Loading...
Contract - Kasberg Patric & Associates - 11/18/2021 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: KASBERG,PATRICK&ASSOCIATES,LP ("Engineer") ADDRESS: 800 South Austin Avenue,Georgetown,TX 78626 PROJECT: Cycle 3—Basin 4 and 5—Wastewater Main Rehabilitation This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the"City"and Kasberg, Patrick & Associates, LP, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract', on the 12th day of November, 2020 for the Cycle 3 — Basin 4 and 5 — Wastewater Main Rehabilitation Project in the amount of$51,630.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$172,270.00 to a total of$223,900.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article I, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. 11. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. III. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $172,270.00 the maximum amount payable under the Contract for a total of $223,900.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.06/16 0199.202037;4858-9099-2641 84275 1 IR-2011-3t1 KASBERG,PATRICK& ASSOCIATES,LP By: /v- Date Supplemental Contract Rev.06/16 0199.202037;4858-9099-2641 84275 2 CITY OF 7ND ROCK :A4.rrKvAS TO ORM: By: Craig Mo gan, ayor Sheets,City Attorney Date Supplemental Contract Rev.06/16 0199.202037,4858-9099-2641 84275 3 ADDENDUM TO EXHIBIT A City Services The City will provide the following information and other assistance to the Engineer (Kasberg, Patrick&Associates,LP)that the City deems appropriate and necessary: 1. Any readily available pertinent existing information relating to the services to be performed by the Engineer;the City will provide one copy of such information in a format chosen by the City. 2. Clear direction and/or response to questions or requests made by the Engineer in the course of the Engineer's performance of services. 3. Timely review of deliverables that have been properly completed and submitted by the Engineer; and timely provisions of comments, if any, to the Engineer resulting from said reviews. 4. Arrange for the Engineer and their Sub-Consultants to access public and private property as required to perform services under this contract. 5. Furnish permits and approvals for all governmental authorities with jurisdictions over the project and pay all fees associated with the permits and approvals. 6. Secure easements as required for design and construction of the project. 7. Provide Word or PDF files containing current City of Round Rock front end and specification documents for incorporation into Contract Documents. ADDENDUM TO EXHIBIT B Engineering Services 1. PROJECT DESCRIPTION Design of rehabilitation and replacement of wastewater lines ranging from 6" to 36" in diameter in Basins 4& 5. 2. SCOPE OF WORK The scope of Work for this project has been divided into the following tasks: • Task 1: Final Design • Task 2: Bidding • Task 3: Construction Administration 2.1 Work Breakdown Structure Tasks and Description 2.1.1 Task 1: Final Design Task Description: A. The ENGINEER will incorporate the decisions and concepts from the schematic design meetings into the final design. B. The ENGINEER will develop plan and profile drawings for the proposed improvements and include existing utilities to show any conflict. If conflict does occur,the ENGINEER will design the project to avoid or relocate any conflicts. C. The ENGINEER will design wastewater rehabilitation and construction methods. D. The ENGINEER will incorporate the construction method for wastewater improvements into the final design. Plan sheets will be created for these sections and include details. E. The ENGINEER will prepare final details for the project and incorporate these into the final design sheets. F. The ENGINEER will prepare bid set documents that require the Contractor to provide, submit, and receive applicable SWPPP permits, implement erosion control measures and submit applicable Notice of Intent with the TCEQ. G. The ENGINEER will prepare a final bid schedule and any special technical specifications for the project. These documents will be emailed to City Staff for review and comment. All comments will be incorporated into the documents for inclusion into the Contract Documents to be prepared by the City. H. The ENGINEER will deliver review sets of the design sheet sets at the 60% and 90% stages. Three(3)sets of each stage will be delivered to the City for review. All comments will be incorporated in the design sets. I. The ENGINEER will prepare final design bidding documents to include plans, special technical specifications, and bid schedule. The plan sheets will be on l lxl7 sheets. Bid items will require the Contractor to include traffic control plans signed by a Texas registered Professional Engineer for work within roadways. J. The ENGINEER will prepare and submit a Sewage Collection System submittal to the TCEQ, where applicable for extending wastewater system. If a SCS plan is deemed required, the ENGINEER and any special services, such as environmental and Page 13-1 of B-3 geotechnical,required to complete the plan and permit will be compensated at a negotiated fee under a supplemental agreement. K. Rehabilitation work for this project involves existing public utility wastewater system lines and structures. Researching and obtaining additional easements is not included in the scope of this task order. 2.1.2 Task 2: Bidding Task Description: A. The ENGINEER will prepare for the Pre-Bid Conference, develop an agenda and sign in sheet, conduct the Pre-Bid Conference,take notes at the conference, prepare minutes and incorporate into the addenda. B. The ENGINEER will receive all questions from bidders, log the questions and answer in the form of an addenda. C. The ENGINEER will research the low bidder(s) qualifications and recommend award to the City of Round Rock. 2.1.3 Task 3: Construction Administration Task Description: A. The ENGINEER will incorporate plan changes/modifications that were developed thru the bidding process and prepare and distribute a Released For Construction Plan Sets to the City and Contractor. B. The ENGINEER will schedule and conduct the Pre-Construction Conference. Minutes from the conference will be taken and distributed. C. The ENGINEER will receive and review all submittals and material samples for the project. Documentation for the submittals will be generated and distributed to the City of Round Rock and the contractor. D. The ENGINEER will hold regularly scheduled construction progress meetings. These meetings will include meeting agendas covering project specifics and schedules. Notes will be taken by the ENGINEER at the meetings. Minutes will then be developed and distributed to the City of Round Rock Staff and the contractor. E. The ENGINEER will make periodic visits to the project site. These site visits are utilized to perform a general overview of the project and answer any questions the contractor may have. The City of Round Rock will provide daily on-site representation for the project. F. The ENGINEER will conduct a final walk through of the project. Punch list items will be generated during this review.A letter addressed to City Staff will be generated discussing the findings of the walk through. The contractor will be copied on this letter as well. G. The ENGINEER will develop final record drawings for the City of Round Rock Staff. The record drawings will be presented in electronic form with pdf of each plan sheet and provided via thumb drive or DVD. A digital CAD file will also be provided to the City, which will include shape file for the new wastewater lines. A full 11"x17" hard copy can also be made available upon request. Page B-2 of B-3 3. KEY PERSONNEL A summary of the proposed engineering team including names and titles are presented in table B-1. TABLE B-1 SUMMARY OF PROPOSED ENGINEERING TEAM PERSONNEL NAME TITLE Trae Sutton, P.E., CFM Partner, Project Manager Michael Newman, P.E., CFM Design Engineer Addison Skrla, P.E. Design Engineer Sam Blumenthal, E.I.T. Engineer-in-Training Laura Chapman, P.M.P. Environmental Scientist Sean Iliff CADD Technician Bruce Richardson CADD Technician Chelsea Hebert CADD Technician Page B-3 of B-3 ADDENDUM TO EXHIBIT C Work Schedule The City and ENGINEER agree with the project schedule below based on an anticipated Notice To Proceed on or before December 1, 2021 Estimated Date Milestone Complete Draft Report Complete Final Report March 15, 2022 Final Plans/Specifications May 15, 2022 Bidding and Award December 15,2022 Construction ADDENDUM TO EXHIBIT D Fee Schedule Project Name: Cycle 3—Basin 4 and 5—Wastewater Main Rehabilitation Total Total Loaded Other Labor TOTALS Task Hours Labor Cost Direct Costs Subconsultants Task 1: System Review and Report Preparation Complete Task 2: Data Collection &Site Surveys 38 $ 4,520.00 $ - $ 24,800.00 $ 29,320.00 Task 3: Final Design 812 $ 102,080.00 $ 1,250.00 $ - $ 103,330.00 Task 4: Bidding 49 $ 6,460.00 $ 250.00 $ $ 6,710.00 Task 5: Construction Administration 239 $ 32,310.00 $ 600.00 $ - $ 32,910.00 GRAND TOTAL: 1,138 $ 145,370.00 $ 2,100.00 1 $ 24,800.00 $ 172,270.00 CERTIFICATE OF INTERESTED PARTIES FORM 1295 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1.2.3.5.and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,.and the city,state and country of the business entity's place Certificate Number: of business. 2021-81727 7 KPA Engineers Georgetown. TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for Which the form is it r'27'�021 being filed. City of Round Rock. Texas Date Acknowledged: 11t12i2021 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services.goods.or other property to be provided under the contract. 00000 Cycle 3—Basins 4&5 WW Collection System Rehabilitation 4 Nature of interest Name of Interested Party City,State.Country(place of business) (check applicable) Controlling Intermediary Simcik. PE,John A. Temple. TX United States X Sutton. III. PE,Alvw R. Georgetown, TX United States Tolbert,PE, Ginger R. Temple. TX United States X Valle, PE.Thomas D. Temple. TX United States r Patrick. PE. R. David -en;ple. TX United States X Kasberg. PE. Rick N. Temple. TX United States X 5 Check only if there is NO Interested Party. ❑ 6 LINSWORN DECLARATION My name is and my date of birth is My address is (street) cty, state) ,zip code., (cou.�trr, I declare under penalty of penury that the foregoing is true and correct. Executed in County State of on the day of .20 month) ;year, Signature of authorized agent of contracting business entity Der_iarant i Forms provided by Texas Ethics Commission v m.ethics.state.Dcus Version V1.1.191b5cdc CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2021-817277 KPA Engineers Georgetown,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 10/27/2021 being filed. City of Round Rock,Texas Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 00000 Cycle 3—Basins 4&5 WW Collection System Rehabilitation 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Simcik, PE,John A. Temple,TX United States X Sutton, III, PE,Alvin R. Georgetown,TX United States X Tolbert, PE, Ginger R. Temple,TX United States X Valle, PE,Thomas D. Temple,TX United States X Patrick, PE, R. David Temple,TX United States X Kasberg, PE, Rick N. Temple,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is Alvin R.Sutton,III and my date of birth is My address is 800 South Austin Ave. Georgetown TX 78626 USA (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in Williamson County, State of Texas on the 27 day of October 20 21 (month) (year) Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.1.191b5cdc