Loading...
R-2022-187 - 5/26/2022 RESOLUTION NO. R-2022-187 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with LJA Engineering for the Red Bud Lane South Project, and WHEREAS, LJA Engineering has submitted Supplemental Contract No. 2 to the Contract to modify the provisions for the scope of services and to increase the compensation, and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 2 with LJA Engineering,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 2 to the Contract with LJA Engineering, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of May, 2022. 4 Al CRAIG ORG , Mayor City of Round Yck, Texas ATTEST: 01!�— 04, MEAGAN S NKS, Ci Clerk 0112 20212,4891-8284-5215 EXHIBIT STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: LJA ENGINEERING ("Engineer") ADDRESS: 2700 La Frontera Boulevard, Suite 150,Round Rock,TX 78681 PROJECT: Red Bud Lane South This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and LJA Engineering, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the"Contract", on the 26th day of September, 2019 for the Red Bud Lane South Project in the amount of$550,863.65; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on April 8, 2021 to amend the scope of services and to increase the compensation by $1,370,142.09 to a total of $1,921,005.74; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $226,790.00 to a total of$2,147,795.74; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: 1. Article 1, City Services and Exhibit A, City Services shall be amended as set forth in the attached Addendum To Exhibit A. II. Article 2, Engineering; Services and Exhibit B, Engineeriniz Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Supplemental Contract Rev.06/16 0199.1950;4868-3531-7278 84275 1 M. Article 4, Compensation and Exhibit D Fee Schedule shall be amended by increasing by $226,790.00 the lump sum amount payable under the Contract for a total of$2,147,795.74, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199-1950;4868-3531-7278 84275 2 LJA ENGINEERING yKenneth G.Schrock 51412022 Date Supplemental Contract Rev.06116 0199.1950;4868-3531-7278 84275 3 CITY OF ROUND ROCK APPROVED AS TO FORM: By: Craig Morgan,Mayor Stephan L. Sheets,City Attorney Date Supplemental Contract Rev.06t16 01991950;4868-3531-7278 84275 4 ADDENDUM TO EXHIBIT A City Services 1. City of Round Rock will provide any as-built drawings for developments along Red Bud Lane based on availability. 2. City shall any existing CADD/GIS files and pertinent as-built plans of the roadway, storm sewer, and water and wastewater utilities in the area. 3. City of Round Rock will provide any available traffic information to aid in pavement design. 4. The City will provide timely reviews in conjunction with the agreed upon schedule. 5. City of Round Rock will provide all City permits necessary. 6. The City will host monthly utility coordination meetings. 7. The City will provide payment for necessary permitting fees including TCEQ. 1 ADDENDUM TO EXHIBIT B Engineering Services Roadway: Red Bud Lane County: Williamson Limits: PS&E:from Gattis School Road to Forest Ridge Blvd./Evergreen Dr. General Work Description: Develop 60%,90%and 100% plans,specifications,and estimates (PS&E) of utility improvements to develop the Red Bud Lane Improvement Project. Add a new traffic signal at the intersection of Evergreen Dr./Forrest Ridge Blvd. and Red Bud Lane. After 60%utility conflict analysis,it was determined that the following improvements would be required to add to the project: Relocate the 16"waterline that is Relocate 16"Waterline currently in conflict due to the roadway being lowered. 4,000ft) South Red Bud Relocate PRV Vault Relocate the PRV Vault at Forest Lane(Gattis School Design Creek that is in conflict with road. to Forest Creek) Add a second PRV vault for Add a PRV Vault waterline heading south at Forest Creek. Relocate waterlines Clean up waterlines at intersection of Red Bud and Forest Creek. Relocate the existing 8"reuse line 8"Reuse from Bobby Jones Way to Forest Ridge Blvd due to road conflicts. South Red Bud Relocate the existing 12" force Lane(Forest Creek Design 12"Forcemain main from Bobby Jones Way to to Forest Ridge Forest Ridge Blvd due to road Blvd) conflicts. 6"Forcemain Relocate the existing 6"force main several hundred feet 8"Reuse line Install to CR123 Red Bud South 12"Forcemain Install to CR123 (Forest Ridge Blvd Design 6"Forcemain Install to CR123 to CR123) Summary: • 4,830 LF of waterline(16"and 12") relocated • 5,900 LF of force main(6"and 12") relocated • 16"waterline will be converted to a reuse line from Forest Creek Drive to CR 123. FC 145-PROJECT MANAGEMENT AND COMMUNICATION PLAN 1. Meetings 1 a. Team Coordination Meetings-Hold staff/team/discipline meetings at the Engineers office to coordinate the proposed utility and traffic signal design. 2. Invoicing and Contract Document Coordination a. Prepare Supplemental work authorization contract documents 3. Produce Project Scheduling a. Update design schedule in Microsoft Project format for approval by the City indicating tasks,milestones,major meetings,and reviews.Update schedule with each milestone deliverable. 4. Submittals and QA/QC a. QA/QC of all documents for additional work prior to milestone submittals (60%,90%, 100%).Detailed Check Review for all designs,Inter-discipline coordination review, detailed plan and construction reviews. b. Prepare Submittals for City Oversight Reviews (60%,90%,100%) c. Document control for project on all submittals,reviews,comments,and any other project files. FC 162.3 -TRAFFIC SIGNALS ♦ LJA will prepare plans,general notes,specifications,and estimates for traffic signal construction. The plans will be prepared in compliance with the Texas Manual on Uniform Traffic Control Devices (TMUTCD)and TxDOT and City of Round Rock standards, as applicable. ♦ LJA will prepare traffic signal pians for the Red Bud Lane at Evergreen Dr. intersection. ♦ The following plan sheets will be prepared for each intersection: o General Notes o Summary of traffic signal quantities o Existing Conditions Layout o Proposed Traffic Signal Layout o Signal Phasing and Writing Charts o Proposed Traffic Signal Elevations o Proposed Intersection Pavement Marking,Signing,and Curb Ramp Layouts o Traffic signal pole,foundation,and electrical service standard sheets with quantities. o Select and prepare all applicable TxDOT standard sheets for traffic signal construction and traffic control during signal construction. FC 163.10-UTILITY DESIGN The Engineer will perform: ♦ Site visits and field investigations as necessary to confirm field data o The Engineer will conduct two(2)site visits to verify data on utility locations, future alignments,conflicts, and other engineering aspects,and collect additional photography of existing conditions. For the purposes of estimating the effort for this task,it is assumed that the design team will conduct two (2) site visits using two (2) personnel. 2 The Engineer will develop the following plan sheets in accordance with City of Round Rocks' guidelines. ♦ Determine Preliminary Alignment Relocations and Appurtenance Placement,Limits of Improvements ♦ Prepare E&Q Sheet: Estimate and Quantity Data Sheet ♦ Prepare Project Layout/Horizontal Alignment Layout ♦ Prepare Waterline,Force Main,Reuse line Improvement Plan&Profile Sheets,and Reuse line Improvement Plan Sheets. ♦ Prepare Connecting Tie-In Lines Plan and Profile ♦ Waterline Adjustments o Clean up waterlines at intersection of Red Bud and Forest Creek. ♦ Prepare additional Construction Detail Sheets ♦ Pressure Reducing Valve Vault Location o Coordinate with city for size based on water model ♦ Prepare a list of force main and reuse Specifications complete with standard and special specifications with applicable special provisions needed for the project. ♦ Tabulate Quantities and Probable Construction Costs ■ The estimate will be in Microsoft Excel spreadsheet format,reflect Travis, Williamson County,and other recent local Average Unit Bid items and descriptions. The estimate will contain all major items that will likely be on the project ♦ Submit improvement plans to TCEQ for approval Milestone Comment Resolution ♦ Update plans per City of Round Rock comments received from the 60%,90%and 100%milestone review meetings. ♦ Deliverables o Exhibits for utility meetings o Route Layout o Construction Plan Submittals (60%,90%,100%) o Specifications Submittals(60%,90%, 100%) o Engineers Opinion of Probable Construction Costs(60%,90%,100%) o Electronic Graphics-provide the City an electronic deliverable of the pians (including standard drawings) submit both PDF&Microstation Format o Submittals— 60%,90%,and 100%submittals - Comments and revisions requested at the review meetings shall be incorporated into the plans for the subsequent submittal. 3 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page EXHIBIT C Red Bud Ln PS&E Schedule PROJECT NAME:Red Bud Lane SWA#1-Utility Improvements/Traffic Signal ID Task Name Duration Start Finish Qtr 2,2021 Qtr 3,2021 Qtr 4,2021 Qtr 1,2022 Qtr 2,2022 Qtr 3,2022 Qtr 4,2022 Mar A r May Jun Jul A Se Oct Nov Dec lan Feb Mar r a Jun ul Au Se O Nov Dec 1 NTP 0 days 411/21 411121 NTP 411 2 ROW Acquisition 330 days 4/1/21 2/24/22 Row Acquisition 2124 3 PS&E 584 days 4/1/21 11/5/22 PS&E 4 60%PS&E 442 days 4/1/21 6/16/22 so%PS&E 5 60%Design 120 days 4/1/21 7/29/21 6 60%Submittal to City 0 days 7/29/21 7/29/21 ;'7/29 7 City Review 21 days 7/30/21 8/19/21 8 Comment Resolution 30 days 8/20/21 8/29/21 9 60%Utility Submittal to City 0 days 5/27/22 5/27/22 5727 10 City Utility Review 21 days 5/27/22 6/16/22 11 90%PS&E 156 days 3/21/22 8/23/22 90%PUE 12 90%Design(Including Utilities) 124 days 3/21/22 7/22/22 F1413 90%Submittal to City 1 day 7/23/22 7/23/22 ;,7123 City Review 21 days 7/24/22 8/13/22 15 Comment Resolution 10 days 8/14/22 8/23/22 16 100%PS&E 74 days 8/24/22 11/5/22 100%PS&E 17 100%Design(Including Utilities) 43 days 8/24/22 10/5122 x 18 100%Submittal to City 0 days 10/5/22 10/5/22 j 135 19 City Review 21 days 10/6/22 10/26/22 zo Comment Resolution 10 days 10/27/22 11/5/22 21 Final PS&E Submitted to City 0 days 11/5/22 11/5/22 Final PS&E Submitted to City j 1115 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page RED BUD LANE FEE ESTIMATE EXHIBIT D FEE SCHEDULE-Supplemental Design Services for Plans,Specifications and Estimates PROJECT NAME: Red Bud Lane SWA#2-Utility Improvementsrrraffic Signal PRIME PROVIDER NAME: LJA Engineering,Inc. Date: 4/21/2022 RED BUD LANE PROJECT Senior Project en ee project Senior Utility Utility error CADD GIS Analystfphy GIS TASK DESCRIPTION Engineer! E.I.T. Engineering Admin Total Manager planner Engineer Coordinator Coordinator Tech Operator Cartography Technician FC 145-Project Management Team Coordination Meetings 4.0 4.0 4.0 4.0 160 Supplemental WA Contract Creation 8.0 8.0 16.0 Project Schedule 4.0 4.0 8.0 Document Control 8.0 8.0 Prepare Submittals and QA/QC 36.0 36.0 8.0 80.0 HOURS SUB-TOTALS 52.0 44.0 4.0 4.0 00 0 0 0.0 0.0 0.0 0.0 24.0 128.0 LABOR RATE PER HOUR $230 $180 $160 $135 $160 $122 $120 $85 $110 $95 $70 SUBTOTAL $11,960 $7,920 $640 $540 $o $0 $0 $0 $D 1 $0 $1,680 $22,740 FC 162.3-Traffic Signals Field Visits w/RR Signal M&O Team 1.0 1.0 4.0 6.0 Existing Conditions Layout 1.0 2.0 4.0 10.0 17.0 Proposed Signal Layout 1.0 6.0 8.0 24.0 39.0 Proposed Signal Elevations 1.0 6.0 8.0 20.0 35.0 Proposed Signal Details 1.0 4.0 8.0 20.0 33.0 Proposed Wiring Diagram/Termination Chart 1.0 6.0 8.0 20.0 35.0 Standard SMA/DMA&Foundation Sheets 1.0 1.0 2.0 4.0 8.0 Other Standard Details 1.0 2.0 2.0 5.0 Signal Quantities,Summary Tables and OPC 1.0 2.0 6.0 8.0 17.0 Senior Design Reviews 12.0 1 12.0 HOURSSUB-TOTALS 20.0 �29.0 50.0 108.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 207.0 LABOR RATE PER HOUR $230 0 $160 $135 $160 $122 $120 $85 $110 $95 $70 SUBTOTAL $4,600 20 $8 000 $14 580 $0 $0 $0 $0 $0 $0 $0 $32400 Senior Project or project Senior Utility Utility mor CADD GIS Analyst/ GIS TASK DESCRIPTION Manager Engineer/ Engineer E.I.T. Coordinator Coordinator Engineering Operator Cartography Technician Admin Total Planner Tech FC 163.10-Utility Design 163 10.1 Site Visits 4.0 4.0 8.0 163.10.2 Prepare Exhibits for Utility Meetings 4.0 8.0 12.0 163.10.3 Estimate and Quantity Data Sheet 16.0 32.0 48.0 163.10.4 Project Layout/Horizontal Alignment Layout sheet 4.0 6.0 16.0 26.0 163.10.5 Plan and profile sheets 40.0 250.0 450.0 740.0 163.10.6 Waterline Adjustments 4.0 10.0 40.0 54.0 163.10.7 Tie-in Lines Plan and Profiles 4.0 16.0 24.0 1 44.0 163.10.8 Standard Constmcton Details 2.0 4.0 1 1 6.0 163.10.9 Pressure Reducing Valve Vault 2.0 4.0 10.0 16.0 163 10 10 Senior Design Reviews 56.0 56.0 163 10.11 Project Manual with Technical Specifications 2.0 6.0 10.0 18.0 1631012 Engineer's Opinion of Probable Construction Costs 2.0 6.0 10.0 18.0 163.10.13 Respond to/Address City 60%comments 8.0 16.0 16.0 40.0 163.10.14 Respond to/Address City 90%comments 2.0 6.0 10.0 16.0 163.10.15 Respond to/Address City 100%comments 2.0 6.0 10.0 18.0 163.10.16 Respond to TCEQ comments 2.0 2.0 10.0 14.0 16310 17 Plan Submission to TCEQ 1.0 1.0 4.0 6.0 HOURSSUB-TOTALS 560 73.0 355.0 658.0 0.0 0.0 0.0 0.0 0.0 0.0 00 1142.0 LABOR RATE PER HOUR $230 $180 $160 $135 $160 $122 $120 $85 $110 $95 $70 SUBTOTAL $12,880 $13,140 $56,800 $88,830 $0 $0 $0 $0 $0 $0 $0 $171650 UA ENGINEERING,INC. TOTAL 5226,790.00 Page 1 of 1