • Provide the Engineer with access to the right-of-way for obtaining SUE field data. • Approve the photometric analysist of street lighting layout before Engineer proceeds with electrical design. • Schedule and conduct a Public Hearing (can be an agenda item on a regular council meeting) with documents to be provided by the Engineer • Assist the Engineer, as needed, in obtaining data and information from the State, County, and/or other franchise utility companies. • Provide timely review of deliverables from the Engineer. • Coordinate and communicate project items and progress to other city departments, as appropriate. Exhibit A Wyoming Springs Segment 1 - - Final Design and Permitting SC#2 Page 1 of 1 ADDENDUM TO EXHIBIT B Engineering Services WYOMING SPRINGS SEGMENT 1 FINAL DESIGN AND PERMITTING FROM CREEK BEND BLVD/ BRIGHTWATER BLVD TO SAM BASS ROAD For the scope of services for this contract, the Engineer shall provide professional services for Final Design and Permitting. Engineer will provide services described in further detail as follows: Task 6 - Additional Subsurface Utility Engineering (SUE) and Survey 6.1 Additional QL-B SUE along Sam Bass Road • The original SUE limits were based on the schematic, which only proposed work on the south side of Sam Bass Road. The final version of the schematic and plans requires work on the north side of the road, so additional SUE work is needed to analyze and clear any utility conflicts. 6.2 Additional QL-A SUE test hole on city owned 24" wastewater line • The north abutment of Dry Fork Creek bridge spans the existing 24" WW line so achieving clearance from proposed drilled shafts to the WW line is vital to the successful design and construction of the bridge. The needed test hole location is on a steep rock slope and inaccessible for the standard Vacuum excavation truck, so subconsultant Badger Daylighting will excavate the location, the Engineer will obtain the needed x, y, z coordinates, and then Badger will backfill the excavation back to the original ground line. Engineer will then ensure sufficient design clearance to the proposed bridge foundation. 6.3 Additional survey parcel preparation The engineer will prepare one additional parcel with surveyed metes and bounds (with sketch) of a right-of-way tract to be transferred from Williamson County to the city. The parcel will be prepared and signed by a Registered Professional Land Surveyor in the State of Texas. Task 7 - Electrical Engineering 7.1 Electrical Design for Street Lights - • The Engineer will prepare electrical design for city owned street lights, including voltage calculations, conductor sizing, and coordination with Oncor for electrical services. Exhibit B Wyoming Springs Segment 1 Final Design and Permitting SC#2 Page 1 of 2 7.2 Conduit Plan - (for future use) • Engineer will design two (2) four inch (4") spare conduits for the entire length of project with ground boxes every 500 feet (in shared trench with streetlight conduits where feasible). Task 8- Permitting 8.1 Public Hearing for Parkland Acquisition - • Deed research during parcel preparation has determined that land owned by Fern Bluff M.U.D was designated as parkland. Chapter 26 of the Texas Parks and Wildlife Codes governs the use or taking of any public park land and requires public notice and hearing prior to such taking. Engineer will provide the required alternatives analysis and support a public hearing in accordance with the Code, including notifications to the landowner (M.U.D.). 8.2 TCEQ Organized Sewage Collection System (SCS) Plan and Permit- SCS plans are required for new length of sewage system within the Edwards Aquifer. Since no new length of wastewater sewer was proposed, no SCS was included in the design scope within SC#1. However, there are manhole adjustments required and the TCEQ reviewer (for the WPAP, which was scoped and is being prepared), is requiring (out of an abundance of caution) that an SCS plan should be prepared and submitted. So, the Engineer will prepare SCS plan and submit to TCEQ, along with the $800 permit fee. EXHIBIT B OVERALL SUMMARY OF DELIVERABLES: • Quality Level A - SUE Test hole of 24" Wastewater Line • Quality Level B - SUE of buried utilities on north side of Sam Bass Road • SCS application submittal with fee and obtain approval from TCEQ • Chapter 26 and Public Hearing documents • Electrical Design PS&E for streetlights and spare 4" conduit layouts Services Excluded from this ScoQe of Services: • Construction Phase Services • Property appraisals negotiations or acquisitions The Engineer will perform the services to be provided under this agreement out of Engineer's office(s) as listed below: Office Location Halff Associates, Inc. 9500 Amberglen Blvd Building F, Suite 125 Austin, TX 78729 Sub -Consultants: Badger Daylighting Corp. E=xhihil B Wyoming Springs Segment 1 - Final Design and Permitting SC#2 Page 2 of 2 ADDENDUM TO EXHIBIT C Work Schedule Task 6 (SUE) - Engineer to complete field work within 30 days and incorporate into the 90% design plans Task 7 (Electrical) - Engineer to complete electrical engineering and incorporate into the 90% design plans Task 8 (Permitting) - Engineer to complete SGS and submit to TCEQ with the 90% design plans Exhibit C Wyoming Springs Segment 1 - - Final Design and Permitting SC#2 ADDENDUM TO EXHIBIT D Fee Schedule Fees to be billed on a lump sum basis monthly as a percentage of work completed to date. TASK 6 - Additional SUE and survey TASK 7 - Electrical Engineering TASK 8 - Permitting TOTAL FEE Exhibit D Wyoming Springs Segment 1 - Final Design and Permitting SC#2 $ 15, 749.75 $ 16,640.00 $ 10,092.00 $ 42,481.75 8lINIIIIIII H City of Round Rock ROUNDROCK TEXA5 Agenda Item Summary Agenda Number: Title: Considering executing Supplemental Contract No. 2 with Halff Associates, Inc. for the Wyoming Springs Segment 1 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/12/2021 Dept Director: Gary Hudder, Transportation Director Cost: $42,481.75 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: SC No. 2, wyoming springs Department: Transportation Text of Legislative File CM-2021-300 Consider a resolution authorizing the City Manager to execute Supplemental Agreement #2 with Halff, Associates, Inc. to provide additional services required for the project. These services include: 1. Additional SUE and Surveying to accommodate work in additional areas for the project, to locate a city owned 24" wastewater line to ensure the new structure will not be in conflict, and additional survey parcel preparation for ROW tracts to be transferred from Williamson County. 2. Electrical design for City owned street lights not originally included in the design scope. 3. Public Hearing for Parkland Acquisition from the Fern Bluff MUD. 4. TCEQ Organized Sewage Collection System (SCS) Plan and Permit for the new length of sewage system within the Edward's Aquifer. This includes preparation of the permit and the $800 permit fee. All these items are required to complete the 100% design of the project. The additional fee for this work is $42,481.75 which brings the total contract price to$2,231,104.29 when added to the previous contract price of $2,188,622.54. Cost: $42,481.75 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock Page 1.