Loading...
R-2021-320 - 12/2/2021 RESOLUTION NO. R-2021-320 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Company, Inc. for the Northeast Downtown Infrastructure Improvements Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 4,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 4 to the Contract with Cash Construction Company, Inc. for the Northeast Downtown Infrastructure Improvements Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 2nd day of December, 2021. CRAIG RGA ayor City of Round Rock, Texas ATTEST: & <1 MEAGAN S INKS, City ICIerk 0112.20212;4854-8894-2852 EXHIBIT Page Iof3 Contrail Quantity Adjustment/Change Order ev,A/16 Department: UES Project Name: Northeast DowntownRevitalization Date: 11 17 21 City Project Change Order/Quantity ID Number NEDTUjN£t7TR Adjustment No. 4 _ Vendor Cash Construction 217 Kingston lacy Blvd.-Pflu TvNe Texas 78660 512:251-7872 Company Name Address Phone No. 3w0 icathm Change Ordler/Quantfty Adjustment No.4,-s for mstallahon of concrete headwaN at end ot� Sheppard Street near Ruby Hotel and for bid item quantity overages. SUMMARY Amount %am" Original Contract Price: S7,823,780. Previous Quantity AdjuAment(s): s0.00 This Quantity Adjustment: $162,306.25 Total Quantity Aduustment(s): $0.00 Total Contract Pnce with Quantity Adju�nenu(s) $7,986,086 Previous Change Ordegs): 5% t;391,749.20 This Change Order: $169,100.00 2% Total Change Orders)To Date: $560,849.20 7% Adjusted Contract Prce [Orginna Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)): x8,546,935.45 Difference between Original and Adjusted Contract Pr ces: $723,1SS.45 Original Contract Time: 365 Time Adjustment by previous Quan.Adj./Change Order. 0 Time Adjustment try this Quan Ad),/Change Order: 90 New Contract Time: 455 Prel;ianid Dr. Eddie Za:eta Senior Project Manager,Cr,of Round Rock 11 1 21 Tile, Pnnbed Name,T ,Company Oak Contractor MMT o-tty v rU t^R 03 eur C xetv 1)v tf .e++* e�rIt +�c.cast►Construction t � city Printed Name,Tittle,Company Date f 7,r-�- 7Managff: �'- -- — Eddie Zarata;Senior or Nr Pxt Manager Printed Name,Title Cta Mayor/City Manager Craig Morgan Mayor Slgnawre Printed Name,Tile Date hp2of3 Contract Quantity Adjustment/Change Order Pro)ect Name: Nordwst DowntOwnRevitalization Quan.Adj./Change Order No.: 4 chaa a Order Debi conbod Time Adjustment nm i Item Dequiption Ul* Unit Mo Anrount 110" 4 1 Construction Layott L5, 1 750. go CD 4-2 Rock Excavabon and had off Ls. 1 17,000.001 CO 4-3 Headwall Concrete LS. i 75, # 000 C D 4.4 Gabion 6a*eWftsion MaW _ Ls. 1 #54 850.00 54 CD 4-5 BaddgW a Grad+ LS. 1 7 000.00 $7,000.001 CD 46 Ex t bon sod " Y Ls. 1 # 500. 2 47 T Pavement Restoration at "M 'M 300 Page 3 of 3 Contract Quantity Adjustment/Change Order isoi , .k�ara Project Name: Northeast DowntownRevitalization Quan.Adj./Change Order No.: 4 -quantlity AdJusitment Data Contract Time Rdtw* Item Descri lion Unk tlnkFdot Amount AdlustaKnt >t4 81 -inch DI Ct350 water me the IF. 200 87 Ductile iron ftnqs, 1qkace Tn 2 or recww*tt lateral water service to existing or replace pipe 88 1-1/2 or 2-inch water service to aty meter Ea. 11 $3,500.00 90 Wet connection to water main 8-inch Ea $1,700.00 162 rricades,s and trait handling Mo 2 ;2 W0. ,000 Pipe,6-inch SDR-26 class 160 wastewater line,open Cutak 2048 depths,complete in place 1F. 45O $154. ,300 CO3-2 blast 6-inch wastewater with 84nch HDPE LF. 3 $93.75 281.25 CO3-3 Remrriert to wastewater Service Lateral Ea. 1 $1,500.00 1,500.00 CO3-4 Waskmater Service Saddles Ea. 1 $125.00 $125.00 .001 iA. f o.00 .00 �.00 00 .00 -- 00 00 00