Name: Lake Creek Pump Station Chlorine System Improvements Date: 314/22
Change Order/Quantity
LCSCB Adjustment No. i
B-5 Construction Company, Inc. P. 0. Box 1488 - Magnolia, Texas 77353 (281) 356-3264
Company Name Address Phone No,
City Project
ID Number
Vendor
3ustification
UES
:hange Order/Quantity Adjsutment No. 1 is For replacing analog chlorine scale with digital chlorine scale including all electrical connections
SUMMARY
Amount
% Change
Original Contract Price:
$1,160,239.00
Previous Quantity Adjustment(s):
$0.00
This Quantity Adjustment:
$0.00
Total Quantity Adjustment(s):
$0.00
Total Contract Price with Quantity Adjustment(s):
$1,160,239.00
Previous Change Order(s):
$0.00
0%
This Change Order:
$34,051.00
3%
Total Change Order(s) To Date:
$34,051.00
3%
Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change
Order(s)]:
$1,194,290.00
Difference between Original and Adjusted Contract Prices:
$34,051,00
Original Contract Time:
226
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
226
_ Submitted for Approval
Prepared By:
Eddie Zapata, Senior Project Manager, City of Round Rock
X4122
Signature r
Printed Name, Title, Company
Date
Approvals
�1 ff�j �
Contractor: A (1 7t�
V Charlie Bell Project Manager, B 5 Construction Co. Inc.
Sig
Printed Name, Tide, Company
Da
City Project f
Manager:
Eddie Zapata, Senior Project Manager-
0 Z�
Sign re
Printed Name, Title
Dat
1:�
Mayor/City
Manager
r
Sigrilature v Printed Name, Title Date
,2dZZ Lv�
Page 2 of 3
Con- mr, Quout ty AdJustmant/CMr4m ordar
r rru
Project Name. lake Creek Pump StaWn ChWdne System Impmeno is
Quan. Adj./Change Order No.:
I'. �il—.
- � ,-.� �e. - �
C ��
r,�� i�--*�-•-�---...-tom
- _ -Jl-
--- - -- �
J.-
Page 3 of 3
Contract Quantity Adjustment/Change Order
w,. nrac
Project Name: Lake Creek Pump Station Chlorine System Improvements
Quan. Adj./Change Order No.
uantity Adjustment Data
ontract
Time
Adjustment
-- oil
_- MI i
�+ • _;..tea �- -',r '_ - . ,y '.� � - r .� ."",��" -�,�
ed
Ole
5; JAL
}
} At ,
Y *:� fig • .�.r- ;� x _ � � J � - i
/ f f
'f -LakeChlorine Building
and Chlorine Scrubber Location
'S �
ITUN13 ROCK
XAS
City of Round Rock
Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 1 with B-5
Construction Co., Inc for the Lake Creek Pump Station Chlorine System
Improvements.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 3/18/2022
Dept Director: Michael Thane, Utilities and Environmental Services Director
Cost: $34,051,00
Indexes: Self -Financed Water Construction
Attachments: QA.CO no.1-B5-Lake Creek, Map
Department: Utilities & Environmental Services
Text of Legislative File CM-2022-064
The City operates a groundwater well site located south of downtown Round Rock. This site, referred to as
the Lake Creek well site and pump station, uses chlorine gas in its treatment process. The chlorine gas is
stored and utilized inside of a chlorine building located onsite.
The Utilities and Environmental Services (U&ES) Department recently completed a risk assessment for the
water utility. This risk assessment identified the lack of an emergency chlorine scrubber system at the Lake
Creek well site as a potential risk. To mitigate this risk, our department seeks to add a chlorine scrubber
system to the existing chlorine building.
A chlorine scrubber system is activated in the event that a chlorine leak is detected inside the chlorine
building. When the system is activated, chlorine gas is pulled from the building by the scrubber unit and
neutralized. The addition of a chlorine scrubber unit will greatly increase operator safety and prevent
damage to the Lake Creek well site in the event of a chlorine leak.
The existing chlorine building is not of sufficient quality to support a chlorine scrubber unit due to the
buildings inability to be sealed in an emergency. In addition to the chlorine scrubber unit, this project
includes the construction of a new chlorine building that will facilitate the use of the scrubber. A bathroom
for the plant operators will also be added to the new chlorine building.
City of Round Rock Page 1 of 2
Agenda hem Summary Continued (CM-2022-0")
The City opened three bids on July 13, 2021. B-5 Construction Company Inc. was the low bid at
$1,160,239.
Change Order No. 1 is for adding digital chlorine scales including all electrical connections in lieu of analog
chlorine scales. Digital scales will allow the water treatment plant operators to remotely monitor chlorine
consumption at the lake Creek well site. Change Order No. 1 will increase the existing contract by $34,051.
The new contract amount will be $1,194,290.
Cost: $34,051
Source of Funds: Self -Financed Water Construction