R-2022-032 - 1/27/2022 RESOLUTION NO. R-2022-032 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with CP&Y, Inc. lor the Northeast Downtown Improvements Project, and WHEREAS, CP&Y, Inc. has SUbmitted Supplemental. Contract No. 4 to the Contract to rnodity the provisions :f'or the scope of services and to increase the compensation, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 4 with CP&Y, Inc., Now Therefore BE IT RESOLVED BV THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behall'ol"the City Supplemental Contract No. 4 to the Contract with CI-'&Y, Inc., a copy of sarne being attached hereto as Exhibit "A" and incorporated herein for all purposes, The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject rnatter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 27th, day of January, 2022. /11" CRAIG 0 iG - Mayor City of Round Rock, Texas ATTEST: M--'Ad'AN SP KS" Ci Clerk.t a'1Gi2 20222,4883A 104.0777 EXHIBIT STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: CP&Y.INC. ("Engineer") ADDRESS: 13809 Research Blvd.,Suite 300,Austin,TR 78750 PROJECT: Northeast Downtown Improvements This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and CP&Y, Inc., hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 12th day of September, 2019 for the Northeast Downtown Improvements Project in the amount of$960,600.54; and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on April 24, 2020 to amend the scope of services and to increase the compensation by $22,482.00 to a total of $983,082.54; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on November 12, 2020 to amend the scope of services and to increase the compensation by $137,950.00 to a total of$1,121,032.54; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on July 9, 2021 to amend the scope of services and to increase the compensation by $18,500.00 to a total of $1,139,532.54;and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$93,050.00 to a total of$1,232,582.54; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: 1. Article 2. Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Supplemental Contract Rev.06/16 0199.1949;4872-9757-4152 84275 1 II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $93,050.00 the maximum amount payable under the Contract for a total of$1,232,582.54, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06t16 0199.1949;4872-9757-4152 84275 2 C ' By: Date ZIQ /2022 Supplcmcnlul Contruc t 1tcv,06P16 01199.1949,4872-9757A 152 94275 3 CITY OF ROUND ROCK APPROVED AS TO FORM: By: Craig Morgan,Mayor Stephan L. Sheets,City Attorney Date Supplemental Contract Rev.06/16 0199.1949;4872-9757-4152 84275 4 ADDENDUM TO EXHIBIT B Engineering Services In addition to the scope outlined in the Northeast Downtown Revitalization Project contract,dated September 12,2019; Supplemental No. 1;Supplemental No.2;and Supplemental No.3;the engineer shall provide two headwall design iterations and schedule extension related to the headwall installation and ongoing Library project coordination.A portion of the site was inaccessible during design due to overgrowth/vegetation and a steep slope to the creek,and survey could not be obtained by the design team.Once the area was cleared by the contractor,the design team was able to coordinate with the City and adjacent property owners to develop a solution to the challenging outfall area.Two design iterations are captured here.The schedule has been extended to accommodate change requests and regular adjustments to construction sequencing associated with the Library construction.Additional project management is included for the aforementioned work.The tasks and products are more fully described in the following TASK OUTLINE. TASK OUTLINE III. ADDITIONAL SERVICES F. Additional effort for Supplemental No.4: 1. HEADWALL DESIGN (a) Coordinate with contractor and surveyor to obtain the necessary information to design the headwall. (b) Coordinate with City and adjacent property owners on design elements via calls,meetings,and site visits. (c) Prepare two iterations of headwall design by a team of senior structural engineers and technicians. Headwall is comprised of custom gabion wall and culvert wingwall. Confirm storm design calculations and update drainage sheets accordingly. 2. LIBRARY COORDINATION (a) Project management activities for four-month schedule extension associated with ongoing Library project coordination including meetings with Library contractor, City, and internal team along with invoicing, reporting,meeting minutes,and monitoring of sub-consultant work. 12/13/2021 1 of 1 ADDENDUM TO EXHIBIT C Work Schedule Task Duration Completion Date Notice to Proceed N/A Jan 1,2022 Additional Services(Headwall/PM) 120 May 1,2022 Exhibit C 12/13/2021 1of1 ADDENDUM TO EXfIIBIT D Fee Schedule Attached Behind This Page Exhibit D - CP&Y, INC. i /� �i✓,A ' � /C�„ r �; '^M,"Ij` 19AjMi M ��, /r WO ;; „ =rrr //% //rr/�, J/ r i/ rr/ /ii/,r,,:✓////r iris p rr /�,` r% ��/% '/ �� r _. .r�/..Rw ' ''////"do ,.......... _.... .. ,. __ ,,..,. ____. ______ ............. ...,......_, ..................,...,. w.,.....,, ........,.,. ........,.,,,.,. SUBTOTAL BASIC SERVICES S �7777m .m. / ,: // N/A .......... ...._.,,,.-------------- _.......__ __ _.._ .,,.,. SUBT0 L.IIIRECTEXPENSES S BASIC SERVICES SUBTOTAL $ .... . .. ......... _.._.._. -- - — ........ ..... ... .... . ... .... . SA'E IA SSE 1NAcEl', N/ $ SUBTOTAL SPECIAL SERVICES $ Weadwall Desagn.. . .., CF'&Y $ 61,B3C1 d0 ... Library CoordlnaiGn... cp&Y $ 31,450,00 SUBTOTAL ACIDITIONAL SERVICES $ 93,050..00 GRAND TOTALI $ 93,050.00 4,0 E:.XHiB1T D MEDT RevltaHzation SA 44 SUMMARY Page 1 of 2 Exhibit Q-CP&Y, INC. Fee Schedule/Budget for CP&Y,Inc. Q'immamm,go-mm, Im W.ADD177ONAL.SERWC€S Ill Additional Services ------_ -._---.. Headwall Des;fln -------_ -------- Surray Coord.neticn 2 6 2 — 4 =4 S 2,330,GO CitytFropertyt wnerCoordinaticn _._. d 12 a 12 -_ 36 S 5,900,00 --- Headwatl Design Iterations —` - 4 12 64 120 120 � 410 5 53,370.00 LlLraay Coordination ProecdManag menVSGtredu:eExmnsmn 50 50 20 - 20 401 70- -190 S 31-450-GO ...�...�,�,\... ;,- - ,-� „\cam` _- •. -.��- � u._� ._- -.._.- _,���� ....` ._��.-:�--. �� - �. .1 - HOURS SUB-TOTALS _ --__ 60 30t0 50 12'3 i20 120 10 650- S 93,050.00 SIJE§TQTFc4 - i#,400.1 S ?, 0'u'. S ti,1G0-ix'} $ S3G.'`aO,40 ':s '.5_G��€;.t?0 a i3-20=u. ' = 13,2W100 7a0.0f! ---_ S 93,tS5p.A£i 4.0 EXHIBIT D NEUT Revitalization SA 44 CR&Y Page Z of 04 IaAS \\ \�lo ^_ _ \ ' \ x e. \\\ \� , �� ��\,�..... � � ter' •,,�`� ..�\ � \, \ �\� \� - t P ul y , 271, a, y \ F \, -%tr tt w ISM, OWN IT . \ , n tea: a'. r 5 t_ F % P 80 s 9 � _ _ \ o v a ---