Loading...
R-2022-165 - 5/12/2022 RESOLUTION NO. R-2022,-165 WHEREAS, the City of' Rot,nd Rock has dUly advertised for bids for the Water Treatment Pkiat Pressure Control Valves Project;, and WHEREAS, while only one bid was received from Prota, Inc., the City COLIDed has determined that the bid is acceptable, �aiid WHEREAS, the City Council wishes to accept the bid of Prota, Inc., Now Therefore 13E IT RESOLVED BV JIM COUNCIL oFTHE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized ai-id directed to CXeCLIte on behalf of the City a contract with Prota, Inc. for the Water Treatment Plant Pressure, Control Valves Project. The City Council hereby finds and declares that written notice of the date, h0Ur, place and subject; of [lie meeting at which this Resolution was adopted was posted and that SLIC11 meeting was open to the public as required by law at all times during which this Resolution and the subject inatter hereof were discussed, considered and (banally acted LIP011, all as required by the Open Meetings Act, Chapter 551, Texas Government Code., as amended, RESOLVED this l2th day o8'May, 2022. CRAIG (1 A Mayor City 0 1.,JZt rid1� k, Texas A'l"I'E ST: MEAGAN SPI KS, City tlerk N]220227,4S5�-H487'62 C D M. smith 9430 Research Boulevard Building I,Suite 200 Austin,Texas 78759 Tel: (512)346-1110 Fax: (51.2)345-1483 April 21, 2022 Mr. Kit Perkins, P.E. Senior Utility Engineer City of Round Rock 2.21 East Main Street Round Rock,TX 78664 RE: Water Treatment Plant.Pressure Control Valves Recommendation of Award Dear Mr. Perkins: The Water Treatment Plant Pressure Control Valves (WTP PCV) Project was advertised for public bids on February 23 and March 2 in the Pflugervrlle Pflag and on February 24 and March 3 in the Round Rock Leoder. We also provided the Invitation to Bid to severa8 contractors who we have worked with on previous projects to make certain that general contractors were aware of the project. Plans and specifications were made available to interested parties via CivCast. On March 10, 2022,at 2.00 p.m. bids for the WTP PCV Project were received and then opened and publicly read aloud at the Utilities and Transportation, Bob Bennett Building, Texas Conference Room at 3400 Sunrise Rd, Round Rock, TX 78665. One bid was received,and the name of the bidder and total project base bid amount is summarized below. 1. PROTA, Inc. $1,508,867.00 A bid tabulation of all the bid items is attached.The apparent low bidder on the project is PROTA, Inc. All projects bidding in the past several months have experienced lower participation and higher prices than has been the norm in the past several years. Discussing this change with general contractors, we are in a time where it is difficult to find qualified employees and there are rapidly increasing prices for building materials,fabrications and construction subconsultant services. Although the low bid is significantly over the OPCC of$650,000, we recommend accepting the proposal from PROTA, Inc.. instead of re-bidding the project as we do not believe we will receive more interest nor lower prices. The project contains two pressure control valves and associated piping and instrumentation improvements. One valve will allow a change in operations of the high service pump station at the WTP that will facilitate the paunting of the existing Barton Dill Elevated Storage Tank.This valve will WATER+ENVIRONMENT+TRANSPORTATION A-ENERGY 4-FACILITIES CDN`! Smith Mr. Q Perkins April 27, 2022 Page 2 also serve as a surge relief value to protect the high service pump statim for surge pressures..The second valve will provide the ability to receive BCRUA water at the WTP where it can be pumped to provide water east of IH-35.This increased flexibility will proviide additional resilience to the City's water supply and distribution system. Based on positive past project experience with PROTA, Inc. and the information provided, we believe that PROTA, Inc. can successfully complete the WTP PCV Project as designed and specified. We recommend awarding the WTP PCV project to PROTA, Inc. in the amount of 1,598,867.00 (base bid). Sincerely, . ht Allen Woelke, P.F. CDM Smith Inc. TBPF Firm Registration No. F-3043 cc: Chad Johnson, PF, CDM Smith Kaitlyn Saucedo, City of Round Rack Attochments Enclosed CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities£& Environmental Services BY: Sara Kesselring 3400 Sunrise Road DATE: TABULATION March 10,2I122 Round Rock,Texas 78665 PROJECT: Water Treatment Plant Pressure Control Valves LOCATION: 3400 Sunrise Load Corm any Name: Prota,Inc. XIII)DATE: 3/10#2022 Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes tddendum(s)? Addendum(s)? Addendum(s)? 'Cddendunt(s)? Bid Bond? Yes Bid Bond? Yes Bid Fond:' Yes Bid Bond? Yes APPROX UNIT UNIT LNIT ITEMQTY. UNIT UNIT PRICE COST PRICE COST PRICE COSI PRICE COST Bonding.Insurance.Mobilization,and Demobilization. Move-in related expenses 1 not to exceed 5%of total bid. 1 LS 579,142.00 579,142.00 Stl.00 50.00 $(1.(141 Trench Safetv Flan and Implementation,as required for all excavations deeper than five feet,complete in place as detailed and 2 specified. 300 LS 5156.00 546.800.00 50.00 S .00 S0,00 Pressure Control Globe Valves(Cla-Val) and associated erosion control,tree protection,trench safety plan,trenching, valve vaults,gate valves,blowoff valves. piping, fittings, FCAs,restraints,tapping; sleeves and valves,electrical. instrumentation,controls,connections. testing,disinfection. -rading.paving,sod, landscape restoration,repair of all damaged existing facilities and utilities,driveway repair,and appurtenances required to complete the scope of work as defined in 3 Ithe bid documents. Il I'S $1.163.595.00 0 $1,363,595.00 Sil.00 so.00 SO.00 Pages 1 of 2 Updated 6/17/19 CITE'OF ROUND ROCK BIDS EXTENDED AND CHECKED E Utilities& Environmental Services BY: Sara Ressefring 3400 Sunrise Road DATE: starch 10,2022 Round Rock,Texas 7866-5 BID TABULATION PROJECT: Water Treatment Pant Pressure Control Valves Control Panels CSA Inc.controls programming and installation as detailed and specified. Contractor to include any profit and overhead for this line item with 4 other bid items. I LS W.330.00 S84. }0.00 $0.00 $0.00 SO.00 Allowance to be used for additional site improvements. landscaping and miscellaneous modifications.onk , if 15 approved bv Owner. I [_S 525,000.00 som $0,00 50.00 TOTAI. S1, 98,867.00 SO.00 50.00 SO.00 Page 2 of 2 Updated 6/17/19