Contract - BCRUA, Cedar Park, Leander - 12/16/2021
12th
December
Exhibit F
BCRUA Regional Water Project
Maximum Capacities and Delivery Rates -November 17, 2021
Maximum Maximum Maximum %of Maximum Maximum Maximum
Daily Daily Daily Capacity Instantaneous Instantaneous Instantaneous
Capacity Capacity Capacity Rate 1B(GPM) Rate 1C(GPM) Rate 1D(GPM)
Phase 16 Phase 1C Phase 1D
(MGD) (MGD) (MGD)
Cedar Park 5.6 8.67 11.17 26.67 3,889 6,021 7,757
Leander 9.8 15.16 19.56 46.67 6,806 10,528 13,583
Round Rock 5.6 8.67 11.17 26.67 3,889 6,021 7,757
Total 21.00 32.50 41.90 100 14,584 22,670 29,090
II
I
i
I
i
E
i
i