R-2022-086 - 3/10/2022 RESOLUTION NO. R-2022-086 WHEREAS, the City of Round Rock has prCVi0L1Sly entered into a Conti-act for Engineering Services ("Contract") with Brown & Gay t!"rigincers, Inc. for the Gattis School Road Segment 6 Project, and WHEREAS, Brown & Gay Engineers, Inc. has submitted Supplemental C'ontract No. 7 to the Contract to modify the provisions for the scope of services and to increase the compensation, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 7 with Brown & Gay Engineers, Inc.,Now "I"herel'ore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 7 to the Contract with Brown & Gay Engineers, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place arid subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all dines during which this Resolution and the subject matter hercol'were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 55 1, Texas Government Code, as amended. RE SOLVED this I Oth day of March, 2022. Z' CRA16 0G Mayor City of " I o"and k, Texas A]"'TEST: AlrAG�ANA�S� KS, CitClerk (012.20222 4W."30-1 117 EXHIBIT ,.A„ STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.7 TO CONTRACT FOR ENGINEERING SERVICES FIRM: BROWN&GAY ENGINEERS,INC. ("Engineer") ADDRESS: 101 West Louis Henna Boulevard,Suite 400,Austin,TX 78728 PROJECT: Gattis School Road Segment 6 This Supplemental Contract No. 7 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Brown & Gay Engineers, Inc., hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the I I th day of February, 2016 for the Gattis School Road Segment 6 Project in the amount of$482,439.90;and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 to the Contract on May 10, 2018 by Resolution No. R-2018-5420 modifying the scope of services and increasing the compensation by$401.872.25 for a total of$884,312.15;and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 to the Contract on October 1, 2018 to modify the provisions for the scope of services and to increase the compensation by$8,540.00 for a total of$892,852.15;and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 to the Contract on September 12, 2019 to modify the provisions for the scope of services and to increase the compensation by$177,053.00 to a total of$1,069,905.15;and WHEREAS, the City and Engineer executed Supplemental Contract No. 4 to the Contract on January 23, 2020 to modify the provisions for the scope of services and to increase the compensation by$119,914.00 to a total of$1,189,819.15;and WHEREAS, the City and Engineer executed Supplemental Contract No. 5 to the Contract on December 2, 2020 to modify the provisions for the scope of services and to increase the compensation by$216,816.50 to a total of$1,406,635.65;and WHEREAS, the City and Engineer executed Supplemental Contract No. 6 to the Contract on March 26, 2021 to modify the provisions for the scope of services and to increase the compensation by$25,190.00 to a total of$1,431,825.65; and Supplemental Contract Rev.06/16 0199.1602;4891-2980-0461 84275 1 WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$88,390.00 to a total of$1,520,215.65; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1,City Services and Exhibit A. City Services shall be amended as set forth in Addendum to Exhibit A. II. Article 2. Engineering Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. III. Article 4. Compensation and Exhibit D Fee Schedule shall be amended by increasing by $88,390.00 the lump sum amount payable under the Contract for a total of$1,520,215.65, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.1602;4891-2980-0461 84275 2 BROWN&GAY ENGINEERS,INC, By: ( 4z;z,A,) L 9fy? a- Director of Tra port n 2/15/2022 Date Supplemental Contract Rev.06/16 0144.1602;4891-2980-0461 84275 3 CITY OF ROUND ROCK APPROVED AS TO FORM: By: Craig Morgan,Mayor Stephan L.Sheets,City Attorney Date Supplemental Contract Rev.06/16 0199.1602;4891-298U461 84275 4 ADDENDUM TO EXHIBIT A City Services • City of Round Rock will provide digital design files for development/roadway projects to the Engineer,as needed. • City of Round Rock will provide any records available which would assist in the completion ofthe project development. • City of Round Rock will provide timely reviews and decisions necessary to maintain the project work schedule. ADDENDUM TO EXHIBIT B Engineering Services The work to be performed by the ENGINEER under this contract consists of providing engineering services required for the development of construction plans for the widening and reconstruction of Gattis School Road from Red Bud Lane to Via Sonoma Trail and along Red Bud Lane approximately 500' south of Gattis School Road.The project consists of reconstructing approximately 0.65 miles of the existing 4-lane roadway section to a 6-lane divided facility and adding a right turn lane on Red Bud Lane. This project involves surveying, engineering analyses,and associated details necessary to produce PS&E to a 100%design, including bidding&award services,and construction phase support. The ENGINEER shall perform all work and prepare all deliverables in accordance with the latest version of the City of Round Rock criteria. The ENGINEER shall perform quality control and quality assurance(QA/QC)on all deliverables associated with this project. The ENGINEER shall provide traffic control in accordance with the Texas Manual on Uniform Traffic Control Devices(TMUTCD)when performing onsite activities associated with this contract. RIGHT OF WAY DATA (Function Code 130) 1. Utility Coordination(Halff Associates,Inc.) A. The Engineer shall perform all Subsurface Utility Engineering(SUE),Utility Coordination,and Utility Engineering services for approximately twelve(12)utilities as listed below: Underground • AT&T—Telephone • AT&T—Fiber Optic Cable • Grande Communications—Fiber Optic Cable • Round Rock ISD—Fiber Optic Cable • City of Round Rock—Water • City of Round Rock—Wastewater • City of Round Rock—Lighting/traffic signal • Time Warner Cable—Cable TV • Atmos Energy—Gas • Oncor Electric Delivery—Electric • Manville WSC—Water • Windermere Utility Co.—Wastewater • Zayo B. The work to be performed by the Engineer under this contract shall consist of providing engineering services required for SUE,Utility Coordination and Utility Engineering on the Gattis School Road Project. The existing utility file will be Sheet 1 of 5 referenced into the current roadway design sheets to create a test hole location work plan.A sketch of the area to be included for the proposed test hole locations"Level A"will be provided prior to the start of the work and must be approved by the City of Round Rock. C. These services include SUE,utility adjustment coordination activities including but not limited to, meeting and contact with utilities on the project, initial project notifications,preparation of existing utility layouts,providing progress reports, preparation of contact lists,reviewing conflicts between the utilities and the proposed project,and creation of a utility conflict list.The above list of services is general in nature and should not be considered inclusive to the engineer's responsibilities,as listed in the following scope. D. Subsurface Utility Engineering(SUE) including utility investigations subsurface and above ground prepared in accordance with AASHTO standards[ASCE C-1 38- 02] and Utility Quality Levels as follows. i. Utility Quality Levels are defined in cumulative order(least to greatest)as follows: a. Quality Level D -Existing Records: Utilities are plotted from review of available existing records. b. Quality Level C - Surface Visible Feature Survey: Quality level "D" information from existing records is combined with surveyed surface- visible features (performed by surveyor). Includes Quality Level D information. If there are variances in the designated work area of Level D then a new schematic or plan layout, if needed, is required showing the limits of the proposed project and limits of the work area required for this work authorization; including highway stations, limits within existing or proposed right of way,additional areas outside the proposed right of way, and distances or areas to be included down existing intersecting roadways. C. Quality Level B-Designate: Two-dimensional horizontal mapping.This information is obtained through the application and interpretation of appropriate non-destructive surface geophysical methods. Incorporates quality levels C and D information to produce Quality Level B. If there are variances in the designated work area of Level D then a new schematic or plan layout,if needed,is required showing the limits of the proposed project and limits of the work area required for this work authorization;including highway stations,limits within existing or proposed right of way,additional areas outside the proposed right of way, and distances or areas to be included down existing intersecting roadways. d. Quality Level A - Locate (Test Hole): Three-dimensional mapping and other characterization data.This information is obtained through exposing utility facilities through test holes. Actual locations are tied to survey control (performed by surveyor). Incorporates quality levels B, C and D information to produce Quality Level A. ii. Designate ,Quality Level B),Designate means to indicate the horizontal location of underground utilities by the application and interpretation of appropriate non- destructive surface geophysical techniques.Designate(Quality Level B)Services are inclusive of Quality levels C and D. Sheet 2 of 5 The UC shall: a. As requested by the City,compile"As Built"information from plans,plats and other location data as provided by the utility owners. b. Coordinate with utility owner when utility owner's policy is to designate their own facilities at no cost for preliminary survey purposes.The Engineer shall examine utility owner's work to ensure accuracy and completeness. C. Designate, record and mark the horizontal location of the existing utility facilities using non-destructive surface geophysical techniques.No storm sewer facilities are to be designated.A non-water base paint,utilizing the American Public Works Association(APWA)color code scheme,must be used on all surface markings of underground utilities d. Correlate utility owner records with designating data and resolve discrepancies using professional judgment.A color-coded composite utility facility plan with utility owner names, quality levels, line sizes and subsurface utility locate (test hole) locations, if applicable shall be submitted.It is understood that the line sizes of designated utility facilities detailed on the deliverable are from the best available records and that an actual line size is normally determined from a test hole vacuum excavation. A note must be placed on the designate deliverable that states"lines sizes are from best available records".All above ground appurtenance locations must be included in the deliverable.This information shall be provided in AutoCadd Civil 3D format.The electronic file shall be delivered on CD. A hard copy is required and must be sealed and dated by Halff. e. Clearly identify all utilities that were discovered from quality levels C and D investigation but cannot be depicted in quality level B standards.These utilities must have a unique line style and symbology in the designate (Quality Level B)deliverable. iii. Subsurface Utility Locate (Test Hole) Service (Quality Level A) (Un to 4 Test Holes),Locate means to obtain precise horizontal and vertical position,material type, condition,size and other data that may be obtainable about the utility facility and its surrounding environment through exposure by non-destructive excavation techniques that ensures the integrity of the utility facility.Subsurface Utility Locate (Test Hole)Services(Quality Level A)are inclusive of Quality Levels B,C,and D. The Engineer shall: a. Review requested test hole locations and advise the City of Round Rock in the development of an appropriate locate(test hole)work plan relative to the existing utility infrastructure and proposed highway design elements. b. Coordinate with utility owner inspectors as may be required by law or utility owner policy. C. Neatly cut and remove existing pavement material,such that the cut not to exceed 0.10 square meters(1.076 square feet)unless unusual circumstances exist. d. Measure and record the following data on an appropriately formatted test hole data sheet that has been sealed and dated by the Engineer: i. Elevation of top and/or bottom of utility tied to the datum of the furnished plan. (Provided by surveyor) Sheet 3 of 5 ii. Identify a minimum of two benchmarks utilized.Elevations shall be within an accuracy of 15mm (.591 inches)of utilized benchmarks. (Provided by surveyor) iii. Elevation of existing grade over utility at test hole location.(Provided by surveyor) iv. Horizontal location referenced to project coordinate datum.(Provided by surveyor) V. Outside diameter of pipe or width of duct banks and configuration of non-encased multi-conduit systems. vi. Utility facility material(s). vii. Utility facility condition. viii. Pavement thickness and type. ix. Coating/Wrapping information and condition. X. Unusual circumstances or field conditions. e. Excavate test holes in such a manner as to prevent any damage to wrappings,coatings,cathodic protection or other protective coverings and features. f. Be responsible for any damage to the utility during the locating process.In the event of damage,the Engineer shall stop work,notify the appropriate utility facility owner, City of Round Rock, and appropriate regulatory agencies.The regulatory agencies include but are not limited to the Railroad Commission of Texas and the Texas Commission on Environmental Quality.The Engineer will not resume work until the utility facility owner has determined the corrective action to be taken. The Engineer shall be liable for costs involved in the repair or replacement of the utility facility. g. Back fill excavations with appropriate material, compact backfill by mechanical means, and restore pavement and surface material. The Engineer shall be responsible for the integrity of the backfill and surface restoration for a period of three years. Install a marker ribbon throughout the backfill. h. Furnish and install a permanent above ground marker directly above center line of the utility facility. i. Provide complete restoration of work site and landscape to equal or better condition than before excavation. If a work site and landscape is not appropriately restored,the Engineer shall return to correct the condition at no extra charge to the City of Round Rock. j. Plot utility location position information to scale. E. Utility Adiustment Coordination including utility coordination meetings with individual utility companies,and communication and coordination with utilities. i. The Utility Coordinator shall perform utility coordination and liaison activities with involved utility owners,their consultants,and the City of Round Rock to achieve timely project notifications, formal coordination meetings, conflict analysis and resolution. a. The Utility Coordinator shall coordinate all activities with the City of Sheet 4 of Round Rock,or their designee,to facilitate the orderly progress and timely completion of the design phase. The Utility Coordinator will be responsible for the following: b. The Utility Coordinator shall provide initial project notification letters to all affected utility companies, owners, and other concerned parties, if needed. C. The Utility Coordinator shall provide the City of Round Rock and all affected utility companies and owners a Utility Contact List for each project with all information such as: (a) Owner's Name; (b)Contact Person; (c) Telephone Numbers; (d) Emergency Contact Number; (e) E-mail addresses; (f) as well as all pertinent information concerning their respective affected utilities and facilities, including but not limited to: size, number of poles,material,and other information which readily identifies the utilities companies'facilities. d. The Utility Coordinator shall advise utility companies and owners of the general characteristics of the Project and provide an illustration of the project footprint for mark-up of the utility facility locations that occupy the project area. e. The Utility Coordinator shall coordinate which utilities will conflict with roadway construction and make the utility company aware of these conflicts. f. The Utility Coordinator shall respond to request for information(RFI)'s as needed during the utility construction phase. g. The Utility Coordinator shall monitor the utility adjustments on a monthly basis and provide regular status updates. F. Utility Engineering The Engineer will provide engineering services required for the development of construction plans of Two 4-inch conduits for future fiber optic cable installation with pull boxes approximately every 500 feet. Conduit plans will be developed along Gattis School Road beginning at Via Sonoma Trail and ending at Red Bud Lane. The conduit plans will include lateral conduit connections between the conduit backbone and pull boxes located traffic signal cabinets. Lateral conduit connections to the traffic signal cabinets will utilize existing crossing locations already designed for proposed traffic signals at the following Gattis School Road cross streets: i. Via Sonoma Trail ii. Lake Forest Drive iii. High County Boulevard iv. Red Bud Lane Sheet 5 of 5 ADDENDUM TO EXHIBIT C Work Schedule DATE MILESTONE March 8—June 30,2021 Coordinate with Utilities April 2022 Letting(TxDOT) June 2022 Award Construction Contract-NTP Construction June 2022-March 2023 Construction Phase Services ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page PROJECT NAME: GATTIS SCHOOL RD EXHIBIT D-1-FEE SCHEDULE FROM RED BUD LN TO VIA SONOMA TRL FC DESCRIPTION BGE Halff Inland TOTAL FC 110 ROUTE AND DESIGN STUDIES $0.00 $0.00 FC 120 ENVIRONMENTAL $0.00 $0.00 FC 130 ROW $0.00 $53,535.00 $53,535.00 FC 145 GENERAL MANAGEMENT j COORDINATION $0.00 $0.00 FC 150 FIELD SURVEYING AND PHOTOGRAMMETRY $0.00 $3,208.00 $3,208.00 FC 160 ROADWAY DESIGN CONTROLS $10,170.00 $10,170.00 FC 161 DRAINAGE $0.00 $0.00 FC 162 SIGNING,PAVEMENT MARKINGS,AND SIGNALIZATION $0.00 FC 163 MISCELLANEOUS ROADWAY $9,122.00 $9,122.00 FC 170 BID PHASE SERVICES $0.00 $0.00 FC 309 CONSTRUCTION PHASE SUPPORT SERVICES $12,355.00 $12,355.00 EXPENSES 1 $0.001 $0.00 17-ITOTAL 1 $31,647.00 1 $53,535.00 $3,208.00 $88,390.00 BROWN GAY ENGINEERS,INC. EXHIBIT D-1-FEE SCHEDULE PROJECT NAME: GATTJS5CHOOL RD FROM RED BUD LN TO VIA SONOMA TRL TASK DESCRIPTION Senior Project Project EIT Senior Senior Senior ENV Admin/ Total TOTAL LABOR Ere jeq!V�qr h9ana er EngineerEngineer Tech CARD Op ENV Scientist Clerical HRS.&COSTS FC 110 ROUTE AND DESIGN STUDIES 0 $0.00 Data collection $0,00 Review of data $0.011 Com tete desiqn summary form 30.04 Route studies $0.00 CAMPO Ae2lication Assistance 0 0 0 0 0 0 0 1 $0.00 FC 120 ENVIRONMENTAL COMPLIANCE AND PUBLIC INVOLVEMENT 0 $0.00 1.Data Collection and Environmental Constraints Aga in 0 $0.00 2.TxC)CT Environmental Scoping Documentation 0 $0.00 3.ArchedoajSal Back 2round Study Technical Report 0 $0.00 4.Historic Structures Project Coordination Request Form 1 0 $0,03 5.Water Resources Technical Report 1 0 50.04 6.Biological Evaluation and Tier I Form 0 $0m 7.Hazardous Mateo als Initial Site Assessment 0 $om B.Traffic Noise Anal ni s 0 50.00 Coordination with TxDC)T on ENV 0 $0.00 Public involvement General public outreach 0 $0.00 Public meetings 0 $0.00 1 an 1 meetings with key stakeholders 0 $0.00 Community meetings w1h HOAs 0 50.00 FC 1$0 RIGHT OFWAY DATA 0 $0.00 Ulility coordination 0 $00,3 FC 145 PROJECT MANAGEMENT $0.00 Meetings 0 $0.00 General contract administration 0 $0.00 LGPP Checklist 0 $0.00 FC 169 ROADWAY DESIGN CONTROLS $10,170.00 Final Design Development Geometric desfqn I 0 $0.00 Revisions to Ali 2nmemttat 212ie-d limits) 0 $0,00 Design cross sections(util conflict) 0 $0.00 100%PS&E 111'ral Sections -0 $0.00 Plan&Profile Cr itngs 0 $0.00 Alignment Data Sheets 0 $0.00 Earthwork Quantities 0 s0 00 Idents potentiad utility conflictsladjustmerills 2 10 10 30 30 82 $10,170.00 FC 161 DRAINAGE $0.00 Extemall storm water hydrology(ext prop) 0 s6.66 internal storm water hycirdogy(ex1prop) 0 $0.00 HEC-RAS designs for all cross drama 12x% m ) 1 0 $0.00 Hydraulic Data SheetsI 0 $0.00 Culvert La)2ut P&P Sheets $0.00 Geook OE2!- e desi_n for proposed storm sewer(ex1prop) I 0 $0.00 Storm Sewer P&P Sheets 0 S000 Hydrauke Data Sheets-SS i a $0.00 Identily plential utfly conflictslaqjustrilents i a $0.00 Detention Designi 1 0 $000 Coordinate design Nvith the CoRR staff i 0 50.00 BROWN GAY ENGINEERS,INC EXHIBIT 0-1-FEE SCHEDULE PROJECT NAME:GAT nS SCHOOL RD FROM RED BUD LN TO VIA SONOMA TRI. TASK DESCRIPTION Senior Project Project EIT Senior senior Senior EMI Admin/ TOTAL LABOR Proect Mar Manager Engineer En ineer T CADD O ENV Scientist Clerical HRS.&COSTS FC16Z `SIGNIN tP.AVEMENTsMARIONGS,AND.SIGNALMATION.'_ Sinning&Pavement Markings plan sheets and details 0 $0.00 Proposed Traffic Signal layouts and details 0 $0.00 Quantity,Summary sheets 0 $0.00 FC101,,{YpSCE L NEOUS'ROAD A _. :. 59122.00. , TrafficcoMro1 s TCP Construction Narrative/Phased Construction 0 $0.00 Traffi control s TCP Phased Layouts 0 $0.00 Traffic control plans CP Cross Sections 0 $0.00 Traffic control plans(TCP)-Temp Signal analysis 0 $0.00 Title SheeVPmject La t/Misc Drawings 0 $0.00 Cost estimates 0 $0.00 Illumination Photometric Stu Modeled in AGI 32 0 $0.00 Illumination outRap Piot wi li M intensitymeasurements 0 $0,00 Illumination Circuit Desi n, uts,and Details 0 $0.00 Plan Change Coordination for ITS Conduit 2 6 6 30 10 54 $7,572.00 Specification Development 1 2 10 13 $1,550.00 x170:' DIPNASESi - AV Project Manual Development 0 $0.00 Pre-bid Meeting Attendance 0 S0.00 Respond to Bidders'Questions 0 $0.00 Bid tabulations&Award 0 $0.00 F.CaOB;sCONSTRUC,TMIP.HASE43 PPO TS V C :::: 77-..:. Pre-Contraction Meeting Attendance 0 $0,00 Site Visps 6 ea 0 $0.00 Shop DraWn s/SubmhWs Review 16 ea 0 $0,00 Change Orders review and rocessin Red Bud 5 15 15 35 30 100 $12 355.00 Respond to Contractor Questions %FIs 10 ea 0 $0.00 Prcject Walk-Thnr/Closarwt 0 $0.00 HOURS SUB-TOTALS 9 32 33 105 �0,0000�w 10 0 0 249 249 CONTRACT RATE PER HOUR $225.00 $174.00 $136.00 $110.00 $11 $195.00 $130.00 $69.00 TOTAL LABOR COSTS $2,025.00 $5,566.00 $4,554.00 $11,550.00 $3,3 $1,950.00 $0.00 $0.00 $31.647.00 SUBTOTAL $31647.00 TOTAL TOTAL Senior Project Project Senior Senior Senior ENV Admin/ FUNCTION CODE TOTAL COSTS DIRECT LABOR Project Manager Engineer EIT Engineer CADD ENV Scientist Clerical TOTAL MH BY FC EXPENSE COSTS Man er Tech Operator $31647.00 $0.00 $31,647.00 9 32 33 105 30 30 10 0 0 249 249 0 SUBTOTAL LABOR HOURS 9 32 33 105 30 30 10 0 0 249 249 SUBTOTAL LABOR EXPENSES31 647.00 $0.00 $31,647.00 1 3.6% 1 12.9%6 1 13.396 1 42.256 1 12.0% 1 12.096 1 4.0% 1 0.096 1 0.0% BROWN GAY ENGINEERS,INC EXHIBIT 0-1-FEE SCHEDULE PROJECT NAME:GATTIS SCHOOL RD FROM RED BUD LN TO VIA SONOMA TRL OTHER DIRECT EXPENSES QUANTITY UNIT RATE Mileage 0 mile $ 0.56 $D.00 Photocopies BIW 11"X 17' 0 each $ 0.20 $0.00 Photocopies Color 8 112"X 11 0 each $ 0.75 $0.00 Photocopies Color 11"X 17'1 0 each $ 1.25 $0.00 Geosearch hazmat 0 each $ 500.00 $0.00 Large Format Plotting 0 SF $ 2.25 $0.00 SUBTOTAL DIRECT EXPENSES $0.001 SUMMARY TOTAL LABOR COSTS $31,647.00 NON-SALARY OTHER DIRECT EXPENSES $0.00 GRAND TOTAL $31,647.00 HALFF R ASSOCIATES EXHIBIT 0-FEE SCHEDULE PROIECTNAME;42ATTI5$0WCL RD FROM RED BUD IN TO VIASONOMA TRI. PRINCIPAL PROJECT OR PROJECT DESIGN ETT SENIOR UTILITY CARD 2 AN 1M 2MAN 2MAN TOTAL BOR TASKIDESCRIPTION MANAGER ENGINEER ENGINEER ENGINEER UTILITY COORDINATOR 018 ANA TECH SURVEY FIELD SUE SUE LOCATING [ADMIN .MAN- CHARGES COORDINATOR RPLS CREW WANAGEf CREW CREW CREW HOURS TASK 1 SUBSURFACE UTILITY ENGINEERING(SUE) SUE FOR CONSTRUCTION PHASE 8 S 12 80 104 se,990 SD SUBTOTAL HOURS/COSTS 0 6 0 8 0 0 0 0 0 0 0 0 12 60 0 0 1004 9D 2 �RDI CNAnC MEETINGSICOORDINATION 20 20 $3,000 RESPOND TO RFT$ 10 10 10 00 8 118 $17,620 SUBTOTAL HOURSIC08T8 0 10 10 10 0 0 0 too 0 0 D 0 0 0 0 6 138 $2020 TASKS UTILITYENGINEERING EXISTING UTILTTYLAYOUTICONFLICTANALYSIS 10 4 20 34 85,450 MEETINGS 11 puSUe.up to 12 lndWMu&Q 0 20 CONDUIT DESIGN-RS 3 4 8 64 54 40 4 167 mA? SUBTOTAL HOURSICOST8 3 14 8 48 0 64 0 20 40 0 0 0 0 0 0 4 191 $23A2:— FUMUMMARY 0 TASKI SUBSURFACE UTILITY ENGINEERING(SUE) 0 6 0 0 0 0 0 0 0 0 0 0 12 80 0 0 .104 $8,990 TASK? UTILITY ADJUSTMENT COORDINATION 0 10 to 10 0 0 0 1000 0 O 0 0 0 0 e 138 $20,620 TASK UTUATYENGIN£ERING 3 14 8 49 0 54 0 20 b 0 0 0 0 0 0 4 191 $2U25 TOTAL HOURS 3 1 30 1 t0 1 64 0 1 54 1 0 120 40 0 0 0 12 1 80 1 0 1 1 12 433. RATES I$ $185.00 175.00 $150.00 130.00 1$100.00 170.00 5150.00 SBSAO $175.00 $90.00 1$140.00 $115.00 I 570.00 140.00 1 $240.00 585J10 USE SALARIES 3REIM"TOTAL $875. 50 63.150 119po $0 $S,400 16 0 $3,400 so 20 30' $11mo X600 $0 $700 63 36 SUE Level A(EA) 0.000 to 3.50ft Womoo $0 Over 3.50 ft to 10.00 0 $7,2$0.00 $0 Over 10.00 ft to 15.00 ft $7.500.00 $o Ov0r 15.000It)20.000 $7.$00.00 $o Over 20.008 $2,25400 $0 Subtaw so INLAND GEODETICS EXHIBIT A-1-FEE SCHEDULE AGonzales Est. PROJECT NAME: GATTIS SCHOOL RD FROM RED BUD LN TO VIA SONOMA TRL L � e _ �1 RATE I HOUR $138 $160 $183 $42 $136 $132 $118 $98 $98 $54 =, ROE SITE VISITS (TASK 2) 50.1 -ADMIM MOBILIZE 0 HRS 0 HRS 0 HRS 0 HRS 0 HRS 0 HRS 0 HRS 0 HRS 0 HRS 0 HRS ADDNL FIELD SURVEY - v . DELIVERABLES 50.2-FIELD SURVEYING 0 HRS 0 HRS 0 HRS 0 HRS 0 HRS 0 HRS 0 HRS 9 HRS 0 HRS 0 HRS BOUNDARY ANALYSIS SECONDARY FIELD SURVEY ROW ACQ PARCEL PROD ROW ACO PARCEL REV(1) 5 HRS 8 HRS 10 HRS `IH ,ZIQi ROW MONtMENATION \\ 50,3-ROW ACQ TASKS 0 HRS 5 HRS 0 HRS 0 HRS 8 HRS 10 HRS 0 HRS 0 HRS 0 HITS 0 HRS I SUS'=TOTAL 0 HRS 5 HRS 0 HRS 0 HRS 8 HRS 10 HRS 0 HRS 0 HRS- 0 HRS 1 0 HIRS REIMBURSEABLE ITEMS REIMBURSEABLE SERVICES ESTIMATED FEE $0 $800 $0 $0 $1,088 $1,320 $0 $0 $0 $0 Cost Variables: Reimburseable Services Include: Reirburseable Fees Include: GPS Receivers $15 $0.00 SUPPLIES $0.00 Vehicle $60 $0.00 TITLES $0.00 ATV $55 $0.00 Total: $0.00 Total: $0.00 fy(lln��iVl(Y7�mry,(�/a�'-.r ✓/?.�9(Yrm�!r�(1�!rr1�/i/��N��,i �%r`,%fj� f' � /� H f��de 4 a, ,j, ��, , /i it//// f„ " �I �' �✓ is- � � , �, �/,�, �� / ' / ,,,, �l /� y!r /%� p /i�� / IIY�'v �tf ;, ,,,✓, f i y,.. , � V r, � � y j�' r�� r% NW. u�' % / �i 1 , �" aA ,a y M1`if'kt b✓a /i/;� ;� ,/ '/ G+ "'kY," u� ' (��%��//�r/�P' 4 ��m'`j/i r ,I/r "� ,, �/ i/ ��� �4 �„r.. `s i � ,,,. i fJ. ✓ ri ����/�'(l/l,r U,,, ' F y', 'rww roru ww ,G y Yb'd 'i�! % / /// / /✓ m, , airlim� ., l/��'/ ,,, ///// rr � /Im w " r",",�o�^d1f rC'rn,oy,,,,,un,✓ Ai ,,:.. a uir,u Air Nrr r/✓rr„'r ,rtikrnrGr,/l� r/ilaraivr�f,/icr✓. �srrwrlF I ,,i o�,u !<; ' � Yi"4 � irs,,, Y s ",,,, �/ � � ,,, � /," ., It,,�d!;i (� / r pr. ,'�/��S e:1 ���/,, rr(,i � �/ 1 1 %/r�/A// 'A, , (a., �� � ,, � '/�,, ;�,1l,,,✓� /r„ i� , /�, /% y J %�y,�� "t �,. ! „r ",�� � iii:'' 1;� !% '"><%/;,,,' ,,�; ;1 � � i; -yr✓Gr/i�! r'`�/,,,� ,���1, li r'Fi'1,,;r / ,,,i���/% U i I ,/r r ;.� ,, �i J� ��/. I�j. ,��, //Ir a�� � ����� �r. /%'i r,. rr fI ,fir '. ,,,,; �✓i. Vii; '✓ � ".. �rr l i 9� I ii,��i r: i�+� / �;' J;�," J, //// „%?rwc, ) � /r j/% 1 q ✓ ,Y,/",",, r/9i >�'/,/. ,�.; ;' r' ���/i%/%� ✓, �/� ,; l' �, "4'' /'/' y Ili,.���/� �"!f ,/ /,. ,r, �,���, / /i �/%i li///,� l�/�/„ r r��/�/ ;C ��„ r,/w ''4'%' !, y �Vii. �`�Y� ��'y ✓ i ��'p' /, � r � r � / t✓,iwY�/ rr � � r � r� , a , l4 ,dlu � �11� r '� ✓ 'is �J ,�,�� /i % ,ra / ar � aA of i •. r, ..�,` 1/p,/1/0 �,/i�� �� "r 'j a rv'1✓ ,r i, ��/ /'� y H r a // y , l� r 0 a / f r/ I %i �'ri„ m//'l.; ✓ 'r j 'y �!/ .,/ r %�%�j/i; r�%Ij�� � / "„r, �,/ / � ”✓1„ %i%//%j/ / /��„, l /��/�,/.«,Mry d �i �/ /r �, � � r�����/%,;, rm�l�fJ✓ 1, rr iii; ,,� oi,c 72! i, ,GC ,e,YCUmAr w, ✓ ", �, „, „ , „� �„ � �r"r , lu "� ✓//,vim, �, � � /,�„.✓r ,