Loading...
CM-2022-030 - 2/18/2022STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PLUMMER ASSOCIATES, INC; ("Engineer") ADDRESS: 1221 Auraria Parkway, Denver, CO „80204 PROJECT: Communications and Water Plant Control Systems Improvements This Supplemental Contract No. I to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Plummer Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 12th day of March, 2020 for the Communications and Water Plant Control System Improvements Project in the amount of$798,337.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $24,585,00 to a total of $822,922.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2 Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. _ I I. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $24,585.00 the maximum amount payable under the Contract for a total of $822,922.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follo�i j Cn� 2022-d30 Supplemental Contract 0 199.20205; 4868-6151-1468 Rev.06/ 16 84275 PLUMMER ASSOCIATES, INC. By: Date Supplemental Contract Rev.06, 16 0 199.20205; 4868-6151-1408 84275 CITY OF ROUND ROCK APP O 'ED AS TO RM: By: LQv—\.Z, n1j'1 aA ANL Laurie Hadley, City Manager St4phanheets,City Attorney Date ...... -� Supplemental Contract Rev.06/16 0199.20205;4868-6151-1468 84275 ADDENDUM TO EXHIBIT B Engineering Services This Exhibit is part of the Agreement between Plummer Associates, Inc. (Plummer) (the "Engineer") and the City of Round Rock (the "City") for the project generally described as: Communications and Water Plant Control System Improvements Engineering and Configuration Services Introduction The original scope of this project is to provide engineering services to upgrade the remote site communications system and at the Water Treatment Plant (WTP), replace the updated Modicon Quantum programmable logic controllers (PLCs) with current Modicon M580/M340 PI -Cs, replace the Wonderware Human Machine Interface (HMI) software with Ignition HMI, replace flocculator and rapid mix variable frequency drives (VFDs), provide power monitoring equipment and software for high service pumps and provide configuration/programming services as outlined in Project 2. Changes to the Scope of Services include: Project 2 — PLC/HMI programming and configuration services for the project performed by Plummer Task E— HMI Configuration Services 1. Provide additional programming and configuration services to complete the remote RTLls and WTP: 1.1 Engineer will provide HMI configuration and commissioning support for the WTP Dashboard and Overview screens. 1.2 Engineer will provide HMI configuration and commissioning support for the Raw Water Dashboard, pump control, valve control and trending screens. 1.3 Engineer will provide HMI configuration and commissioning support for the Filter runtime screens. 1.4 Engineer will provide HMI configuration and commissioning support for the WTP High Service Pump screens. 1.5 Engineer will provide HMI configuration and commissioning support for the WTP Filter screens 1.6 Engineer will provide HMI configuration and commissioning support for the Distribution System Dashboard and related screens 1.7 Engineer will provide HMI configuration and commissioning support for the Reuse and Lift Station screens 1.8 Engineer will provide HMI configuration and commissioning support for the audit log, Comms, and Network system status screens Task F — PLC Programming Services 2. Provide additional programming and configuration services to complete the remote RTUs and WTP: 2.1 Engineer will provide FEP programming modifications for new RTU sites and Back-up communications Task G — Project Management 3. Provide additional programming and configuration services to complete the remote RTUs and WTP: 3.1. Engineer will provide project management, construction progress meeting, and invoicing support for two additional months 3.2. Engineer will provide O&M manual preparation for html-based O&M manual update to be located on the HMI servers. 3.3. Engineer will provide additional site visits for checkout and commissioning of remote sites ADDENDUM TO EXHIBIT C Work Schedule The current project schedule from CPUSA shows substantial completion in February 2022, and final completion in March 2022. Depending on time granted with the change order, we believe that substantial completion will occur in February, 2022, and final completion in March 2022. Plummer intends to complete all activities within the Final completion window. ADDENDUM TO EXHIBIT D Fee Sehedule Attached Behind This Page CITY OF ROUND ROCK SITE COMMUNICATM3 AND WrP PC3 REPLACEMENT Am.ndm.nt I • AddHl0nFl S•rvlcas Pmj/st No. 3 lM 11PIwy M twl CFF.". 1147 brg0..pPiy� PlaWt Daft WMLWI 1t fi4s E.1 W.! P1ry >M. Frel NP Fwq E Oral Pr•7 Prep I E4e /pe MN Vim E ER ■ m ■ TrMrun Cltdwl QC T<YI LMw Fw ILLT! ANNem61wd 4 • AddVJOPW B•rvlan SWt OaY &WON• S 29 0 TSO 0 0 f0O 0 0 0 S 292 $ 24tSSS ! IYCw�/sA.. Maws • • / Y • 4 M / a a a 1p 1 cm ) sTwd.s o f � wr.al/swe.lR• o c • • • • • Y { F PLC•w9rwl+dll /Y.k.. 9 i • M • 1' 9 f Rw1EeR0.Cf�yn?FMy�fP�� fl 1 �] d 11A axw—hc-opwt611 M.b • / / p ( 1 i / / / • { Y { Z" 1.1 7 IIYN{ 7M.Y 0 { 60% J e.wt)rt Mwl. n 3 00% M FIII.el3rrl.ilruR a e / 1 a a M • • • • Y f /AN •Ia tm 60% 67 FS, vial3)9L 3 ) 2 { 6t0 25T1 . � i�WJ(TIwJf4w�t _ n S 00% 1 a' i / 0 / 6 6 0 / { • • • { a 1 00% 3 ) dlNwlF �_._ l 9 OUF q am 1 LevM9 wet _ 0 3 _— �0i s 1 71 / / 1 - a F a a i f » f FrFY la 02% Tr Lrp HMgw • » I 6 i 130 I o I�I o I tw a e a I s m hilt LllW Yyyy I i I I I f MR5 IY,e% TeW A.RunY eT lrw Cr.arT 1 7Aq 1 1.1» I f 4 -1 1 -is - 13 Ii,epp I f • I i f - S IAH 4 mm 1a%or FrcrRtlltl Llbp 1.•% 31.e% I T7nL •/% I, A.I a/% s01% E •vi eax i,lm I e.x% TOTAL �l rrr /.afs.wtn. y 7— %.I.et... ar 1`+C. 1 FM 413 CA Md/.d CmR/a/ u __ wFaE—,Ca�R�R ce or3 filraerr evrw r�m.I cara.n f Its�s---•-- 1lsi s G1 IMst .c—Amr. 1.i51 S 0o IIerC�a s 1.t51 i a S.naa.r Tat.a.. s I.Is f CY Ct+1h�T11'. f 1 551 f CI f _ 1.15 f C3 i 1.16 f 1�5 f 5 4 m f Ci i TOTAL SM001MIRTARr MOIIIe 7 13 Rn u Mtf Mtl Mf•mbu-"O.ii*qP—Im OQOODAA-IP RC Fw.crMti9l O7fV P.W 01r9d CM dAwtlRotlr ME M 00dyRSrp3 81r1Y12 City of Round Rock ROUNQ ROGC CTEXAS Agenda Item Summary Agenda Number: Title: Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 1 with Plummer Associates, Inc. for the Communications and Water Plant Control System Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/18/2022 Dept Director: Michael Thane, Utilities & Environmental Services Director Cost: $24,585.00 Indexes: Self -Financed Water Construction Attachments: IAF, SA No. 1—Partially Signed Department: Utilities & Environmental Services Text of Legislative File CM-2022-030 The City's Communications and Water Plant Control System Improvements project involves updating communication infrastructure at Round Rock's Water Treatment Plant (WTP), reuse water distribution system, water distribution system, and wastewater collection system. Due to the rapid advancement of technology, the electronic control system infrastructure associated with Round Rock's WTP has either become outdated, reached its design life, or is no longer supported by the manufacturer. This project is reorganizing, consolidating controls, and upgrading the hardware and networking components to current industry standards. Additionally, this project is updating the current field communication network to a modern cellular network. Doing this will allow for increased reliability in the system, the ability to transmit more information, and increased ease in adding additional monitoring to the system. The initial engineering contract with Plummer Associates, Inc. was for $798,337 which included engineering services and self -performing a portion of the programming and integration work required for the project. Supplemental No. 1 is needed to address several additional programming and integration issues that were discovered during the course of the construction project. Additionally, the supplemental includes two additional months of construction phases services to the contract. Supplemental No. 1 is for $24,585. City of Round Rock Page 1 of 2 AA ends Item SummeryContlnued fCM-2022-030) - Cost: $24,58S Source of Funds: Self -Financed Water Construction City of Round Rock Page 2 of 2